Energoatom

From Infogalactic: the planetary knowledge core
Jump to: navigation, search

<templatestyles src="Module:Hatnote/styles.css"></templatestyles>

Energoatom
state enterprise
Industry Nuclear power
Headquarters Kiev, Ukraine
Area served
Ukraine
Key people
Yuriy O. Nedashkovsky (President)[1]
Products Electricity
Owner Government of Ukraine
Parent Ministry of Fuel and Energy (Ukraine)
Divisions Nuclear Power Plants, Wind Power Plants, Supporting Agencies
Website www.atom.gov.ua

Energoatom, full name National Nuclear Energy Generating Company of Ukraine (Ukrainian: НАЕК "Енергоатом") is a Ukrainian state enterprise operating all four nuclear power stations in Ukraine.[2]

Ukraine ranks seventh in the world and fifth in Europe in terms of the number of nuclear reactors operated, total capacity and electricity produced.

The Ukrainian nuclear power industry employs more than 38,000 people. In recent years, using only 69,0% of the installed capacity, nuclear power plants have under maximum autumn and winter loads generated about 53% of the country's electricity. Overall the share of electricity generation is about 47%. Currently there are 15 operating power units,[2] including 13 units with VVER-1000 (PWR) reactors, and 2 units of the newer subtype of the VVER-440 reactor.

Energoatom is engaged in construction of new power units and rehabilitation of those in operation, purchases of nuclear fuel and removal of radioactive waste, establishing a national infrastructure for spent fuel and radioactive waste management, maintenance of safety at nuclear facilities, retraining and qualification upgrades, and resolution of social problems of the employees.

According to the Energy Strategy of Ukraine, NNEGC Energoatom plans to:

  • select 3–4 new sites for construction of new NPPs;
  • develop a feasibility study for construction of power units to a total capacity of 6 GW on new sites during 2019–2021;
  • substantiate and make a decision on service life extension of the pilot reactor Rivne Unit 1 and subsequently the rest of the fleet depending upon design service life termination periods;
  • commission Khmelnitsky Unit 2 and Unit 3 for a total capacity of 2 GW by the year 2016.

In the longer term, the company intends to:

  • put into operation replacement and additional power units to total capacity of 12.5 GW from 2024 through 2030;
  • launch decommissioning activities for six power units once their extended service life terminates;
  • initiate construction of new capacities rated in total at 6.5 GW in 2027–2030 to allow for commissioning after 2030.

List of companies

Nuclear Power Stations

Name Location Coordinates Type Capacity, MWe Operational Notes
Khmelnytsky Netishyn Lua error in package.lua at line 80: module 'strict' not found. VVER 1000 1987-
Lua error in package.lua at line 80: module 'strict' not found. VVER 1000 2004-
Rivne Kuznetsovsk Lua error in package.lua at line 80: module 'strict' not found. VVER 402 1980-
Lua error in package.lua at line 80: module 'strict' not found. VVER 417 1981-
Lua error in package.lua at line 80: module 'strict' not found. VVER 1000 1986-
Lua error in package.lua at line 80: module 'strict' not found. VVER 1000 2004-
South Ukraine Yuzhnoukrainsk Lua error in package.lua at line 80: module 'strict' not found. VVER 1000 1982-
Lua error in package.lua at line 80: module 'strict' not found. VVER 1000 1985-
Lua error in package.lua at line 80: module 'strict' not found. VVER 1000 1989-
Zaporizhzhia Enerhodar Lua error in package.lua at line 80: module 'strict' not found. VVER 1000 1984- largest nuclear power plant in Europe
Lua error in package.lua at line 80: module 'strict' not found. VVER 1000 1985-
Lua error in package.lua at line 80: module 'strict' not found. VVER 1000 1986-
Lua error in package.lua at line 80: module 'strict' not found. VVER 1000 1987-
Lua error in package.lua at line 80: module 'strict' not found. VVER 1000 1989-
Lua error in package.lua at line 80: module 'strict' not found. VVER 1000 1995-

Other Power Stations

Name Type Location Coordinates Generator Capacity, MWe Operational Number
Donuzlav Wind Novoozerne Lua error in package.lua at line 80: module 'strict' not found. USW 56-100 6.82 1993- 62
Sudak Wind Meganom Ridge Lua error in package.lua at line 80: module 'strict' not found. USW 56-100 3.85 35
Chornomorske Wind Chornomorske Lua error in package.lua at line 80: module 'strict' not found. T600-48 1.2 2
Tashlyk Pumped Storage Yuzhnoukrainsk Lua error in package.lua at line 80: module 'strict' not found.  ? 302 2006- 2
Oleksandrivka Hydroelectric Oleksandrivka[disambiguation needed] Lua error in package.lua at line 80: module 'strict' not found.  ? 11.5 1999- 2
  • Bolhrad Steam Gas Power Plant (planning)

Supporting companies

  • State Concern "Yaderne Palyvo" (Nuclear Fuel)
    • Eastern Ore refining combine
    • Smoly (formerly Dnieper Chemical Factory)
    • Dnieper Plant of Precision Pipes
    • Ukrainian Science Researching and Design Projecting Institute of Industrial Technology (UkrNDPRI)

Unfinished Nuclear Power Plants

  • Chyhyryn Nuclear Power Plant
  • Crimea Nuclear Power Plant
  • Odessa Nuclear Thermo Electric Plant
  • Kharkiv Nuclear Thermo Electric Plant

See also

References

External links