Interstate 75 in Georgia

From Infogalactic: the planetary knowledge core
Jump to: navigation, search

<templatestyles src="Module:Hatnote/styles.css"></templatestyles>

Interstate 75 marker

Interstate 75
<mapframe frameless="1" width="290" height="300" align="center">{{Wikipedia:Map data/Wikipedia KML/Interstate 75 in Georgia}}</mapframe>
I-75 highlighted in red
Route information
Maintained by GDOT
Length: 355.11 mi[3] (571.49 km)
Existed: 1963[1][2] – present
Major junctions
South end: I-75 at Florida state line
  <templatestyles src="Plainlist/styles.css"/>
North end: I-75 at Tennessee state line
Location
Counties: Lowndes, Cook, Tift, Turner, Crisp, Dooly, Houston, Peach, Crawford, Bibb, Monroe, Lamar, Butts, Spalding, Henry, Clayton, Fulton, Cobb, Cherokee, Bartow, Gordon, Whitfield, Catoosa
Highway system
  • Georgia State Routes
SR 74 SR 75
SR 400 SR 401 SR 402

Interstate 75 (I-75) in the U.S. state of Georgia travels north–south along the U.S. Route 41 (US 41) corridor in the central part of the state, traveling through the cities of Valdosta, Macon, and Atlanta. It is also designated—but not signed—as State Route 401 (SR 401).

In downtown Atlanta, I-75 joins with I-85 as the Downtown Connector. The segment from SR 49 in Byron to I-16 in Macon is part of the Fall Line Freeway and may be incorporated into the eastern extension of I-14, which is currently entirely within Central Texas and is proposed to be extended to Augusta.[4]

Route description

I-75 co-signed with I-85 in downtown Atlanta

I-75 is the longest Interstate Highway within Georgia. It enters the state near Valdosta, and it continues northward through the towns of Tifton and Cordele until it reaches the Macon area, where it intersects with I-16 eastbound towards Savannah. For northbound traffic, I-475 provides a relatively straight bypass west of that city and I-75's route.

After Macon, I-75 passes the small town of Forsyth. The freeway reaches no major junctions again until in the Atlanta metropolitan area. The first metropolitan freeway met is I-675, then followed by the Atlanta "Perimeter" bypass, I-285. It crosses inside the Perimeter and heads north several miles towards the Atlanta city center. I-75 then runs concurrently with I-85 due north over the Downtown Connector through the central business district of Atlanta. After the two Interstates split, I-75 makes a beeline northwest, crossing outside the I-285 Perimeter and heading towards the major suburban city of Marietta. This section of I-75 just north of I-285 has 15 through lanes, making it the widest roadway anywhere in the Interstate Highway System.[5] North of Marietta, the final major junction in the Atlanta metropolitan area is the I-575 spur. I-75 then traverses the hilly northern Georgia terrain as it travels towards Chattanooga, Tennessee.

The 180-mile-long (290 km) section of I-75 from the northern I-475 intersection to the I-24 intersection in Chattanooga is one of the longest continuous six-lane freeways in the United States (some segments along this corridor have as many as 16 lanes).[citation needed]

Due to recent lane widening in southern Georgia completed in 2011,[6] the only four-lane section of I-75 in Georgia is bypassed by six-lane I-475; along this route there are at least six lanes from the Alligator Alley portion of I-75 in Naples, Florida to I-24 in Chattanooga (with the exception of a four-lane overpass on I-475 over a railroad track in Macon).

The entire length of I-75 in Georgia is part of the National Highway System, a system of routes determined to be the most important for the nation's economy, mobility, and defense.[7][8][9][10][11][12][13]

History

1950s

The highway that would eventually become I-75 in Georgia was an unnamed expressway that was open in 1951 from the southern part of Atlanta to University Avenue. It was projected from University Avenue to Williams Street in downtown Atlanta. This expressway was open from Williams Street to what is now the northern end of the Downtown Connector. It was also proposed from the Downtown Connector to the northwest part of Atlanta.[14][15] By late 1953, this expressway was signed as US 19/US 41 as far north as Lakewood Avenue. It was under construction from the Downtown Connector to Howell Mill Road. It was proposed from Howell Mill Road to the northwest part of Atlanta.[15][16] By mid-1954, the expressway was signed as SR 295 from Lakewood Avenue to University Avenue. It was under construction from the Downtown Connector to US 41/SR 3E, just north of West Paces Ferry Road.[16][17] By mid-1955, the highway was under construction from University Avenue to Glenn Street. It was open from Williams Street to US 41/SR 3E in the central part of Atlanta.[17][18] By mid-1957, the highway was opened from University Avenue to Glenn Street. It was also open from Williams Street to US 41/SR 3E in the northwest part of Atlanta.[18][19]

1960s

By the middle of 1960, a short segment southeast of Williams Street was open.[19][1] By mid-1963, I-75 was signed. It was open from the Florida state line to US 41/SR 7 in Unadilla. It was under construction from Unadilla to just north of the Crawford–Bibb county line. It was open from SR 148 in Bolingbroke to US 23/SR 42 north-northwest of Forsyth. It was open from Glenn Street to Washington Street in downtown Atlanta. It was under construction from US 41/SR 3 in the northwest part of Atlanta to its northern interchange with I-285. It was also under construction from SR 53 in Calhoun to the Tennessee state line.[1][2] Between 1963 and 1965, it was open from US 41/SR 7 in Unadilla to Hartley Bridge Road south-southwest of Macon. It was proposed from Hartley Bridge Road to I-16 in Macon. It was under construction from I-16 to its northern interchange with I-475 near Bolingbroke. It was open from Bolingbroke to near Forsyth. It was under construction from there to SR 155 south of McDonough. It was proposed from there to SR 54 in Morrow. It was under construction from Morrow to US 19/US 41 west of Morrow. It was proposed from that interchange to SR 331 in Forest Park. It was open from Forest Park to West Paces Ferry Road in northwest Atlanta. It was under construction from there to SR 120 in Marietta. It was proposed from Marietta to SR 140 in Adairsville. It was under construction from Adairsville to SR 53 in Calhoun. It was open from Calhoun to the Tennessee state line.[2][20] In 1966, the highway was open from the Florida state line to its southern interchange with I-475 near Macon. It was open from I-16 to US 23/SR 42 near Forsyth. It was open from Forest Park to its northern interchange with I-285.[20][21] In 1967, it was under construction from US 80/SR 74 to I-16 in Macon. It was under construction from near Forsyth to the US 19/US 41 interchange west of Morrow. It was open from Forest Park to SR 120 in Marietta. It was under construction from SR 120 to Allgood Road in Marietta.[21][22] In 1968, the highway was open US 23/SR 42 near Forsyth to SR 20 in McDonough. It was under construction from McDonough to SR 54 in Morrow. It was open from Morrow to Allgood Road in Marietta. It was under construction from US 411/SR 61 near Cartersville to SR 140 in Adairsville.[22][23] In 1969, the highway was under construction from its southern interchange with I-475 to I-16 in Macon. It was open from I-16 to Allgood Road in Marietta.[23][24]

1970s

I-75 near Dalton

In 1971, it was open from the Florida state line to Allgood Road in Marietta.[25][26] In 1973, it was under construction from Marietta to SR 92 in Acworth.[27][28] In 1974, the highway was under construction from Emerson to US 411/SR 61 near Cartersville.[28][29] The last segment of I-75 in Georgia, located between Emerson and Cartersville, opened on December 21, 1977.[30]

1980s

Work to increase lanes from six to eight on I-20, I-75, I-85, and I-285 and ten lanes on the downtown connector involved 126 total miles and was phased over 13 years between 1976 and 1988. The improvement campaign also included elimination of sharp curves and grades, left-hand exits, excessive interchanges, and short acceleration/deceleration lanes. So as to offer a bypass around construction through the center of the city, the perimeter road (I-285) was completed first. The radiating expressways were then upgraded, and the last phase was reconstruction of the depressed sections through downtown Atlanta. By June 1983, some $252 million in discretionary funds had been used to complete most of the highways save for some major interchanges and the downtown section. The eight miles of the downtown section, which includes the 4.4-mile long downtown connector, was the most complicated section of the entire reconstruction. Work was started on it in 1984, and it included redesigning the massive interchange between I-20 and I-75/85 at Memorial Drive where much of the mileage was on structure. The downtown connector was to be widened to ten lanes, and this required quite a bit of right of way acquisition. Many bridges, including the 55 over the connector portion alone, had to be designed and built.[31]

With completion of the Memorial Drive interchange in November 1988, one of the nation’s premier interstate urban expressway reconstruction projects of the late 20th century was completed. The metro Atlanta expressway system stands out for its lane capacity and high design standards. The $1.4 billion estimated cost price tag to rebuild the metro Atlanta interstates nearly equals what was expended on the construction of the rest of the statewide system.[32]

After completion

In addition to the general-purpose lanes added in the 1980s, provisions for high-occupancy vehicle (HOV) lanes and dedicated on-ramps at Williams Street, Piedmont Avenue, and Memorial Drive were built, and were subsequently converted to HOV usage in 1996 on the Downtown Connector. In 1996, HOV lanes were also added from I-285 on the south side of Atlanta to I-285 on the north side of Atlanta.

In 1998, the portion of I-75 that from the Chattahoochee River north to the Tennessee state line was named the Larry McDonald Memorial Highway.[33] Larry McDonald, a conservative Democratic representative to Congress, was aboard Korean Air Lines Flight 007 when it was shot down by the Soviets on September 1, 1983. He was the only sitting Congressman to be reportedly killed by the Soviets during the Cold War.

I-75 was also designated as the Horace E. Tate Freeway between I-85 to I-285 northwest of downtown Atlanta, in honor of Horace E. Tate, who was a State senator in 1974.

I-75 and I-85 signs near downtown Atlanta

Until 2000, the state of Georgia used the sequential interchange numbering system on all of its Interstate Highways. The first exit on each highway would begin with the number "1" and increase numerically with each exit. In 2000, the Georgia Department of Transportation switched to a mileage-based exit system, in which the exit number corresponded to the nearest milepost.[34]

In March 2007, I-75 in Atlanta (the HOV ramp serving Northside Drive) was the site of the Bluffton University bus crash.

The highway had a lane widening project completed in 2011, allowing the entirety of the interstate in Georgia to be three lanes in each direction.[6]

On January 28, 2017, the new Peach Pass-only South Metro Express Lanes from SR 155 to SR 138 and I-675, opened.[35]

On September 8, 2018, new Northwest Corridor Express Lanes from the I-285/I-75 interchange to Hickory Grove Road and from I-75/I-575 interchange to Sixes Road have opened, the lanes require a Peach Pass to use.[36]

Future

The I-75/I-16 interchange is being revamped with extra ramps to and from US 23/US 129/SR 49.[37] GDOT estimates that the final portion of the project will be bid on in 2023.

The segment of I-75 from SR 49 in Byron to I-16 in Macon is part of the Fall Line Freeway and may be incorporated into the eastern extension of I-14, which is currently entirely within Central Texas and is proposed to be extended to Augusta.[38]

Exit list

Note: exit numbers along Georgia Interstates were renumbered in 1999 and 2000 to be mileage based instead of being sequential.[39]

County Location mi[40] km Old exit[41] New exit Destinations Notes
Florida state line 0.00 0.00 I-75 south (SR 93) – Lake City Continuation into Florida
Lowndes 1.53 2.46 1 2 Bellville, Lake Park
Lake Park 4.77 7.68 2 5 SR 376 (Lakes Boulevard) – Lake Park
10.58 17.03 3 11 SR 31 – Clyattville, Valdosta, Madison, Florida
12.83 20.65 13 Old Clyattville Road – Valdosta
Valdosta 15.91 25.60 4 16 I‑75 Bus. north / US 84 / US 221 / SR 38 – Valdosta, Quitman Southern terminus of I-75 Bus.
17.94 28.87 5 18 SR 133 – Valdosta, Moultrie
21.71 34.94 6 22 I‑75 Bus. south / US 41 south (North Valdosta Road / SR 7 south) Southern end of US 41/SR 7 concurrency; northern terminus of I-75 Bus.
Hahira 28.73 46.24 7 29 US 41 north (SR 7 north) / SR 122 – Hahira, Barney, Lakeland Northern end of US 41/SR 7 concurrency
Cook Cecil 32.39 52.13 8 32 Old Coffee Road – Cecil
Adel 37.52 60.38 9 37 Adel
39.26 63.18 10 39 SR 37 – Adel, Moultrie, Nashville
Sparks 41.42 66.66 11 41 Rountree Bridge Road – Sparks
44.88 72.23 12 45 Barneyville Road
Lenox 48.66 78.31 13 49 Kinard Bridge Road – Lenox
Tift 54.96 88.45 14 55 Eldorado, Omega
59.04 95.02 15 59 I‑75 Bus. (Southwell Boulevard) – Tifton
60.30 97.04 16 60 South Central Avenue
Phillipsburg 61.26 98.59 17 61 Invalid type: road (SR 35 Loop west) to US 319 south / SR 35 south Eastern terminus of SR 35 Loop
Tifton 61.89 99.60 18 62 US 82 / SR 520 to US 319 – Tifton, Sylvester
62.44 100.49 19 63A 2nd Street
62.82 101.10 20 63B 8th Street
64.06 103.09 21 64 I‑75 Bus. / US 41 – Tifton
66.02 106.25 22 66 Brighton Road
69.28 111.50 23 69 Chula Brookfield Road
70.89 114.09 24 71 Willis Still Road – Sunsweet
Turner 75.17 120.97 25 75 Inaha Road
78.45 126.25 26 78 SR 32 – Sycamore, Ocilla
79.71 128.28 27 80 Bussey Road – Sycamore
Ashburn 82.07 132.08 28 82 SR 107 / SR 112 – Ashburn, Fitzgerald
83.95 135.10 29 84 SR 159 – Ashburn, Amboy
Crisp Arabi 91.86 147.83 30 92 Arabi
96.97 156.06 31 97 SR 33 Conn. – Wenona, Sylvester
Cordele 98.98 159.29 32 99 SR 300 (Georgia–Florida Parkway) – Albany
100.75 162.14 33 101 I‑75 Bus. (16th Avenue East) / US 280 / SR 30 / SR 90 – Cordele, Abbeville
101.80 163.83 34 102 SR 257 (8th Avenue East) – Cordele, Hawkinsville
103.86 167.15 35 104 I‑75 Bus. / Farmers Market Road
Dooly 109.54 176.29 36 109 SR 215 (East Union Street) – Vienna, Pitts
112.07 180.36 37 112 SR 27 – Vienna, Hawkinsville
116.88 188.10 38 117 Pinehurst
Unadilla 120.81 194.42 39 121 US 41 / SR 7 – Unadilla
121.79 196.00 40 122 SR 230 – Unadilla, Byromville
Houston 127.17 204.66 41 127 SR 26 – Montezuma, Hawkinsville
Perry 133.80 215.33 134 South Perry Parkway
134.86 217.04 42 135 US 41 (SR 7) / SR 127 / SR 224 (Larry Walker Highway) – Perry
136.69 219.98 43 136 SR 7 (US 341) – Perry, Fort Valley
138.20 222.41 138 Perry Parkway / Thompson Road (US 341 Byp.)
Peach 141.86 228.30 44 142 SR 96 (Housers Mill Road)
144.66 232.81 144 Richard B. Russell Parkway
146.44 235.67 45 146 SR 247 Conn. – Centerville, Warner Robins
Byron 149.69 240.90 46 149 SR 49 (SR 540 west / Fall Line Freeway) – Byron, Fort Valley, Columbus Southern end of SR 540 concurrency
Crawford
No major junctions
Bibb 153.75 247.44 153 Sardis Church Road
155.80 250.74 47 155 Hartley Bridge Road Collector-distributor lanes on southbound exit and northbound entrance
156.81–
156.89
252.36–
252.49
48 156 I‑475 north (SR 408) – Atlanta Northbound exit and southbound entrance; southern terminus of I-475
Macon 160.07 257.61 49 160A US 41 / SR 247 (Pio Nono Avenue) Signed as exit 160 northbound
160.26 257.91 49A 160B Rocky Creek Road Northbound exit is via exit 160.
162.02 260.75 50 162 US 80 / SR 22 (Eisenhower Parkway)
162.84 262.07 51 163 SR 74 west (Mercer University Drive) / Little Richard Penniman Boulevard Eastern terminus of SR 74
163.98–
164.08
263.90–
264.06
52 164
US 41 Bus. / SR 19 (Forsyth Street) / Hardman Avenue – Downtown Macon
165.28 265.99 53 165 I‑16 east (SR 404) / SR 540 east (Fall Line Freeway) – Savannah, Augusta[citation needed] Northern end of SR 540 concurrency; western terminus of I-16, exit 0; Major Bobby Jones MD POW-MIA Interchange undergoing redesign
167.02 268.79 54 167 SR 247 (Pierce Avenue)
169.47 272.74 55A 169 To US 23 / Arkwright Road / Riverside Drive
171.19 275.50 55 171 US 23 / SR 87 / Riverside Drive
172.64 277.84 56 172 Bass Road
Monroe 175.78 282.89 57 175 Pate Road – Bolingbroke Northbound exit and southbound entrance; former SR 19 Spur
177.96 286.40 58 177 I‑475 south (SR 408) – Valdosta Southbound exit and northbound entrance; northern terminus of I-475
180.97 291.24 59 181 Rumble Road – Smarr
185.53 298.58 60 185 SR 18 – Forsyth, Gray
Forsyth 186.38 299.95 61 186 Tift College Drive
187.45 301.67 62 187 SR 83 – Forsyth, Monticello
188.52 303.39 63 188 SR 42 – Forsyth
193.75 311.81 64 193 Johnstonville Road
198.18 318.94 65 198 High Falls Road
Lamar
No major junctions
Butts 201.31 323.98 66 201 SR 36 – Jackson, Barnesville
205.58 330.85 67 205 SR 16 – Griffin, Jackson
Spalding
No major junctions
Henry Locust Grove 212.19 341.49 68 212 Bill Gardner Parkway – Jenkinsburg, Locust Grove, Hampton, Jackson
214.08 344.53 214 Bethlehem Road to US 23, Locust Grove Potential new exit scheduled to open in 2025[42]
216.77 348.86 69 216 SR 155 – McDonough
216.00 347.62 - I-75 South Metro Express Lanes South end of South Metro I-75 Express lanes
218.38 351.45 70 218 SR 20 / SR 81 – McDonough, Hampton
219.00 352.45 - I-75 South Metro Express Lanes Northbound exit and southbound entrance
221.35 356.23 71 221 Jonesboro Road – Lovejoy
222.76 358.50 72 222 Jodeco Road – Flippen Former SR 351
224.62 361.49 73 224 Hudson Bridge Road / Eagles Landing Parkway
228.07 367.04 74 227 I‑675 north (SR 413) to I‑285 – Augusta, Greenville Northbound exit and southbound entrance; southern terminus of I-675
Stockbridge 228.00 366.93 - I-75 South Metro Express Lanes North end of South Metro I-75 Express lanes
228.61 367.91 75 228 SR 138 – Jonesboro, Stockbridge
Clayton 231.33 372.29 231 Mount Zion Boulevard
Morrow 232.81 374.67 76 233 SR 54 – Morrow, Lake City
235.04–
235.15
378.26–
378.44
77 235 US 19 / US 41 / SR 3 (Old Dixie Highway) – Griffin, Jonesboro
237.61 382.40 78 237 SR 331 – Forest Park
238.00 383.02 79 SR 85 (Frontage Road) – Riverdale Northbound exit only
238.25 383.43 80 237A SR 85 south – Riverdale Southbound exit only
238.69 384.13 81A 238A I‑285 east (Atlanta Bypass / SR 407) to I‑85 north – Augusta, Greenville, Charlotte Detour route to I-85 north;[43] I-285 exit 58
81B 238B I‑285 west (Atlanta Bypass / SR 407) – Birmingham, Chattanooga, Domestic Terminals, Columbus, Montgomery
Fulton Hapeville 239.23–
240.10
385.00–
386.40
82, 84, and 85 239 US 19 / US 41 (Central Avenue / SR 3) / C.W. Grant Parkway / Porsche Avenue – International Terminal Additional ramps for direct HOV lane access to/from C.W. Grant Parkway; Exit 82 (northbound) and 84 (southbound) were to C.W. Grant Parkway formerly Aviation Boulevard and Exit 85 was to US 41. Today, they are all marked as exit 239.
239.00 384.63 83 - Frontage Road to Mountain View
Atlanta 242.09 389.61 86 241 Cleveland Avenue
242.65 390.51 87 242 I‑85 south (SR 403) – Domestic Terminals, Columbus, Montgomery Southbound exit and northbound entrance; southern end of I-85/SR 295 concurrency; southern terminus of SR 295
243.27 391.51 88 243 SR 166 (Langford Parkway) – East Point
245.13 394.50 89 244 University Avenue / Pryor Street
246.18 396.19 90 245 Abernathy Boulevard / Capitol Avenue – Turner Field Northbound exit and southbound entrance
246.00 395.90 90A - Georgia Avenue East – Stadium, Grant Park Exits 90 A and B were northbound only and replaced in the 1980s by a single exit 90 (currently exit 245) which was moved several blocks south and not given direct access to Georgia Avenue.
246.00 395.90 90B - Georgia Avenue West – West End Exits 90 A and B were northbound only and replaced in the 1980s by a single exit 90 (currently exit 245) which was moved several blocks south and not given direct access to Georgia Avenue.
246.53 396.75 91 246 Fulton Street / Central Avenue – Downtown Atlanta
246.77 397.14 92 A & B 247 I‑20 (Ralph D. Abernathy Freeway / SR 402) – Augusta, Birmingham I-20 exit 57
247.15 397.75 93 248A Martin Luther King Jr. Drive – State Capitol Southbound exit and northbound entrance
247.72 398.67 94 248B Edgewood Avenue / Auburn Avenue / J.W. Dobbs Avenue Northbound exit and southbound entrance
248.07 399.23 96 A & B 248C SR 10 east (Freedom Parkway) / Andrew Young International Boulevard – Carter Center Exit 96 A went to Freedom Parkway and exit 96 B went to International Boulevard before the 1980s when they were made into one exit.
248.12 399.31 95 248D J.W. Dobbs Avenue / Edgewood Avenue Southbound exit and northbound entrance
248.52 399.95 97 249A Courtland Street – Georgia State University Southbound exit only
248.77 400.36 98 249B Pine Street, Peachtree Street – Civic Center Northbound exit only
248.97 400.68 99 249C Williams Street – Georgia World Congress Center, Mercedes-Benz Stadium No northbound exit (only northbound entrance, southbound entrance, southbound exit); additional ramps for direct HOV access: southbound exit and northbound entrance
249.04 400.79 100 249D Spring Street, West Peachtree Street Northbound exit and southbound entrance
249.17 401.00 100 249D US 29 / US 78 / US 278 / SR 8 (North Avenue) – Georgia Tech Southbound exit and northbound entrance
249.88 402.14 101 and 102 250 10th Street, 14th Street – Georgia Tech Northbound exit and southbound entrance; no northbound entrance to I-85 north; exit 101 went to 10th Street and exit 102 went to 14th Street before the 1980s.
250.22 402.69 101 and 102 250 16th Street, 14th Street, 10th Street Southbound exit and northbound entrance; exit 101 went to 10th Street and exit 102 went to 14th Street before the 1980s.
250.58 403.27 251A 17th Street – Midtown Northbound exit only
250.87 403.74 103 251B I‑85 north (SR 403) to SR 400 north – Greenville, Charlotte Northern end of I-85/SR 295 concurrency; northern terminus of SR 295
251.89 405.38 104 252A US 41 / SR 3 (Northside Drive)
none Southbound exit and northbound entrance
252.25 405.96 105 252B Howell Mill Road
254.27 409.21 106 254 Moores Mill Road
255.50 411.19 107 255 US 41 / SR 3 (Northside Parkway) / West Paces Ferry Road
256.60–
256.76
412.96–
413.22
108 256 Mount Paran Road
Chattahoochee River 257.07–
257.27
413.71–
414.04
Lester and Virginia Maddox Bridge
Cobb 257.65 414.65 258 Cumberland Boulevard
257.90 415.05 - Akers Mill Road HOV-only ramps for northbound exit and southbound entrance
258.40 415.85 109A 259A I‑285 east (Atlanta Bypass / SR 407) – Augusta, Greenville, Charlotte I-285 exit 20
109B 259B I‑285 west (Atlanta Bypass / SR 407) – Birmingham, Montgomery, Tampa I-285 exit 20
258.60 416.18 - I-75 Northwest Corridor Express Lanes South end of Northwest Corridor I-75 Express lanes
259.98 418.40 110 260 Windy Hill Road – Smyrna
Marietta 261.58 420.97 111 261 SR 280 west (Delk Road) – Lockheed, Dobbins AFB Eastern terminus of SR 280
263.29 423.72 112 263 SR 120 – Marietta, Roswell Former SR 120 Loop
265.08 426.60 113 265 SR 120 Alt. – Marietta, Roswell Former SR 120 Loop
267.12 429.89 114A 267A SR 5 Spur north (Canton Road) Southern terminus of SR 5 Spur
114B 267B SR 5 south to US 41 – Marietta Southern end of SR 5 concurrency
268.71 432.45 115 268 I‑575 north (SR 417) / SR 5 north – Ball Ground, Canton Northern end of SR 5 concurrency; southern terminus of I-575; southbound exit is via exit 269.
269.46 433.65 116 269 SR 5 Conn. / Barrett Parkway – Kennesaw Formerly Roberts Road
271.19 436.44 117 271 To north I‑575 / Chastain Road
Kennesaw 272.95 439.27 118 273 Wade Green Road – Kennesaw
Acworth 274.20 441.28 - I-75 Northwest Corridor Express Lanes North end of Northwest Corridor I-75 Express lanes
Cherokee 277.19 446.09 120 277 SR 92 – Acworth
Bartow 278.48 448.17 121 278 Glade Road – Acworth
Emerson 283.58 456.38 122 283 Allatoona Road – Emerson
285.27 459.10 123 285 Red Top Mountain Road
Cartersville 287.82 463.20 124 288 SR 113 – Cartersville
290.20 467.03 125 290 SR 20 – Rome, Canton
Cartersville 293.60 472.50 126 293 US 411 / SR 61 – Chatsworth, White, Cartersville
296.54 477.23 127 296 Cassville–White Road
Adairsville 305.82 492.17 128 306 SR 140 – Adairsville
Gordon 310.42 499.57 310 Union Grove Road
Calhoun 312.44 502.82 129 312 SR 53 – Calhoun, Fairmount, Rome
315.26 507.36 130 315 SR 156 (Redbud Road) – Calhoun
317.29 510.63 131 317 SR 225 – Chatsworth, Calhoun
Resaca 318.67 512.85 132 318 US 41 / SR 3 – Resaca, Calhoun
320.29 515.46 133 320 SR 136 – Resaca, LaFayette
Whitfield 325.93 524.53 134 326 Carbondale Road
328.56 528.77 135 328 SR 3 Conn. – Dalton
Dalton 333.71 537.05 136 333 SR 52 / SR 71 (Walnut Avenue) – Dalton
335.96 540.68 137 336 US 41 / US 76 (SR 2 / SR 3) – Dalton, Rocky Face
341.16 549.04 138 341 SR 201 – Tunnel Hill, Varnell
Catoosa 344.72 554.77 139 345 US 41 / US 76 (SR 2 / SR 3) – Ringgold, LaFayette
348.07 560.16 140 348 SR 151 – Ringgold, LaFayette
350.13 563.48 141 350 SR 2 (Battlefield Parkway) – Fort Oglethorpe
353.70 569.22 142 353 SR 146 – Rossville, Fort Oglethorpe
Tennessee state line 355.10 571.48 I-75 north – Chattanooga Continuation into Tennessee
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

Related routes

File:Georgia I75nb exit 156.jpg
I-75 north at exit 156 in Bibb County in 2016, left 3 lanes are for the Interstate 475 bypass of Macon

There are three auxiliary Interstate Highways related to I-75 in Georgia and a fourth that was proposed. I-175 was a proposed spur from Albany northeast to Cordele. The road was built, but not as a freeway; it is SR 300, the Florida–Georgia Parkway. I-475 is a western bypass of Macon, shortening the trip for through I-75 traffic. I-575 is a spur from near Marietta north to Canton and Nelson, and I-675 is a cutoff from I-75 south of Atlanta north to Interstate 285 (Atlanta's perimeter) - east of I-75.

Additionally, there are three business routes of I-75 in the state. The first Business Loop I-75 (BL I-75) runs through central Valdosta mostly concurrent with U.S. Route 221. The second BL I-75 runs through downtown Tifton mostly concurrent with U.S. Route 41, and a third one that runs through Cordele. There was a former BL I-75 in AdelSparks.

See also

References

  1. 1.0 1.1 1.2 Lua error in package.lua at line 80: module 'strict' not found. (Corrected to June 1, 1960.)
  2. 2.0 2.1 2.2 Lua error in package.lua at line 80: module 'strict' not found. (Corrected to June 1, 1963.)
  3. Lua error in package.lua at line 80: module 'strict' not found.
  4. Lua error in package.lua at line 80: module 'strict' not found.
  5. Lua error in package.lua at line 80: module 'strict' not found.
  6. 6.0 6.1 Lua error in package.lua at line 80: module 'strict' not found.
  7. Lua error in package.lua at line 80: module 'strict' not found.
  8. Lua error in package.lua at line 80: module 'strict' not found.
  9. Lua error in package.lua at line 80: module 'strict' not found.
  10. Lua error in package.lua at line 80: module 'strict' not found.
  11. Lua error in package.lua at line 80: module 'strict' not found.
  12. Lua error in package.lua at line 80: module 'strict' not found.
  13. Lua error in package.lua at line 80: module 'strict' not found.
  14. Lua error in package.lua at line 80: module 'strict' not found. (Corrected to August 1, 1950.)
  15. 15.0 15.1 Lua error in package.lua at line 80: module 'strict' not found. (Corrected to January 1, 1952.)
  16. 16.0 16.1 Lua error in package.lua at line 80: module 'strict' not found. (Corrected to September 1, 1953.)
  17. 17.0 17.1 Lua error in package.lua at line 80: module 'strict' not found. (Corrected to June 1, 1954.)
  18. 18.0 18.1 Lua error in package.lua at line 80: module 'strict' not found. (Corrected to June 1, 1955.)
  19. 19.0 19.1 Lua error in package.lua at line 80: module 'strict' not found. (Corrected to July 1, 1957.)
  20. 20.0 20.1 Lua error in package.lua at line 80: module 'strict' not found.
  21. 21.0 21.1 Lua error in package.lua at line 80: module 'strict' not found.
  22. 22.0 22.1 Lua error in package.lua at line 80: module 'strict' not found.
  23. 23.0 23.1 Lua error in package.lua at line 80: module 'strict' not found.
  24. Lua error in package.lua at line 80: module 'strict' not found.
  25. Lua error in package.lua at line 80: module 'strict' not found.
  26. Lua error in package.lua at line 80: module 'strict' not found.
  27. Lua error in package.lua at line 80: module 'strict' not found.
  28. 28.0 28.1 Lua error in package.lua at line 80: module 'strict' not found.
  29. Lua error in package.lua at line 80: module 'strict' not found.
  30. Lua error in package.lua at line 80: module 'strict' not found.
  31. "http://www.dot.ga.gov/AboutGeorgia/CentennialHome/Documents/Historical%20Documents/HistoricalContextof%20GeorgiaInterstates.pdf"
  32. "http://content.time.com/time/magazine/article/0,9171,968392,00.html"
  33. Lua error in package.lua at line 80: module 'strict' not found.
  34. Lua error in package.lua at line 80: module 'strict' not found.
  35. Lua error in package.lua at line 80: module 'strict' not found.
  36. {{cite web|url=http://www.dot.ga.gov/DS/GEL/NWC}}
  37. Lua error in package.lua at line 80: module 'strict' not found.
  38. Lua error in package.lua at line 80: module 'strict' not found.
  39. Lua error in package.lua at line 80: module 'strict' not found.
  40. Lua error in package.lua at line 80: module 'strict' not found.[dead link]
  41. Lua error in package.lua at line 80: module 'strict' not found.
  42. [1][dead link]
  43. Lua error in package.lua at line 80: module 'strict' not found.

External links

Script error: No such module "Attached KML".

  • I-75 at the Interstate Guide


Interstate 75
Previous state:
Florida
Georgia Next state:
Tennessee