North Bridge, Edinburgh

From Infogalactic: the planetary knowledge core
Jump to: navigation, search
File:Waverley Station and North Bridge - Edinburgh - 27 October 2008.jpg
North Bridge, above Waverley Station, from the East

North Bridge is a road bridge and street in Edinburgh linking the High Street with Princes Street, and the New Town with the Old. The current bridge was built between 1894–97. A previous North Bridge, built from 1763–72, stood until 1896.

Current North Bridge

The current North Bridge is 525 feet (160 m) long and has three spans of arched girders each 175 feet (53 m) feet in length. It is 75 feet (23 m) wide. It was constructed from 1894–1897 by Sir William Arrol & Co.,[1] the company also noted for construction of the Forth Bridge. The design of the ornamentation was by the City architect of the time, Robert Morham.[2]

File:Old North Bridge Plaque.jpg
Old North Bridge plaque on the present bridge

The foundation stone was laid on 25 May 1896 by the then Lord Provost (the Rt. Hon Andrew McDonald, with Masonic ceremonial. A medal[3] was struck commemorating the opening of the bridge on 15 September 1897.[4] The medal shows a view of the bridge with trains underneath and on the obverse a bust of the by then knighted Sir Andrew McDonald, Lord Provost.[5]

K.O.S.B. Memorial by Birnie Rhind, North Bridge

Situated on the bridge is a war memorial, by sculptor William Birnie Rhind which memorialises soldiers of the King's Own Scottish Borderers killed in campaigns between 1878 and 1902.[6]

At the southern end of the bridge (where it meets the Royal Mile and South Bridge, in the Edinburgh's Old Town) are substantial buildings whose main entrances are at carriageway level but which also have entrances in the valley below. Those on the west side are The Scotsman Hotel, former headquarters of The Scotsman newspaper, alongside a block of commercial premises and flats ("Royal Mile Mansions"). That on the east housed Patrick Thomson's department store from 1906 until 1976 when its then owner the House of Fraser rebranded it as Arnotts department store. The store closed in 1981 and the building was redeveloped as a hotel and smaller shops.

At the northern end of the bridge, where it meets Princes Street in the New Town, on the west side is the Balmoral Hotel, originally built as the North British Hotel, the North British Railway's hotel serving Waverley Station, which lies below. On the east side is Waverley Gate, originally the Edinburgh General Post Office, now serving as office space.

First North Bridge

File:Old North Bridge, Edinburgh.jpg
The old North Bridge, from the west, with Calton Hill in the background, in 1829

The first stone of the original bridge was laid on 21 October 1763 by the Lord Provost, George Drummond, a driving force behind the modernisation of Edinburgh. In that year, the North Loch, which separates the New from the Old Town, was drained, and the mud removed. But, though the erection of the bridge was resolved upon at that time, the contract for building the bridge was not signed till the 21 August 1765. The parties to this contract were the town-council of Edinburgh, and William Mylne, architect, brother to Robert Mylne. The sum agreed for was £10,140; the work was to be completed before Martinmas (11 November) 1769, and Mylne was to guarantee the works for a period of ten years.[7]

File:North Bridge and Register House, Edinburgh.jpg
View of the North Bridge and Robert Adam's Register House, c.1800

A difficulty, however, occurred in the course of the work, which had neither been foreseen nor provided against. As the north side of the hill on which the old part of the city stands is extremely steep, it had been found convenient, in early times, to throw the earth dug from the foundations of houses down this declivity, towards the North Loch. As a result the whole mass, to a considerable depth, consisted entirely of loose earth. Mylne underestimated the depth of foundations required. This, together with other design faults, led to a collapse of part of the structure on 3 August 1769, killing five people. Rebuilding work cost another £18,000 and the bridge reopened in 1772.[7]

The North Bridge consisted of three central arches, two side arches, with several smaller concealed ones at each end, of the following dimensions: width of the three central arches, 72 feet (22 m) each; breadth or thickness of the piers, 13.5 feet (4.1 m); width of the small arches, 20 feet (6.1 m) each. The total length of the piers and arches was 310 feet (94 m); and the whole length of the bridge, from the High Street to Princes Street was 1,125 feet (343 m). The height of the central arches, from the top of the parapet to the base, was 68 feet (21 m); the breadth of the bridge within the wall over the arches was 40 feet (12 m); and the breadth at each end 50 feet (15 m). In 1817, at the northern end, new buildings were begun on the site of St Anne Street, a steep street running alongside the bridge from Princes Street to Canal Street, which were to be built twelve feet from the bridge parapet with the space arched over and paved thus widening the bridge at this point by twelve feet.[7]

See also

References

  1. Lua error in package.lua at line 80: module 'strict' not found.
  2. Buildings of Scotland: Edinburgh by McWilliam Gifford and Walker
  3. Commemoration Medal details
  4. Edinburgh dates
  5. Hazell's Annual, p. 236
  6. Lua error in package.lua at line 80: module 'strict' not found.
  7. 7.0 7.1 7.2 Picture of Edinburgh By John Stark, 1825, pp.77-79
Attribution

Lua error in package.lua at line 80: module 'strict' not found.