Grand Junction Railroad and Depot Company

From Infogalactic: the planetary knowledge core
Jump to: navigation, search

<templatestyles src="Module:Hatnote/styles.css"></templatestyles>

Grand Junction Railroad and Depot Company
Grand Junction Railroad and Depot Company map.png
Route of the Grand Junction Railroad
Overview
Locale Boston, Massachusetts
Termini East Boston Terminal
Technical
Line length Lua error in Module:Convert at line 1851: attempt to index local 'en_value' (a nil value).
Track gauge 1,435 mm (4 ft 8 12 in) standard gauge
Loading gauge Minimal Plate B
Route map
to Worcester & Albany
to South Station
Charles River
Massachusetts Avenue
to Fitchburg
to North Station
to North Station
to Haverhill & Portland
Mystic River
Chelsea Station
to Newburyport
Chelsea Creek
to Newburyport
East Boston Terminal
Charles River

The Grand Junction Railroad is an 8.55-mile (13.76 km) long railroad in the Boston, Massachusetts area, connecting the railroads heading west and north from Boston. Most of it is still in use, carrying scrap either inbound or outbound to the Schnitzer scrap yard on the Everett waterfront[1] or freight to the Chelsea Produce Market,[2] and non-revenue transfers of Amtrak and MBTA passenger equipment between the lines terminating at North Station and South Station. The line is also notable for its railroad bridge over the Charles River that passes under the Boston University Bridge between Boston and Cambridge, MA. This is one of three places worldwide where, simultaneously, an airplane could pass over an automobile passing over a train passing over a boat. The other locations where this phenomenon is claimed to happen is the Steel Bridge over the Willamette River in Portland, Oregon and the 25 de Abril Bridge over the Tagus River in Lisbon and Pragal, Portugal.[3]

History

An Amtrak Genesis locomotive crosses Main Street in Cambridge.

The railroad (full name Grand Junction Railroad and Depot Company) was chartered April 24, 1847 to connect the railroads entering Boston from the north and west with its wharves in East Boston. This was a rechartering of the Chelsea Branch Railroad, incorporated April 10, 1846.

The first section to open was from East Boston to the Boston and Maine Railroad in Somerville, opened in 1849. It began at a huge waterfront yard complex on Boston Harbor, occupying the space east of the Eastern Railroad terminal and west of the Boston, Revere Beach and Lynn Railroad terminal. The line headed north with two tracks (minimum) just east of the Eastern Railroad's line, crossing at-grade and splitting to the west just south of Curtis Street, with a crossover track between the two lines south of the crossing (allowing Eastern Railroad trains from their terminal to use the Grand Junction). In 1905, the Grand Junction Railroad in East Boston was rebuilt into a below-grade two-track line, and the Eastern Railroad line was truncated to just north of the split.

Next the Grand Junction crossed Chelsea Creek into Chelsea. It passed north of downtown Chelsea and through outlying areas of Everett before crossing the Mystic River into Somerville and running along the east side of the Boston and Maine Railroad's main line towards Boston. It soon crossed the border into Charlestown, part of Boston. Just south of Cambridge Street, the Grand Junction junctioned with and crossed the B&M. After crossing the B&M, the extension immediately crossed the Mystic River Branch of the Boston and Lowell Railroad, just before crossing back into Somerville. In Cambridge it crossed under the old B&L mainline (with track connections) and merged with the Fitchburg Railroad.

In March 1852 the line was leased to the Eastern Railroad between the B&M in Somerville and Salem Turnpike (now called Broadway) in Chelsea. The Eastern Railroad, then ending in East Boston, used the line for downtown Boston access, building a cutoff in 1854 from their main line to the Grand Junction in Chelsea, and building a new line splitting from the Grand Junction just west of the B&M and B&L Mystic River Branch crossing and running just west of the B&M into downtown. The Saugus Branch Railroad, bought by the Eastern April 30, 1852, was realigned in 1855 at its south end to feed into the Grand Junction rather than the B&M.

The rest of the line was built in 1856, connecting to the Boston and Worcester Railroad in Allston, now part of Boston. Instead of merging with the Fitchburg Railroad, it continued west along its north side for a bit (passing under the Boston and Lowell Railroad's new alignment) before turning south, crossing the Fitchburg Railroad at-grade onto its own alignment through Cambridge. A track connection was provided with the Fitchburg Railroad, connecting the East Boston-bound Grand Junction to the Fitchburg-bound Fitchburg.

After running through Cambridge along what was once the shore of the Charles River and is now a rough border between the main campus of the Massachusetts Institute of Technology and the rest of Cambridge, the line crossed the river diagonally on a bridge under the Essex Street Bridge (now the Boston University Bridge) and joined with the Boston and Worcester Railroad (after 1867, the Boston and Albany Railroad).

The line was reorganized as the East Boston Freight Railroad in 1862, and the Boston and Albany bought the property in 1869. It passed with the B&A into larger companies - the New York Central Railroad, Penn Central and Conrail. On February 28, 1955 the counterweight fell off the Chelsea Creek drawbridge, taking the bridge permanently out of service; subsequently B&A trains reached East Boston from Chelsea using B&M trackage rights via Revere. B&A service to East Boston ended around 1972.

A small footnote is the Union Railroad, which was incorporated May 10, 1848 for the same purpose, and was authorized to merge with the Grand Junction February 25, 1854.

Current status

Grand Junction Railroad and MIT (view faces southwest from Massachusetts Avenue)
Circus Train behind MIT in 1984

The line is currently owned by the MBTA and controlled by the MBCR dispatcher (see MBCR Bulletin 8-41c). Prior to June 17, 2010, the line was owned by CSX Transportation,[4] except for the East Boston section, which Guilford Rail System uses (since reconnected to the old Eastern Railroad East Boston line). MIT owns a section of the right-of-way in Cambridge from a point west of Pacific Street to Broadway, with an easement granted to CSX. The section of the line formerly used by the Eastern through Somerville, Everett and Chelsea is now used by the MBTA's Newburyport/Rockport Line, and the line west of there is used by the MBTA to bring Commuter Rail trains between the two halves of its system, in lieu of a North-South Rail Link, and by CSX to haul freight (a daily train with produce to the Chelsea Produce Market and scrap metal to a processor in Everett).[5] It is also used by Amtrak to transfer its equipment for the Downeaster from North Station to the Amtrak maintenance facility at Southampton Street in Boston. The track loading gauge is the minimal Plate B.[6]

In 2007, after eight years of construction, the East Boston Greenway was opened on land that formerly belonged to the Grand Junction Railroad.[7]

In September 2009, the Commonwealth of Massachusetts finalized[4] an agreement to purchase several CSX rail lines in eastern Massachusetts, including the Grand Junction tracks from the Beacon Park Yard in Allston, through Cambridge.[8] The deal was closed on June 17, 2010.[9]

The Barnum and Bailey Circus train often parks on the Grand Junction while the circus is in Boston.

On November 21, 2012, the Grand Junction Railroad Bridge was closed to all rail traffic due to its poor condition. This was a change from a restriction put in place days earlier, on November 16, which barred freight trains from crossing, as well as restricting MBTA and Amtrak equipment moves to 5 MPH. While emergency repairs were under way, trains moving between the north and south sides of Boston had to be routed via Pan Am Railways trackage between Ayer, Massachusetts and Worcester, Massachusetts (a 100+ mile detour).[10] The bridge reopened in early January 2013, but was closed again in March for major structural repairs,[11] reopening again in June.

Proposals

Structural repairs to the railroad bridge over the Charles River near completion in April 2013.

The City of Cambridge has done a feasibility study concerning adding a "rail with trail" multi-use path to be known as the Grand Junction Community Path from the Charles River Bike Paths at the Boston University Bridge, through MIT, paralleling Cardinal Medeiros Way northeast of Kendall Square, and connecting to the proposed extension of the Somerville Community Path near Twin City Plaza.[12]

The "locally preferred alternative"[citation needed] for the Urban Ring project as of June 2008 calls for routing bus rapid transit along the Grand Junction right-of-way, from George Washington Park in Cambridgeport, over the Charles River. The existing railroad bridge would be widened to add lanes for buses and the path.

In 2010, Lieutenant Governor Tim Murray publicly discussed branching the Framingham/Worcester Line over the Grand Junction to provide MBTA Commuter Rail service from Worcester to North Station.[13][14]

In December 2011, the Massachusetts Department of Transportation announced that "is not pursuing the use of the Grand Junction for increased MBTA Commuter Rail service at this point," opting instead to expand South Station, which would allow more service from Worcester without the need for a North Station route. It further stated: "However, expanding Boston South Station is an enormously complex and expensive project without a specific timeframe. Should the need for increased Commuter Rail capacity become overwhelming in the period prior to the expansion of South Station, MassDOT might reopen the Grand Junction discussion. The use of Grand Junction for Commuter Rail service could meet some of the needs to be provided by an expanded South Station, at much lower cost and with much less time and complexity."[15][16]

The Grand Junction would have been used to carry ethanol by rail to a tank farm in Revere as one of three route options considered in a proposal that underwent state safety and environmental review in 2013. Unit trains consisting of perhaps 60 tank cars would have run at night to deliver the gasoline additive.[17] In the face of community opposition and pressure from the state legislature, the company withdrew its proposal on July 2, 2013.[18]

The Grand Junction railroad bridge over Chelsea Creek has been removed and part of the eastern-most right-of-way has been converted into the Martin A. Coughlin Bypass Road, a two-lane route for commercial traffic to and from Logan Airport that opened November 26, 2012.[19] In October 2013, after several months of planning, MassDOT announced funding to convert the section from Eastern Avenue to Sixth Street into a Silver Line busway and a parallel $3 million multi-use greenway.[20][21]

In 2014, the western part of the line was included in a proposal to connect a proposed West Station with North Station, with the creation of an additional infill station on the line in Cambridge.[22]

References

Notes

  1. Atlantic Northeast Rails & Ports 14 No.12B 10 January 2015
  2. Lua error in package.lua at line 80: module 'strict' not found.
  3. http://www.bu.edu/today/2009/icons-among-us-the-bu-bridge/
  4. 4.0 4.1 Lua error in package.lua at line 80: module 'strict' not found.
  5. Video of freight train on Grand Junction
  6. CSX loading gauge map
  7. Lua error in package.lua at line 80: module 'strict' not found.
  8. Lua error in package.lua at line 80: module 'strict' not found.
  9. Lua error in package.lua at line 80: module 'strict' not found.
  10. Lua error in package.lua at line 80: module 'strict' not found.
  11. http://www.universalhub.com/2013/train-bridge-across-charles-repaired
  12. Lua error in package.lua at line 80: module 'strict' not found.
  13. Lua error in package.lua at line 80: module 'strict' not found.
  14. Lua error in package.lua at line 80: module 'strict' not found.
  15. MBTA Dec 8, 2011 Meeting Summary
  16. MBTA Dec 8, 2011 Meeting Presentation
  17. Study of the Safety Impacts of Ethanol Transportation by Rail through Boston, Cambridge, Chelsea, Everett, Somerville, and Revere, MassDOT 2013
  18. Lua error in package.lua at line 80: module 'strict' not found.
  19. Massport Opens Road for Commercial Traffic, 2012
  20. Lua error in package.lua at line 80: module 'strict' not found.
  21. Lua error in package.lua at line 80: module 'strict' not found.
  22. Lua error in package.lua at line 80: module 'strict' not found.

Bibliography

Script error: No such module "Attached KML".

External links