Milan Passante railway

From Infogalactic: the planetary knowledge core
(Redirected from Milan Passerby Railway)
Jump to: navigation, search
Milan Passante railway
Overview
Native name Passante ferroviario di Milano
Type Commuter rail
Status operational
Locale Milan, Italy
Website Il Passante
Operation
Opened 1997 (1997)
Operator(s) RFI
Technical
Line length Lua error in Module:Convert at line 1851: attempt to index local 'en_value' (a nil value).
Track gauge 1,435 mm (4 ft 8 12 in)
Electrification 3 kV DC, overhead line
Operating speed Lua error in Module:Convert at line 1851: attempt to index local 'en_value' (a nil value).
Route map
250px
File:Milano staz Repubblica scala.jpg
The Metro and Suburban lines signs at Repubblica station.

The Milan Passante railway, (Italian: Passante ferroviario di Milano), is an underground railway which runs through Milan, Italy. "Passante" is the Italian for "passing" and is used to describe a railway built through a major city, connecting suburban lines, modelled on the underground junctions built in West Germany in the 1970s.

The first part of the passante was opened in 1997 and it was completed in 2008.[1] Its main feature is to be open in its extremities, and to be directly interconnected with the railway system of Lombardy. It is only used by suburban trains operated by Trenord.

The passante is connected with subway lines at Porta Garibaldi station (Line 2 and Line 5), Repubblica station (Line 3), Rogoredo (Line 3) and Porta Venezia (Line 1).

The railway runs on the same line of the historic Milanese northern railway, which was removed in 1931 when the Milanese railway system was redesigned along with the opening of the grand new Central Station.

History

The idea of a suburban railway network for the city of Milan can be traced back to the 1960s, when the increasing population of the city and the surrounding boroughs made clear the need for a faster and more efficient way to complete medium to longer distance journeys. Designs for an underground railway passing through the city centre were completed at the end of the 1970s, and construction began in 1982, with the work expected to be completed in less than 10 years.[2]

Actual work proceeded very slowly, taking 15 years just to open the first part of the track from Bovisa to Porta Venezia.[3][2] From 1997 only a shuttle service was operated on the partially completed track. Two years later the Certosa branch was opened and was completed in 2002 with the opening of the new Villapizzone station. In the same year the Passante was expanded on the south-east to Dateo.[1]

In 2004, in conjunction with the opening of Porta Vittoria station, the new suburban service was activated.[4] The cost at that time was already €915 million after 22 years of construction work.[5]

The railway was completed in 2008 with the opening of the last station, Rogoredo.[4]

References and Notes

  1. 1.0 1.1 Storia del Passante - sottomilano.it
  2. 2.0 2.1 Lua error in package.lua at line 80: module 'strict' not found.
  3. Il Passante è una realtà. In: ″I Treni″ Nr. 190 (February 1998), p. 5.
  4. 4.0 4.1 Il Passante - msrmilano.com
  5. Lua error in package.lua at line 80: module 'strict' not found.

See also

Bibliography

  • Fernando Malusardi: Il passante ferroviario di Milano. In: ″Ingegneria Ferroviaria″, July 1982, p. 478–484.

External links