HVDC Gezhouba–Shanghai

From Infogalactic: the planetary knowledge core
Jump to: navigation, search
HVDC Gezhouba–Shanghai
Location
Country China
Province Hubei, Anhui
Coordinates Lua error in package.lua at line 80: module 'strict' not found.
Lua error in package.lua at line 80: module 'strict' not found.
General direction west–east
From Gezhouba
To Nanqiao
Ownership information
Operator China Southern Power Grid
Construction information
Manufacturer of substations ABB
Contractors ABB, Siemens
Construction started 1985
Commissioned 1989
Technical information
Type overhead transmission line
Type of current HVDC
Total length Lua error in Module:Convert at line 1851: attempt to index local 'en_value' (a nil value).
Power rating 1,200 MW
AC Voltage 500 kV (both ends)
DC Voltage ±500 kV
Number of poles 2

The HVDC Gezhouba–Shanghai is a high voltage direct current electric power transmission system between Gezhouba and Nanqiao near Shanghai, China put in service in 1989. The bipolar 1,046-kilometre (650 mi) line is rated at 500 kV and a maximum power of 1,200 MW.

Between 2008 and 2011 the towers of the most part of the line, which were almost guyed towers capable of carrying two conductors were replaced by new free-standing line towers for 4 conductors in order to install the conductors for the HVDC Hubei-Shanghai on them. This 970 km long line, which is also a bipolar HVDC with an operating voltage of 500 kV runs from Jingmen to Fenjing and has a transmission capacity of 3000 MW.

HVDC Hubei-Shanghei shares also the grounding electrode of HVDC Gezhouba–Shanghai for the Nanqiao terminal. In most parts of its length, the electrode line of HVDC Gezhouba–Shanghai carries also the electrode line of HVDC Hubei-Shanghei. HVDC Gezhouba–Shanghai carries between Fenjing and Nanqiao also the electrode line of HVDC Hubei-Shanghei in most part of its length on its towers.

The grounding electrode of HVDC Hubei-Shanghai at Chujiahu is also used by HVDC Three Gorges-Changzhou.

[1][2]

Sites

Site Coordinates
China - Gezhouba Static Inverter Plant ( GeSha) Lua error in package.lua at line 80: module 'strict' not found.
China - Jingmen Static Inverter Plant ( HVDC Hubei - Shanghai) Lua error in package.lua at line 80: module 'strict' not found.
China - Chujiahu Grounding Electrode ( HVDC Hubei - Shanghai) Lua error in package.lua at line 80: module 'strict' not found.
China - Liufangtei HVDC Gezhouba–Shanghai HVDC Hubei - Shanghai Split Lua error in package.lua at line 80: module 'strict' not found.
China - HVDC Gezhouba - Shanghai (old) - Maiyuan PLC-Repeating Station Lua error in package.lua at line 80: module 'strict' not found.
China - Fenjing HVDC Gezhouba–Shanghai HVDC Hubei - Shanghai Split Lua error in package.lua at line 80: module 'strict' not found.
China - Fenjing Static Inverter Plant ( HVDC Hubei - Shanghai) Lua error in package.lua at line 80: module 'strict' not found.
China - Caijiacun HVDC Gezhouba–Shanghai HVDC Hubei - Shanghai electrode line split Lua error in package.lua at line 80: module 'strict' not found.
China - Wangjiatiantou HVDC Gezhouba–Shanghai HVDC Hubei - Shanghai - electrode line split Lua error in package.lua at line 80: module 'strict' not found.
China - Malucun HVDC Gezhouba–Shanghai HVDC Hubei - Shanghai - electrode line split Lua error in package.lua at line 80: module 'strict' not found.
China - Nan Qiao Static Inverter Plant ( GeSha) Lua error in package.lua at line 80: module 'strict' not found.
China - Liaoxiangcun HVDC Gezhouba–Shanghai HVDC Hubei - Shanghai - ground electrode Lua error in package.lua at line 80: module 'strict' not found.

References

  1. Lua error in package.lua at line 80: module 'strict' not found.
  2. Lua error in package.lua at line 80: module 'strict' not found.

External links


<templatestyles src="Asbox/styles.css"></templatestyles>

<templatestyles src="Asbox/styles.css"></templatestyles>