Construction began 2008
Opening date 2014
Construction cost 16.2 billion RMB ($2.4 billion USD)
Dam and spillways
Impounds Jinsha River
Height 155 m (509 ft)
Reservoir
Creates Liyuan Reservoir
Total capacity 727,000,000 m3 (589,388 acre·ft)
Catchment area 220,000 km2 (84,942 sq mi)
Surface area 14.73 km2 (6 sq mi)
Power station
Commission date 2014-2015
Type Conventional
Turbines 4 x 600 MW
Installed capacity 2,400 MW

The Liyuan Dam is a concrete-face rock-fill dam on the Jinsha River on the border of Yulong County and Shangri-La County, Yunnan Province, China. The dam will have an associated hydroelectric power station with a 2,400 MW power station containing 4 x 600 MW generators. Construction on the river diversion for the dam began in 2008.[1][2] It began to impound its reservoir in November 2014 and on December 28, 2014 the first generator was commissioned.[3][4] The second generator was commissioned in July 2015.[5]

The 155 m (509 ft) dam withholds a reservoir of 727,000,000 m3 (589,388 acre·ft), of which 209,000,000 m3 (169,439 acre·ft) is active or "useful" storage. The normal reservoir level is 1,618 m (5,308 ft) above sea level with a minimum of 1,602 m (5,256 ft). The catchment area for the reservoir in the upstream basin is 220,000 km2 (84,942 sq mi) while the reservoir surface area is 14.73 km2 (6 sq mi).

See also

References

  1. Lua error in package.lua at line 80: module 'strict' not found.
  2. Lua error in package.lua at line 80: module 'strict' not found.
  3. Lua error in package.lua at line 80: module 'strict' not found.
  4. Lua error in package.lua at line 80: module 'strict' not found.
  5. Lua error in package.lua at line 80: module 'strict' not found.