Addis Ababa Light Rail
Overview | |||
---|---|---|---|
Native name | የአዲስ አበባ ቀላል ባቡር | ||
Locale | Addis Ababa, Ethiopia | ||
Transit type | Light rail | ||
Number of lines | 2 | ||
Number of stations | 39 | ||
Daily ridership | 200,000[1] | ||
Operation | |||
Began operation | 20 September 2015 | ||
Operator(s) | Ethiopian Railway Corporation, Shenzhen Metro | ||
Number of vehicles | 41 | ||
Technical | |||
System length | 31.6 km (19.6 mi) | ||
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) standard gauge | ||
Electrification | 750V DC[2] Overhead catenary | ||
Top speed | 70 km/h (43 mph) | ||
|
Addis Ababa Light Rail (Amharic: የአዲስ አበባ ቀላል ባቡር) is a light rail transportation system in Addis Ababa, Ethiopia.[3][4] A 17-kilometre (11 mi) line running from the city centre to industrial areas in the south of the city opened on 20 September 2015.[5][6] Service began on 9 November 2015 for the second line (west-east).[7][8] The total length of both lines is 31.6 kilometres (19.6 mi), with 39 stations.[7] Trains are expected to be able to reach maximum speeds of 70 km/h (43 mph).[9]
The railway was contracted by the China Railway Group Limited. The Ethiopian Railways Corporation began construction of the double track electrified light rail transit project in December 2011 after securing funds from the Export-Import Bank of China.[10] Trial operations were begun on 1 February 2015,[9] with several months of testing following that.[11] It is operated by the Shenzhen Metro Group.[12]
Contents
Overview
This light-rail system was the first to be built in sub-saharan Africa.[3][5][6] Of the two line rail lines, the east-west line extends 17.4 kilometres (10.8 mi), stretching from Ayat Village to Torhailoch, and passing through Megenagna, Meskel Square, Legehar and Mexico Square. The north-south line, which is 16.9 kilometres (10.5 mi) in length, passes through Menelik II Square, Merkato, Lideta, Legehar, Meskel Square, Gotera and Kaliti. However, two lines have a common track of about 2.7 km.[10]The common track is the elevated section which runs east to west across the southern edge of the CBD from Meskel Square to Mexico Square, and onwards to Lideta. Trains on the north south line are blue and white, whilst on the east west line they are green and white. The Fares cost 2-6 Ethiopian birr.[5][6] Tickets are bought at orange coloured kiosks next to each station.
The final cost to build the railway was US$475m, with construction taking three years.[6] The Addis Ababa Light Rail was originally to have a total of 41 stations on its two lines, and each train was planned have a capacity to carry 286 passengers. This will enable the light rail transit to provide a transportation service to 15,000 passengers per hour per direction (PPHPD) and 60,000 in all four directions.[10] The railway lines have their own dedicated power grid.[6][13]
Future expansion
There are future plans for extensions in all four directions. According to Getachew Betru, CEO of Ethiopian Railways Corporation, the Ethiopian government indicated that any new line built should be completely grade-separated. Apart from extending the existing lines, two new lines are under consideration by the Ethiopian government. The first one will start at St. George's Cathedral, pass along Mexico Square to the African Union Headquarters and will terminate at Lebu, connecting to the new national rail network. The second line will start at Megenagna Roundabout and passes via Bole Airport, Wello Sefer area, Saris market area and Jommo area and terminates at Lebu.[14]
Rolling stock
Addis Ababa Light Rail operates currently a fleet of 41 three-section 70% low-floor trams manufactured by CNR Changchun.[15]
Lines
- Open 20 September 2015. The .2.7km common from St. Lideta (West) to Meskel Square (East), with 5 stops.
- Open 20 September 2015. The 16.9km Blue Line from Menelik Square (North) to Kaliti (South).
- Open .9 November. 2015. The 17.4km Green Line runs east from Ayat (East) to Tor Hailoch (West), with 22 stops
- Builder China Railway Engineering Corporation
- Cost $US475 million.
See also
References
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 3.0 3.1 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 5.0 5.1 5.2 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 6.0 6.1 6.2 6.3 6.4 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 7.0 7.1 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 9.0 9.1 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 10.0 10.1 10.2 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ http://www.railwaysafrica.com/news/addis-ababa-opens-2nd-lrt-line
External links
- Use dmy dates from November 2015
- Articles that mention track gauge 1435 mm
- Pages with broken file links
- Ethiopia articles missing geocoordinate data
- Transport in Addis Ababa
- Buildings and structures in Addis Ababa
- Light rail in Ethiopia
- Rail transport in Ethiopia
- 750 V DC railway electrification
- Africa rail transport stubs