Carstairs railway station

From Infogalactic: the planetary knowledge core
Jump to: navigation, search

Lua error in package.lua at line 80: module 'strict' not found.

Carstairs National Rail
265px
North end (Glasgow end) of the station
Location
Place Carstairs
Local authority South Lanarkshire
Coordinates Lua error in package.lua at line 80: module 'strict' not found.
Grid reference NS952454
Operations
Station code CRS
Managed by Abellio ScotRail
Owned by Network Rail
Number of platforms 2
Live arrivals/departures, station information and onward connections
from National Rail Enquiries
Annual rail passenger usage*
2004/05  12,329
2005/06 Increase 14,589
2006/07 Decrease 13,766
2007/08 Decrease 13,261
2008/09 Increase 15,002
2009/10 Decrease 11,098
2010/11 Decrease 10,680
2011/12 Increase 13,548
- Interchange 3,113
2012/13 Increase 20,610
- Interchange Decrease 3,103
Passenger Transport Executive
PTE SPT
History
15 February 1848 Station opened
National RailUK railway stations

A B C D E F G H I J K L M N O P Q R S T U V W X Y Z

* Annual estimated passenger usage based on sales of tickets in stated financial year(s) which end or originate at Carstairs from Office of Rail and Road statistics. Methodology may vary year on year.
UK Railways portal

Carstairs railway station in South Lanarkshire, Scotland, is a major junction station on the West Coast Main Line (WCML), situated close to the point at which the lines from London Euston to Glasgow Central and Edinburgh diverge. Constructed originally by the Caledonian Railway, the station is operated today by Abellio ScotRail and is also served by one First TransPennine Express trains service per day between Preston and Glasgow Central. All other services by First TransPennine Express and services operated by CrossCountry, Virgin Trains East Coast and Virgin Trains West Coast pass the station, but do not stop.

Locale

Just south of the station, there is an important triangular junction (Carstairs Junction) where the WCML divides. The north-westerly route goes via Motherwell to Glasgow and the north-easterly route goes towards Edinburgh, where the East Coast Main Line begins. The southbound route goes towards Carlisle and London. The line between Edinburgh and Glasgow is the only part of the West Coast Main Line used by Virgin Trains East Coast services. Carstairs is also a marshalling point and the final boarding point (both sleeping car and overnight coach) in Scotland for the Lowland Caledonian Sleeper trains from Glasgow and Edinburgh to London Euston.

Northbound (Down) WCML services usually pass the station on an avoiding line (known as the Down Main), away from the platform line (known as the Down platform), but northbound services coming off the chord from Edinburgh (ECML and Cross Country) usually pass Platform 1: they can be signalled from Platform 2, but this rarely happens. However, all southbound (Up) services must pass Platform 2 (on the Up Main), as there is no avoiding line on that side of the station. The Up Main and Down Platform lines are both signalled for bi-directional working, and are often used as passing loops for passenger and freight services. For example, the early morning departure for Glasgow Central from North Berwick will wait at the Down Platform as a fast Transpennine service from Manchester passes.

There is also the Down Passenger Loop (which is adjacent to the station) and the Up Passenger Loop (immediately to the north of the station) which are both used to stop freight services while faster passenger services pass. It is also common for northbound freights to be stopped in both the Down Platform line and Down Passenger Loop and for fast passenger services to be passed between them on the Down Main.

Electrification

File:Down platform at Carstairs railway station on 18 June 1983.jpg
Down platform and old station building in June 1983

The route through the station was electrified in 1974 electrification scheme that covered the West Coast Main Line between Weaver Junction and Glasgow Central. As part of this the station was re-signalled. The critical point was the connection from the Edinburgh on a minimum radius curve to provide a connection into the down platform whilst avoiding the installation of a diamond crossing. The requirement for superelevation through the Up platform for 90 mph running required deep ballasting the side effect of which required the platform to be raised. The original station buildings were being retained therefore continuous railings were provided to prevent passengers inadvertently falling down from one level to the other.[1] This height difference has now been removed as the original station buildings were demolished and replaced with a more modern alternative and the entire platform was levelled off. The only remnant of the original station buildings to remain was the integral footbridge, now adapted as a stand-alone structure.

The route to Edinburgh was not part of the 1970s scheme, however was included as part of the late 1980s ECML scheme, with electric services starting to use the line in 1989 (prior to the commencement of the main East Coast Main Line (ECML) electric services).[2]

Services

Historical

Carstairs was an important junction station where northbound West Coast Main Line trains were split into separate portions for Glasgow, Edinburgh and (to a lesser extent) Stirling and Perth, and for the corresponding combining of southbound trains. However, the introduction of push-pull operation on the WCML and the availability of surplus HST sets for Cross Country traffic (as a result of the ECML electrification) largely eliminated this practice in the early 1990s. Apart from the sleeping car trains, express traffic through Carstairs now consists of fixed-formation trains which do not require to be remarshalled en route. As a result, few express trains now call at Carstairs. There were some local stopping services to Edinburgh and Glasgow, but they where relatively infrequent, Before December 2012, Only 2 trains per day to North Berwick called and only 5 trains to Glasgow(3 trains went to Dalmuir and 2 to Central and 1 terminated at Motherwell) There was very large gaps in between trains with the 2 Edinburgh bound trains calling at 07:49 and then again at 1540 as with the Glasgow trains a 9 hour gap from 0755-1841.

2015

Monday to Saturday, there is a roughly two-hourly service between Edinburgh and Glasgow Central via Carstairs with various extensions to North Berwick and Ayr throughout the day. There is also a local peak time service to and from Glasgow, with the morning run continuing to Garscadden. In the evening, the service returns to Motherwell upon completion of the Anderston - Carstairs 'peak' service. Additionally in the morning, one First TransPennine Express service from Preston to Glasgow Central calls at Carstairs to allow for an earlier connection to Edinburgh from the North West of England. There is no return service heading south. Passengers must travel to Glasgow, Motherwell or Edinburgh for travel south of the border.

Serco Caledonian Sleepers Ltd also call at Carstairs six times per week (no service on Saturday evenings) whilst working services between Edinburgh/Glasgow and London Euston. These services combine/split at Carstairs and is the last remaining service to do so at this location.

Virgin Trains West Coast, CrossCountry and Virgin Trains East Coast operate services between Glasgow Central and various locations in England however these services do not call at Carstairs and merely pass through.

Preceding station National Rail National Rail Following station
Kirknewton   Abellio ScotRail
North Berwick Line
  Carluke
Terminus   Abellio ScotRail
Argyle Line
  Carluke
Carlisle   Caledonian Sleeper
Lowland Caledonian Sleeper
  Motherwell
    Edinburgh Waverley
Lockerbie   First TransPennine Express
TransPennine North West
Preston-Glasgow Central
Limited Service
  Motherwell
Historical railways
Thankerton
Line open; Station closed
  Caledonian Railway Main Line
to Greenhill Junction
  Cleghorn
Line open; Station closed
  Caledonian Railway Main Line
from Edinburgh
  Carnwath
Line open; Station closed
Terminus   Dolphinton Branch
Caledonian Railway
  Bankhead
Line and Station closed

References

Notes

  1. Nock (1974)
  2. Electrifying the East Coast Route; Peter Semmens (1991) ISBN 0-85059-929-6.

Sources

  • Lua error in package.lua at line 80: module 'strict' not found.
  • Lua error in package.lua at line 80: module 'strict' not found.
  • Lua error in package.lua at line 80: module 'strict' not found.