Suez Canal

From Infogalactic: the planetary knowledge core
(Redirected from Suez Canal Zone)
Jump to: navigation, search

Lua error in package.lua at line 80: module 'strict' not found.

Suez Canal
SuezCanal-EO.JPG
The Suez Canal from space, showing
the Great Bitter Lake at centre (before the 2015 expansion)
Specifications
Length 193.3 km (120.1 miles)
Maximum boat beam Lua error in Module:Convert at line 1851: attempt to index local 'en_value' (a nil value).
Locks None
Status Obstructed (See: 2021 Suez Canal obstruction)
Geography
Start point Port Said
End point Port Tewfik, Suez
The southern terminus of the Suez Canal at Suez on the Gulf of Suez, at the northern end of the Red Sea
File:Aerial view of city of Suez and Suez Canal.jpg
Aerial view of the Suez Canal at Suez

The Suez Canal (Arabic: قناة السويس‎‎ qanāt as-suwēs) is an artificial sea-level waterway in Egypt, connecting the Mediterranean Sea to the Red Sea through the Isthmus of Suez and dividing Africa and Asia. Constructed between 1859 and 1869 by the Suez Canal Company formed by Ferdinand de Lesseps in 1858, it officially opened on 17 November 1869. The canal offers watercraft a more direct route between the North Atlantic and northern Indian oceans via the Mediterranean and Red seas, thus avoiding the South Atlantic and southern Indian oceans and reducing the journey distance from the Arabian Sea to Asia by approximately 8,900 kilometres (5,500 mi), or 8-10 days.[1] It extends from the northern terminus of Port Said to the southern terminus of Port Tewfik at the city of Suez. Its length is 193.30 km (120.11 mi) including its northern and southern access-channels. In 2020, over 18,500 vessels traversed the canal (an average of 51.5 per day).[2][needs update]

The original canal featured a single-lane waterway with passing locations in the Ballah Bypass and the Great Bitter Lake.[3] It contained, according to Alois Negrelli's plans, no lock systems, with seawater flowing freely through it. In general, the water in the canal north of the Bitter Lakes flows north in winter and south in summer. South of the lakes, the current changes with the tide at Suez.[4]

While the canal as such was the property of the Egyptian government, European shareholders, mostly French and British, owned the concessionary company which operated it until July 1956, when President Gamal Abdel Nasser nationalized it—an event which led to the Suez Crisis of October–November 1956.[5] The canal is operated and maintained by the state-owned Suez Canal Authority[6] (SCA) of Egypt. Under the Convention of Constantinople, it may be used "in time of war as in time of peace, by every vessel of commerce or of war, without distinction of flag."[7] Nevertheless, the canal has played an important military strategic role as a naval short-cut and choke-point. Navies with coastlines and bases on both the Mediterranean and Red Seas (Egypt and Israel) have a particular interest in the Suez Canal. After Egypt closed the Suez canal at the beginning of the Six Day War on June 5, 1967, the canal remained closed for precisely eight years, reopening on June 5, 1975.[8]

In August 2014, the Egyptian government launched construction to expand and widen the Ballah Bypass for 35 km (22 mi) to speed up the canal's transit-time. The expansion intended to nearly double the capacity of the Suez Canal, from 49 to 97 ships per day.[9] At a cost of 59.4 billion Egyptian pounds (US$Expression error: Unrecognized punctuation character "[".bn), this project was funded with interest-bearing investment certificates issued exclusively to Egyptian entities and individuals. The "New Suez Canal", as the expansion was dubbed, was opened in a ceremony on 6 August 2015.[10]

On 24 February 2016, the Suez Canal Authority officially opened the new side channel. This side channel, located at the northern side of the east extension of the Suez Canal, serves the East Terminal for berthing and unberthing vessels from the terminal. As the East Container Terminal is located on the Canal itself, before the construction of the new side channel it was not possible to berth or unberth vessels at the terminal while a convoy was running.[11]

Precursors

<templatestyles src="Module:Hatnote/styles.css"></templatestyles>

File:Canal of the Pharaohs Map-en.svg
Canal of the Pharaohs, that followed Wadi Tumilat

Ancient west–east canals were built to facilitate travel from the Nile River to the Red Sea.[12][13][14] One smaller canal is believed to have been constructed under the auspices of Senusret II[15] or Ramesses II.[12][13][14] Another canal, probably incorporating a portion of the first,[12][13] was constructed under the reign of Necho II, but the only fully functional canal was engineered and completed by Darius I.[12][13][14]

Second millennium BC

The legendary Sesostris (likely either Pharaoh Senusret II or Senusret III of the Twelfth dynasty of Egypt[15][16]) may have started work on an ancient canal, the Canal of the Pharaohs, joining the Nile with the Red Sea (1897 BCE – 1839 BCE), when an irrigation channel was constructed around 1848 BCE that was navigable during the flood season, leading into a dry river valley east of the Nile River Delta named Wadi Tumilat.[17] (It is said that in ancient times the Red Sea reached northward to the Bitter Lakes[12][13] and Lake Timsah.[18][19])

In his Meteorology, Aristotle wrote:

One of their kings tried to make a canal to it (for it would have been of no little advantage to them for the whole region to have become navigable; Sesostris is said to have been the first of the ancient kings to try), but he found that the sea was higher than the land. So he first, and Darius afterwards, stopped making the canal, lest the sea should mix with the river water and spoil it.[20]

Strabo wrote that Sesostris started to build a canal, and Pliny the Elder wrote:

165. Next comes the Tyro tribe and, the harbour of the Daneoi, from which Sesostris, king of Egypt, intended to carry a ship-canal to where the Nile flows into what is known as the Delta; this is a distance of over 60 miles. Later the Persian king Darius had the same idea, and yet again Ptolemy II, who made a trench 100 feet wide, 30 feet deep and about 35 miles long, as far as the Bitter Lakes.[21]

In the 20th century the northward extension of the later Darius I canal was discovered, extending from Lake Timsah to the Ballah Lakes.[22] This was dated to the Middle Kingdom of Egypt by extrapolating the dates of ancient sites along its course.[22]

The reliefs of the Punt expedition under Hatshepsut, 1470 BCE, depict seagoing vessels carrying the expeditionary force returning from Punt. This suggests that a navigable link existed between the Red Sea and the Nile.[23] Recent excavations in Wadi Gawasis may indicate that Egypt's maritime trade started from the Red Sea and did not require a canal.[citation needed] Evidence seems to indicate its existence by the 13th century BCE during the time of Ramesses II.[12][24][25][26]

Canals dug by Necho, Darius I and Ptolemy

Remnants of an ancient west–east canal through the ancient Egyptian cities of Bubastis, Pi-Ramesses, and Pithom were discovered by Napoleon Bonaparte and his engineers and cartographers in 1799.[13][27][28][29][30]

According to the Histories of the Greek historian Herodotus,[31] about 600 BCE, Necho II undertook to dig a west–east canal through the Wadi Tumilat between Bubastis and Heroopolis,[13] and perhaps continued it to the Heroopolite Gulf and the Red Sea.[12] Regardless, Necho is reported as having never completed his project.[12][13]

Herodotus was told that 120,000 men perished in this undertaking, but this figure is doubtless exaggerated.[32] According to Pliny the Elder, Necho's extension to the canal was about 57 English miles,[13] equal to the total distance between Bubastis and the Great Bitter Lake, allowing for winding through valleys.[13] The length that Herodotus tells, of over 1000 stadia (i.e., over 114 miles (183 km)), must be understood to include the entire distance between the Nile and the Red Sea[13] at that time.

With Necho's death, work was discontinued. Herodotus tells that the reason the project was abandoned was because of a warning received from an oracle that others would benefit from its successful completion.[13][33] Necho's war with Nebuchadnezzar II most probably prevented the canal's continuation.

Necho's project was completed by Darius I of Persia, who ruled over Ancient Egypt after it had been conquered by his predecessor Cambyses II.[34] It may be that by Darius's time a natural[13] waterway passage which had existed[12] between the Heroopolite Gulf and the Red Sea[35] in the vicinity of the Egyptian town of Shaluf[13] (alt. Chalouf[36] or Shaloof[19]), located just south of the Great Bitter Lake,[13][19] had become so blocked[12] with silt[13] that Darius needed to clear it out so as to allow navigation[13] once again. According to Herodotus, Darius's canal was wide enough that two triremes could pass each other with oars extended, and required four days to traverse. Darius commemorated his achievement with a number of granite stelae that he set up on the Nile bank, including one near Kabret, and a further one a few miles north of Suez. Darius the Great's Suez Inscriptions read:[37]

<templatestyles src="Template:Blockquote/styles.css" />

Saith King Darius: I am a Persian. Setting out from Persia, I conquered Egypt. I ordered this canal dug from the river called the Nile that flows in Egypt, to the sea that begins in Persia. When the canal had been dug as I ordered, ships went from Egypt through this canal to Persia, even as I intended.

— Darius Inscription

The canal left the Nile at Bubastis. An inscription[38] on a pillar at Pithom records that in 270 or 269 BCE, it was again reopened, by Ptolemy II Philadelphus. In Arsinoe,[13] Ptolemy constructed a navigable lock, with sluices, at the Heroopolite Gulf of the Red Sea,[35] which allowed the passage of vessels but prevented salt water from the Red Sea from mingling with the fresh water in the canal.[39]

In the second half of the 19th century, French cartographers discovered the remnants of an ancient north–south canal past the east side of Lake Timsah and ending near the north end of the Great Bitter Lake.[40] This proved to be the canal made by Darius I, as his stele commemorating its construction was found at the site. (This ancient, second canal may have followed a course along the shoreline of the Red Sea when it once extended north to Lake Timsah.[19][40])

Receding Red Sea and the dwindling Nile

The Red Sea is believed by some historians to have gradually receded over the centuries, its coastline slowly moving southward away from Lake Timsah[18][19] and the Great Bitter Lake.[12][13] Coupled with persistent accumulations of Nile silt, maintenance and repair of Ptolemy's canal became increasingly cumbersome over each passing century.

Two hundred years after the construction of Ptolemy's canal, Cleopatra seems to have had no west–east waterway passage,[12][13] because the Pelusiac branch of the Nile, which fed Ptolemy's west–east canal, had by that time dwindled, being choked with silt.[12][13]

Old Cairo to the Red Sea

By the 8th century, a navigable canal existed between Old Cairo and the Red Sea,[12][13] but accounts vary as to who ordered its construction – either Trajan or 'Amr ibn al-'As, or Omar the Great.[12][13] This canal was reportedly linked to the River Nile at Old Cairo[13] and ended near modern Suez.[12][41] A geography treatise De Mensura Orbis Terrae written by the Irish monk Dicuil (born late 8th century) reports a conversation with another monk, Fidelis, who had sailed on the canal from the Nile to the Red Sea during a pilgrimage to the Holy Land in the first half of the 8th century[42]

The Abbasid Caliph al-Mansur is said to have ordered this canal closed in 767 to prevent supplies from reaching Arabian detractors.[12][13]

Repair by al-Ḥākim

Al-Hakim bi-Amr Allah is claimed to have repaired the Cairo to Red Sea passageway, but only briefly, circa 1000 CE, as it soon "became choked with sand".[13] However, parts of this canal still continued to fill in during the Nile's annual inundations.[12][13]

Conception by Venice

The successful 1488 navigation of southern Africa by Bartolomeu Dias opened a direct maritime trading route to India and the spice islands, and forever changed the balance of Mediterranean trade. One of the most prominent losers in the new order, as former middlemen, was the former spice trading center of Venice.

<templatestyles src="Template:Blockquote/styles.css" />

Venetian leaders, driven to desperation, contemplated digging a waterway between the Red Sea and the Nile—anticipating the Suez Canal by almost 400 years—to bring the luxury trade flooding to their doors again. But this remained a dream.

— Colin Thubron, Seafarers: The Venetians (1980), p. 102

Despite entering negotiations with Egypt's ruling Mamelukes, the Venetian plan to build the canal was quickly put to rest by the Ottoman conquest of Egypt in 1517, led by Sultan Selim I.[43]

Ottoman attempts

During the 16th century, the Ottoman Grand Vizier Sokollu Pasha attempted to construct a canal connecting the Red Sea and the Mediterranean. This was motivated by a desire to connect Constantinople to the pilgrimage and trade routes of the Indian Ocean, as well as by strategic concerns—as the European presence in the Indian Ocean was growing, Ottoman mercantile and strategic interests were increasingly challenged, and the Sublime Porte was increasingly pressed to assert its position. A navigable canal would allow the Ottoman Navy to connect its Red Sea, Black Sea, and Mediterranean fleets. However, this project was deemed too expensive, and was never completed.[44][45]

Napoleon's discovery of an ancient canal

During the French campaign in Egypt and Syria in late 1798, Napoleon expressed interest in finding the remnants of an ancient waterway passage. This culminated in a cadre of archaeologists, scientists, cartographers and engineers scouring northern Egypt.[46][47] Their findings, recorded in the Description de l'Égypte, include detailed maps that depict the discovery of an ancient canal extending northward from the Red Sea and then westward toward the Nile.[46][48]

Later, Napoleon, who would become the French Emperor in 1804, contemplated the construction of a north–south canal to connect the Mediterranean with the Red Sea. But the plan was abandoned because it incorrectly concluded that the waterway would require locks to operate, the construction of which would be costly and time-consuming. The belief in the need for locks was based on the erroneous assumption that the Red Sea was 8.5 m (28 ft) higher than the Mediterranean, which estimate was the result of using fragmentary survey measurements taken in wartime during Napoleon's Egyptian Expedition.[49]

However, as late as 1861, the unnavigable ancient route discovered by Napoleon from Bubastis to the Red Sea still channeled water in spots as far east as Kassassin.[13]

History

Interim period

Bathymetric chart, northern Gulf of Suez, route to Cairo, 1856

Despite the construction challenges that could have been the result of the alleged difference in sea levels, the idea of finding a shorter route to the east remained alive. In 1830, General Francis Chesney submitted a report to the British government that stated that there was no difference in elevation and that the Suez Canal was feasible, but his report received no further attention. Lieutenant Waghorn established his "Overland Route", which transported post and passengers to India via Egypt.[50][51]

Linant de Bellefonds, a French explorer of Egypt, became chief engineer of Egypt's Public Works. In addition to his normal duties, he surveyed the Isthmus of Suez and made plans for the Suez Canal. French Saint-Simonianists showed an interest in the canal and in 1833, Barthélemy Prosper Enfantin tried to draw Muhammad Ali's attention to the canal but was unsuccessful. Alois Negrelli, the Italian-Austrian railroad pioneer, became interested in the idea in 1836.

In 1846, Prosper Enfantin's Société d'Études du Canal de Suez invited a number of experts, among them Robert Stephenson, Negrelli and Paul-Adrien Bourdaloue to study the feasibility of the Suez Canal (with the assistance of Linant de Bellefonds). Bourdaloue's survey of the isthmus was the first generally accepted evidence that there was no practical difference in altitude between the two seas. Britain, however, feared that a canal open to everyone might interfere with its India trade and therefore preferred a connection by train from Alexandria via Cairo to Suez, which Stephenson eventually built.

Construction by the Suez Canal Company

Suez Canal, 1869

Preparations (1854–1858)

In 1854 and 1856, Ferdinand de Lesseps obtained a concession from Sa'id Pasha, the Khedive of Egypt and Sudan, to create a company to construct a canal open to ships of all nations. The company was to operate the canal for 99 years from its opening. De Lesseps had used his friendly relationship with Sa'id, which he had developed while he was a French diplomat in the 1830s. As stipulated in the concessions, de Lesseps convened the International Commission for the piercing of the isthmus of Suez (Commission Internationale pour le percement de l'isthme des Suez) consisting of 13 experts from seven countries, among them John Robinson McClean, later President of the Institution of Civil Engineers in London, and again Negrelli, to examine the plans developed by Linant de Bellefonds, and to advise on the feasibility of and the best route for the canal. After surveys and analyses in Egypt and discussions in Paris on various aspects of the canal, where many of Negrelli's ideas prevailed, the commission produced a unanimous report in December 1856 containing a detailed description of the canal complete with plans and profiles.[52] The Suez Canal Company (Compagnie universelle du canal maritime de Suez) came into being on 15 December 1858.

The British government had opposed the project from the outset to its completion. The British, who controlled both the Cape route and the Overland route to India and the Far East, favored the status quo, given that a canal might disrupt their commercial and maritime supremacy. Lord Palmerston, the project's most unwavering foe, confessed in the mid-1850s the real motive behind his opposition: that Britain's commercial and maritime relations would be overthrown by the opening of a new route, open to all nations, and thus deprive his country of its present exclusive advantages.[53] As one of the diplomatic moves against the project when it nevertheless went ahead, it disapproved of the use of "slave labour" for construction of the canal. Involuntary labour on the project ceased, and the viceroy condemned the corvée, halting the project.[54]

Initially international opinion was skeptical and Suez Canal Company shares did not sell well overseas. Britain, Austria, and Russia did not buy a significant number of shares. However, with assistance from the Cattaui banking family, and their relationship with James de Rothschild of the French House of Rothschild bonds and shares were successfully promoted in France and other parts of Europe.[55] All French shares were quickly sold in France. A contemporary British skeptic claimed "One thing is sure... our local merchant community doesn't pay practical attention at all to this grand work, and it is legitimate to doubt that the canal's receipts... could ever be sufficient to recover its maintenance fee. It will never become a large ship's accessible way in any case."[56]

Construction (1859–1869)

Work started on the shore of the future Port Said on 25 April 1859.

1881 drawing of the Suez Canal

The excavation took some 10 years, with forced labour (corvée) being employed until 1864 to dig-out the canal.[57] Some sources estimate that over 30,000 people were working on the canal at any given period, that more than 1.5 million people from various countries were employed, and that thousands of labourers died, many of them from cholera and similar epidemics.[49][58]

Estimates of the number of deaths varies widely with Gamal Abdel Nasser famously citing 120,000 deaths upon nationalization of the canal in a July 26, 1956 speech and the companies chief medical officer reporting no higher than 2.49 deaths per thousand in 1866(Wilson, pg 31). Doubling these estimates with a generous assumption of 50,000 working staff per year over 11 years would put a conservative estimate at fewer than 3,000 deaths. More closely relying on the limited reported data of the time, the number would be fewer than 1,000.

Inauguration (17 November 1869)

Suez Canal, Egypt. Early 1900s. Goodyear Archival Collection. Brooklyn Museum

The canal opened under French control in November 1869. The opening ceremonies began at Port Said on the evening of 15 November, with illuminations, fireworks, and a banquet on the yacht of the Khedive Isma'il Pasha of Egypt and Sudan. The royal guests arrived the following morning: the Emperor Franz Joseph I, the French Empress Eugenie in the Imperial yacht L'Aigle, the Crown Prince of Prussia, and Prince Louis of Hesse.[59] Other international guests included the American natural historian H. W. Harkness.[60] In the afternoon there were blessings of the canal with both Muslim and Christian ceremonies, a temporary mosque and church having been built side by side on the beach. In the evening there were more illuminations and fireworks.[59]

On the morning of 17 November, a procession of ships entered the canal, headed by the L'Aigle. Among the ships following was HMS Newport, captained by George Nares, which would survey the canal on behalf of the Admiralty a few months later.[61] The Newport was involved in an incident that demonstrated some of the problems with the canal. There were suggestions that the depth of parts of the canal at the time of the inauguration were not as great as promised, and that the deepest part of the channel was not always clear, leading to a risk of grounding.[59][62][63] The first day of the passage ended at Lake Timsah, 76 kilometres (41 nmi) south of Port Said. The French ship Péluse anchored close to the entrance, then swung around and grounded, the ship and its hawser blocking the way into the lake. The following boats had to anchor in the canal itself until the Péluse was hauled clear the next morning, making it difficult for them to join that night's celebration in Ismailia. Except for the Newport: Nares sent out a boat to carry out soundings, and was able to manoeuver around the Péluse to enter the lake and anchor there for the night.[64][65]

Ismailia was the scene of more celebrations the following day, including a military "march past", illuminations and fireworks, and a ball at the Governor's Palace. The convoy set off again on the morning of 19 November, for the remainder of the trip to Suez.[59] After Suez, many of the participants headed for Cairo, and then to the Pyramids, where a new road had been built for the occasion.[49]

An Anchor Line ship, the S.S. Dido, became the first to pass through the Canal from South to North.[66][67]

Initial difficulties (1869–1871)

Although numerous technical, political, and financial problems had been overcome, the final cost was more than double the original estimate.

The Khedive, in particular, was able to overcome initial reservations held by both British and French creditors by enlisting the help of the Sursock family, whose deep connections proved invaluable in securing much international support for the project.[68][69]

After the opening, the Suez Canal Company was in financial difficulties. The remaining works were completed only in 1871, and traffic was below expectations in the first two years. De Lesseps therefore tried to increase revenues by interpreting the kind of net ton referred to in the second concession (tonneau de capacité) as meaning a ship's cargo capacity and not only the theoretical net tonnage of the "Moorsom System" introduced in Britain by the Merchant Shipping Act in 1854. The ensuing commercial and diplomatic activities resulted in the International Commission of Constantinople establishing a specific kind of net tonnage and settling the question of tariffs in its protocol of 18 December 1873.[70] This was the origin of the Suez Canal Net Tonnage and the Suez Canal Special Tonnage Certificate, both of which are still in use today.

The years after opening

Suez Canal, c. 1914
File:A Ship in the Suez Canal.tif
A ship sailing down the Suez Canal in 1955

The canal had an immediate and dramatic effect on world trade. Combined with the American transcontinental railroad completed six months earlier, it allowed the world to be circled in record time. It played an important role in increasing European colonization of Africa. The construction of the canal was one of the reasons for the Panic of 1873 in Great Britain, because goods from the Far East were carried in sailing vessels around the Cape of Good Hope and were stored in British warehouses. An inability to pay his bank debts led Said Pasha's successor, Isma'il Pasha, in 1875 to sell his 44% share in the canal for £4,000,000 ($19.2 million), equivalent to £432 million to £456 million ($540 million to $570 million) in 2019, to the government of the United Kingdom.[71] French shareholders still held the majority.[72] Local unrest caused the British to invade in 1882 and take full control, although nominally Egypt remained part of the Ottoman Empire. The British representative from 1883 to 1907 was Evelyn Baring, 1st Earl of Cromer, who reorganized and modernized the government and suppressed rebellions and corruption, thereby facilitating increased traffic on the canal.[73]

The European Mediterranean countries in particular benefited economically from the Suez Canal, as they now had much faster connections to Asia and East Africa than the North and West European maritime trading nations such as Great Britain, the Netherlands or Germany. The biggest beneficiary in the Mediterranean was Austria-Hungary, which had participated in the planning and construction of the canal. The largest Austrian maritime trading company, Österreichischer Lloyd, experienced rapid expansion after the canal was completed, as did the port city of Trieste, then an Austrian possession. The company was a partner in the Compagnie Universelle du Canal de Suez, whose vice-president was the Lloyd co-founder Pasquale Revoltella.[74][75][76][77][78]

The Convention of Constantinople in 1888 declared the canal a neutral zone under the protection of the British, who had occupied Egypt and Sudan at the request of Khedive Tewfiq to suppress the Urabi Revolt against his rule. The revolt went on from 1879 to 1882. The British defended the strategically important passage against a major Ottoman attack in 1915, during the First World War.[79] Under the Anglo-Egyptian Treaty of 1936, the UK retained control over the canal. The canal was again strategically important in the 1939–1945 Second World War, and Italo-German attempts to capture it were repulsed during the North Africa Campaign, during which the canal was closed to Axis shipping. In 1951 Egypt repudiated the treaty and in October 1954 the UK agreed to remove its troops. Withdrawal was completed on 18 July 1956.

Suez Crisis

<templatestyles src="Module:Hatnote/styles.css"></templatestyles>

Smoke rises from oil tanks beside the Suez Canal hit during the initial Anglo-French assault on Port Said, 5 November 1956

Because of Egyptian overtures towards the Soviet Union, the United Kingdom and the United States withdrew their pledge to support the construction of the Aswan Dam. Egyptian President Gamal Abdel Nasser responded by nationalizing the canal on 26 July 1956[80] and transferring it to the Suez Canal Authority, intending to finance the dam project using revenue from the canal. On the same day that the canal was nationalized Nasser also closed the Straits of Tiran to all Israeli ships.[81] This led to the Suez Crisis in which the UK, France, and Israel invaded Egypt. According to the pre-agreed war plans under the Protocol of Sèvres, Israel invaded the Sinai Peninsula on 29 October, forcing Egypt to engage them militarily, and allowing the Anglo-French partnership to declare the resultant fighting a threat to stability in the Middle East and enter the war – officially to separate the two forces but in reality to regain the Canal and bring down the Nasser government.[82][83][84]

To save the British from what he thought was a disastrous action and to stop the war from a possible escalation, Canadian Secretary of State for External Affairs Lester B. Pearson proposed the creation of the first United Nations peacekeeping force to ensure access to the canal for all and an Israeli withdrawal from the Sinai Peninsula. On 4 November 1956, a majority at the United Nations voted for Pearson's peacekeeping resolution, which mandated the UN peacekeepers to stay in Sinai unless both Egypt and Israel agreed to their withdrawal. The United States backed this proposal by putting pressure on the British government through the selling of sterling, which would cause it to depreciate. Britain then called a ceasefire, and later agreed to withdraw its troops by the end of the year. Pearson was later awarded the Nobel Peace Prize. As a result of damage and ships sunk under orders from Nasser the canal was closed until April 1957, when it was cleared with UN assistance.[85] A UN force (UNEF) was established to maintain the free navigability of the canal, and peace in the Sinai Peninsula.

Arab–Israeli wars of 1967 and 1973

Egyptian vehicles crossing the Suez Canal on 7 October 1973, during the Yom Kippur War
Israeli tank crossing the Suez Canal, 1973

In May 1967, Nasser ordered the UN peacekeeping forces out of Sinai, including the Suez Canal area. Israel objected to the closing of the Straits of Tiran to Israeli shipping. The canal had been closed to Israeli shipping since 1949, except for a short period in 1951–1952.

After the 1967 Six-Day War, Israeli forces occupied the Sinai peninsula, including the entire east bank of the Suez Canal. Unwilling to allow the Israelis to use the canal, Egypt immediately imposed a blockade which closed the canal to all shipping. Fifteen cargo ships, known as the "Yellow Fleet", were trapped in the canal, and would remain there until 1975.

In 1973, during the Yom Kippur War, the canal was the scene of a major crossing by the Egyptian army into Israeli-occupied Sinai and a counter-crossing by the Israeli army to Egypt. Much wreckage from this conflict remains visible along the canal's edges.[86]

Mine clearing operations (1974–75)

After the Yom Kippur War, the United States initiated Operation Nimbus Moon. The amphibious assault ship USS Inchon (LPH-12) was sent to the Canal, carrying 12 RH-53D minesweeping helicopters of Helicopter Mine Countermeasures Squadron 12. These partly cleared the canal between May and December 1974. She was relieved by the LST USS Barnstable County (LST1197). The British Royal Navy initiated Operation Rheostat and Task Group 65.2 provided for Operation Rheostat One[87] (six months in 1974), the minehunters HMS Maxton, HMS Bossington, and HMS Wilton, the Fleet Clearance Diving Team (FCDT)[88] and HMS Abdiel, a practice minelayer/MCMV support ship; and for Operation Rheostat Two[89] (six months in 1975) the minehunters HMS Hubberston and HMS Sheraton, and HMS Abdiel. When the Canal Clearance Operations were completed, the canal and its lakes were considered 99% clear of mines. The canal was then reopened by Egyptian President Anwar Sadat aboard an Egyptian destroyer, which led the first convoy northbound to Port Said in 1975.[90] At his side stood the Iranian Crown Prince Reza Pahlavi, delegated to represent his father, Mohammed Reza Pahlavi, the Shah of Iran. The cruiser USS Little Rock was the only American naval ship in the convoy.[91]

UN presence

The UNEF mandate expired in 1979. Despite the efforts of the United States, Israel, Egypt, and others to obtain an extension of the UN role in observing the peace between Israel and Egypt, as called for under the Egypt–Israel Peace Treaty of 1979, the mandate could not be extended because of the veto by the Soviet Union in the UN Security Council, at the request of Syria. Accordingly, negotiations for a new observer force in the Sinai produced the Multinational Force and Observers (MFO), stationed in Sinai in 1981 in coordination with a phased Israeli withdrawal. It is there under agreements between the United States, Israel, Egypt, and other nations.[92]

Bypass expansion

<templatestyles src="Module:Hatnote/styles.css"></templatestyles>

In the summer of 2014, months after taking office as President of Egypt, Abdel Fattah el-Sisi ordered the expansion of the Ballah Bypass from 61 metres (200 ft) wide to 312 metres (1,024 ft) wide for 35 kilometres (22 mi). The project was called the New Suez Canal, as it allows ships to transit the canal in both directions simultaneously.[93][94] The project cost more than E£59.4 billion (US$Expression error: Unrecognized punctuation character "[".bn) and was completed within one year. Sisi declared the expanded channel open for business in a ceremony on 6 August 2015.[95]

2021 obstruction by Ever Given

<templatestyles src="Module:Hatnote/styles.css"></templatestyles>

On 23 March 2021, at around 05:40 UTC (07:40 local time),[96] the Suez Canal was blocked in both directions by the ultra-large Golden-class container ship Ever Given.[97] The ship, operated by Evergreen Marine, was en route from China to the Netherlands when she ran aground after a strong gust of wind blew her off course.[96] Upon running aground, Ever Given turned sideways, completely blocking the canal.[98][96] Although part of the length of the canal is paralleled by an older narrower channel which can still be used to bypass obstructions, this particular incident happened in a section of the canal with only one channel.[99]

At the dawn of the incident, many economists and trade experts have commented on the effects of the obstruction if not resolved quickly, citing how important the Suez is to global trade, and the incident is likely to drastically affect the global economy because of the trapped goods scheduled to go through the canal following the incident. Among the products, oil shipments are the most affected in the immediate aftermath, due to a significant amount of them remaining blocked with no way to reach their destination.[100][101] Referring to the European and American market, a few maritime experts have disputed the prediction of a drastic effect on trade, saying this "really isn’t a substantial transit route for crude" according to Marshall Steeves, energy markets analyst at IHS Markit, and "there are existing stocks" according to Camille Egloff of Boston Consulting Group and alternative sources of supply, noting that traffic has only slowed down and that this might only impact sectors with existing shortages such as the semiconductor industry.[102][103] International Chamber of Shipping (ICS) estimates that up to $3 billion worth of cargo passes through the Suez Canal every day.[104]

It is said the blockage is going to have an impact on cargo schedules around the world. Shipping companies are also considering whether to divert their ships along the much longer route around Cape Agulhas. The first container ship to do so is Ever Given's sister ship, Ever Greet.[105]

Timeline

For more details see The Suez Canal. Its History and Diplomatic Importance by Charles W. Hallberg (1931).[citation needed]

  • 1799: Napoleon Bonaparte conquers Egypt and orders a feasibility analysis. This incorrectly reports a supposed 10-metre (33 ft) difference in sea levels and a high cost, so the project is put on hold.[106]
  • 1847: A second survey including Robert Stephenson finds the first analysis incorrect. A direct link between the Mediterranean Sea and the Red Sea is possible and not as expensive as previously estimated.[106]
  • 30 November 1854: The former French consul in Cairo, Ferdinand Marie de Lesseps, obtains the first license for construction[106] and subsequent operation from the Viceroy for a period of 99 years.[citation needed]
  • 6 January 1856: de Lesseps is provided with a second, more detailed license.[citation needed]
  • 15 December 1858: de Lesseps establishes the "Compagnie Universelle du Canal Maritime de Suez", with Said Pasha acquiring 22% of the Suez Canal Company; the majority is controlled by French private holders.
  • 25 April 1859: construction officially starts.[107]
  • 15 to 17 November 1869: An opening ceremony and celebrations are for Empress Eugénie of France to open the canal.[106][108]
  • 17 November 1869: The canal is opened, operated by the Suez Canal Company, the concessionary company that built the canal.
  • 18 December 1873: The International Commission of Constantinople establishes the Suez Canal Net Ton and the Suez Canal Special Tonnage Certificate (as known today)
  • 25 November 1875: Britain becomes a minority share holder in the company, acquiring 44%, with the remainder being controlled by French business syndicates.
  • 20 May 1882: Britain invades Egypt, with French assistance, and begins its occupation of Egypt.
  • 25 August 1882: Britain occupy Egypt. The canal remains under the control of the privately-owned Suez Canal Company.
  • 2 March 1888: The Convention of Constantinople renews the guaranteed right of passage of all ships through the canal during war and peace; these rights were already part of the licenses awarded to de Lesseps, but are recognised as international law.
  • 14 November 1936: Following a new treaty, Britain theoretically pulls out of Egypt, but establishes the 'Suez Canal Zone' under its control.
  • 13 June 1956: Suez Canal Zone is restored to Egyptian sovereignty, following British withdrawal and years of negotiations.
  • 26 July 1956: Egypt nationalizes the company; its Egyptian assets, rights and obligations are transferred to the Suez Canal Authority, which compensates the previous owners at the established pre-nationalization price. Egypt closes the canal to Israeli shipping as part of a broader blockade involving the Straits of Tiran and the Gulf of Aqaba.
  • 31 October 1956 to 24 April 1957: the canal is blocked to shipping following the Suez Crisis, a conflict that leads to an Israeli, French, and British occupation of the canal zone.
  • 22 December 1956: The canal zone is restored to Egyptian control, following French and British withdrawal, and the landing of UNEF troops.
  • 5 June 1967 to 10 June 1975: The canal is blocked by Egypt, following the war with Israel; it becomes the front line during the ensuing War of Attrition and the 1973 war, remaining closed to international shipping, until general agreement was near.
  • 2004: The canal is closed for three days when the oil tanker Tropic Brilliance gets stuck.[109]
  • 1 January 2008: New rules of navigation passed by the Suez Canal Authority come into force.
  • 6 August 2015: The new canal extensions are opened.
  • October 2017: OOCL Japan runs aground causing an obstruction which blocked the canal for a few hours.[110][109]
  • 23 March 2021: Ever Given, a Panama-flagged container ship, runs aground and becomes stuck across the southern section of the canal. The blockage prevents movement through the canal, causes nearly $10 billion worth of disruptions in shipping traffic each day, and creates a large traffic jam of ships on both sides.[111][112][113]

Layout and operation

Suez Canal
km
Mediterranean Sea
Approaches(Southward convoy waiting area)
0.0 Port Said
lighthouse, fishing harbour, cruise terminal
Port Said (city), former headquarters
Port Said harbour, Port Fuad (city),
East Port, SCCT container terminal
E-class turning dock
Shohada 25 January Bridge
51.5
Ballah (former by-pass)
59.9
Eastern lane: second shipping lane, New Suez Canal[114]
El Ferdan Railway Bridge
76.5 Ismaïlia, SCA headquarters
Lake Timsah
95.0 Deversoir
Great Bitter Lake
Small Bitter Lake
Ahmed Hamdi Tunnel
overhead powerline
162 Suez, Suez Port
Petroleum Dock, Port Tewfik
Gulf of Suez(Northward convoy waiting area)
Red Sea


Legend:
Navigable canal
Anchorage
Dock, industrial or logistical area
Village or town, feature
Railroad (defunct) with swing bridge

When built, the canal was 164 km (102 mi) long and 8 m (26 ft) deep. After several enlargements, it is 193.30 km (120.11 mi) long, 24 m (79 ft) deep and 205 metres (673 ft) wide.[115] It consists of the northern access channel of 22 km (14 mi), the canal itself of 162.25 km (100.82 mi) and the southern access channel of 9 km (5.6 mi).[116]

The so-called New Suez Canal, functional since 6 August 2015,[117] currently has a new parallel canal in the middle part, with its length over 35 km (22 mi). The current parameters of the Suez Canal, including both individual canals of the parallel section are: depth 23 to 24 metres (75 to 79 ft) and width at least 205 to 225 metres (673 to 738 ft) (that width measured at 11 metres (36 ft) of depth).[118]

Capacity

<templatestyles src="Module:Hatnote/styles.css"></templatestyles>

The canal allows passage of ships up to 20 m (66 ft) draft or 240,000 deadweight tons and up to a height of 68 m (223 ft) above water level and a maximum beam of 77.5 m (254 ft) under certain conditions.[119][115] The canal can handle more traffic and larger ships than the Panama Canal, as Suezmax dimensions are greater than both Panamax and New Panamax. Some supertankers are too large to traverse the canal. Others can offload part of their cargo onto a canal-owned ship to reduce their draft, transit, and reload at the other end of the canal.

Navigation

The canal has no locks because of the flat terrain, and the minor sea level difference between each end is inconsequential for shipping. As the canal has no sea surge gates, the ports at the ends would be subject to the sudden impact of tsunamis from the Mediterranean Sea and Red Sea, according to a 2012 article in the Journal of Coastal Research.[120]

There is one shipping lane with passing areas in Ballah-Bypass near El Qantara and in the Great Bitter Lake. On a typical day, three convoys transit the canal, two southbound and one northbound. The passage takes between 11 and 16 hours at a speed of around 8 knots (15 km/h; 9 mph). The low speed helps prevent erosion of the banks by ships' wakes.

By 1955, about two-thirds of Europe's oil passed through the canal. Around 8% of world sea trade is carried via the canal. In 2008, 21,415 vessels passed through the canal and the receipts totaled $5.381 billion,[119] with an average cost per ship of $251,000.

New Rules of Navigation came into force on 1 January 2008, passed by the board of directors of the Suez Canal Authority (SCA) to organise vessels' transit. The most important amendments include allowing vessels with 62-foot (19 m) draught to pass, increasing the allowed breadth from 32 metres (105 ft) to 40 metres (130 ft) (following improvement operations), and imposing a fine on vessels using pilots from outside the SCA inside the canal boundaries without permission. The amendments allow vessels loaded with dangerous cargo (such as radioactive or flammable materials) to pass if they conform with the latest amendments provided by international conventions.

The SCA has the right to determine the number of tugs required to assist warships traversing the canal, to achieve the highest degree of safety during transit.[121]

Operation

Before August 2015, the canal was too narrow for free two-way traffic, so ships would pass in convoys and use bypasses. The by-passes were 78 km (48 mi) out of 193 km (120 mi) (40%). From north to south, they are Port Said by-pass (entrances) 36.5 km (23 mi), Ballah by-pass & anchorage 9 km (6 mi), Timsah by-pass 5 km (3 mi), and the Deversoir by-pass (northern end of the Great Bitter Lake) 27.5 km (17 mi). The bypasses were completed in 1980.

Typically, it would take a ship 12 to 16 hours to transit the canal. The canal's 24-hour capacity was about 76 standard ships.[122]

In August 2014, Egypt chose a consortium that includes the Egyptian army and global engineering firm Dar Al-Handasah to develop an international industrial and logistics hub in the Suez Canal area,[123] and began the construction of a new canal section from km 60 to km 95 combined with expansion and deep digging of the other 37 km of the canal.[124] This will allow navigation in both directions simultaneously in the 72 km long central section of the canal. These extensions were formally opened on 6 August 2015 by President Al-Sisi.[9][125][126]

Convoy sailing

Since the canal does not cater to unregulated two-way traffic, all ships transit in convoys on regular times, scheduled on a 24-hour basis. Each day, a single northbound convoy starts at 04:00 from Suez. At dual lane sections, the convoy uses the eastern route.[127][128][129] Synchronised with this convoy's passage is the southbound convoy. It starts at 03:30 from Port Said and so passes the Northbound convoy in the two-lane section.[clarification needed]

Canal crossings

The canal in 2015

From north to south, the crossings are:

  • The Suez Canal Bridge (Lua error in package.lua at line 80: module 'strict' not found.), also called the Egyptian-Japanese Friendship Bridge, a high-level road bridge at El Qantara. In Arabic, al qantara means "arch". Opened in 2001, it has a 70-metre (230 ft) clearance over the canal and was built with assistance from the Japanese government and by Kajima.[130]
  • El Ferdan Railway Bridge (Lua error in package.lua at line 80: module 'strict' not found.) 20 km (12 mi) north of Ismailia (Lua error in package.lua at line 80: module 'strict' not found.) was completed in 2001 and is the longest swing-span bridge in the world, with a span of 340 m (1100 ft). The previous bridge was destroyed in 1967 during the Arab-Israeli conflict. The current bridge is no longer functional due to the expansion of the Suez Canal, as the parallel shipping lane completed in 2015 just east of the bridge lacks a structure spanning it.
  • Pipelines taking fresh water under the canal to Sinai, about 57 km (35 mi) north of Suez, at Lua error in package.lua at line 80: module 'strict' not found..
  • Ahmed Hamdi Tunnel (Lua error in package.lua at line 80: module 'strict' not found.) south of the Great Bitter Lake (Lua error in package.lua at line 80: module 'strict' not found.) was built in 1983. Because of leakage problems, a new water-tight tunnel[131] was built inside the old one from 1992 to 1995.
  • The Suez Canal overhead powerline crossing (Lua error in package.lua at line 80: module 'strict' not found.) was built in 1999.

A railway on the west bank runs parallel to the canal for its entire length.

Six new tunnels for cars and trains are also planned across the canal.[132] Currently the Ahmed Hamdi is the only tunnel connecting Suez to the Sinai.

Economic impact

The old port of Trieste, one of the economic hubs in the 19th century.

Economically, after its completion, the Suez Canal benefited primarily the sea trading powers of the Mediterranean countries, which now had much faster connections to the Near and Far East than the North and West European sea trading nations such as Great Britain or Germany.[133][134] The main Habsburg trading port of Trieste with its direct connections to Central Europe experienced a meteoric rise at that time.[135][136]

The time saved in the 19th century for an assumed steamship trip to Bombay from Brindisi and Trieste was 37 days, from Genoa 32, from Marseille 31, from Bordeaux, Liverpool, London, Amsterdam and Hamburg 24 days. At that time, it was also necessary to consider whether the goods to be transported could bear the costly canal tariff. This led to a rapid growth of Mediterranean ports with their land routes to Central and Eastern Europe. According to today's information from the shipping companies, the route from Singapore to Rotterdam through the Suez Canal will be shortened by 6000 kilometers and thus by nine days compared to the route around Africa. As a result, liner services between Asia and Europe save 44 percent CO2 (carbon dioxide) thanks to this shorter route. The Suez Canal has a correspondingly important role in the connection between East Africa and the Mediterranean region.[137][138][139]

In the 20th century, trade through the Suez Canal came to a standstill several times, due to the two world wars and the Suez Canal crisis. Many trade flows were also shifted away from the Mediterranean ports towards Northern European terminals, such as Hamburg and Rotterdam. Only after the end of the Cold War, the growth in European economic integration, the consideration of CO2 emission and the Chinese Silk Road Initiative, are Mediterranean ports such as Piraeus and Trieste again at the focus of growth and investment.[137][140][141][142]

Alternative routes

Cape Agulhas

The main alternative is around Cape Agulhas, the southernmost point of Africa, commonly referred to as the Cape of Good Hope route. This was the only sea route before the canal was constructed, and when the canal was closed. It is still the only route for ships that are too large for the canal. In the early 21st century, the Suez Canal has suffered from diminished traffic due to piracy in Somalia, with many shipping companies choosing to take the long route instead.[143][144] Between 2008 and 2010, it is estimated that the canal lost 10% of traffic due to the threat of piracy, and another 10% due to the financial crisis. An oil tanker going from Saudi Arabia to the United States has 5,000 km (2,700 nmi) longer to go when taking the route south of Africa rather than the canal.[145]

Before the canal's opening in 1869, goods were sometimes offloaded from ships and carried overland between the Mediterranean and the Red Sea.[146]

Northern Sea Route

A graphical comparison between the Northern Sea Route (blue) and an alternative route through Suez Canal (red)

In recent years, the shrinking Arctic sea ice has made the Northern Sea Route feasible for commercial cargo ships between Europe and East Asia during a six-to-eight-week window in the summer months, shortening the voyage by thousands of miles compared to that through the Suez Canal. According to polar climate researchers, as the extent of the Arctic summer ice pack recedes the route will become passable without the help of icebreakers for a greater period each summer.[147][148]

The Bremen-based Beluga Group claimed in 2009 to be the first Western company to attempt using the Northern Sea Route without assistance from icebreakers, cutting 7,400 kilometres (4,000 nmi) off the journey between Ulsan, Korea and Rotterdam, the Netherlands.[149]

Cape Horn

Sail ships going between Europe and Australia did often prefer to go past Cape Horn when going to Europe, due to prevalent wind directions, even if it is slightly longer from Sydney to Europe this way than past Cape Agulhas.

Negev desert railway

In February 2012 Israel announced its intention to construct a railway between the Mediterranean and Eilat through the Negev desert to compete with the canal.[150] By 2019, the project had been indefinitely frozen.[151]

Environmental impact

<templatestyles src="Module:Hatnote/styles.css"></templatestyles>

The opening of the canal created the first salt-water passage between the Mediterranean Sea and the Red Sea. Although the Red Sea is about 1.2 m (4 ft) higher than the eastern Mediterranean,[152] the current between the Mediterranean and the middle of the canal at the Bitter Lakes flows north in winter and south in summer. The current south of the Bitter Lakes is tidal, varying with the tide at Suez.[4] The Bitter Lakes, which were hypersaline natural lakes, blocked the migration of Red Sea species into the Mediterranean for many decades, but as the salinity of the lakes gradually equalised with that of the Red Sea the barrier to migration was removed, and plants and animals from the Red Sea have begun to colonise the eastern Mediterranean.[citation needed]

The Red Sea is generally saltier and more nutrient-poor than the Atlantic, so the Red Sea species have advantages over Atlantic species in the less salty and nutrient-rich eastern Mediterranean. Accordingly, most Red Sea species invade the Mediterranean biota, and only few do the opposite. This migratory phenomenon is called Lessepsian migration (after Ferdinand de Lesseps) or "Erythrean invasion". Also impacting the eastern Mediterranean, starting in 1968, was the operation of Aswan High Dam across the Nile. While providing for increased human development, the project reduced the inflow of freshwater and ended all natural nutrient-rich silt entering the eastern Mediterranean at the Nile Delta. This provided less natural dilution of Mediterranean salinity and ended the higher levels of natural turbidity, additionally making conditions more like those in the Red Sea.[citation needed]

Invasive species originating from the Red Sea and introduced into the Mediterranean by the canal have become a major component of the Mediterranean ecosystem and have serious impacts on the ecology, endangering many local and endemic species. About 300 species from the Red Sea have been identified in the Mediterranean, and there are probably others yet unidentified. The Egyptian government's intent to enlarge the canal raised concerns from marine biologists, who feared that it would worsen the invasion of Red Sea species.[153]

Construction of the canal was preceded by cutting a small fresh-water canal called Sweet Water Canal from the Nile delta along Wadi Tumilat to the future canal, with a southern branch to Suez and a northern branch to Port Said. Completed in 1863, these brought fresh water to a previously arid area, initially for canal construction, and subsequently facilitating growth of agriculture and settlements along the canal.[154]

Suez Canal Economic Zone

The Suez Canal Economic Zone, sometimes shortened to the Suez Canal Zone, describes the set of locations neighbouring the canal where customs rates have been reduced to zero in order to attract investment. The zone comprises over 600 km2 within the governorates of Port Said, Ismailia and Suez. Projects in the zone are collectively described as the Suez Canal Area Development Project (SCADP).[155][156]

The plan focuses on development of East Port Said and the port of Ain Sokhna, and hopes to extend to four more ports at West Port Said, El-Adabiya, Arish and El Tor.[157]

The zone incorporates the three "Qualifying Industrial Zones" at Port Said, Ismailia and Suez, a 1996 American initiative to encourage economic ties between Israel and its neighbors.[158]

See also

Notes

  1. Lua error in package.lua at line 80: module 'strict' not found.
  2. Lua error in package.lua at line 80: module 'strict' not found.
  3. Lua error in package.lua at line 80: module 'strict' not found.
  4. 4.0 4.1 Lua error in package.lua at line 80: module 'strict' not found.
  5. Lua error in package.lua at line 80: module 'strict' not found.
  6. Lua error in package.lua at line 80: module 'strict' not found.
  7. Constantinople Convention of the Suez Canal of 2 March 1888 still in force and specifically maintained in Nasser's Nationalization Act.
  8. Lua error in package.lua at line 80: module 'strict' not found.
  9. 9.0 9.1 Lua error in package.lua at line 80: module 'strict' not found.
  10. Lua error in package.lua at line 80: module 'strict' not found.
  11. Lua error in package.lua at line 80: module 'strict' not found.
  12. 12.00 12.01 12.02 12.03 12.04 12.05 12.06 12.07 12.08 12.09 12.10 12.11 12.12 12.13 12.14 12.15 12.16 12.17  Lua error in package.lua at line 80: module 'strict' not found.
  13. 13.00 13.01 13.02 13.03 13.04 13.05 13.06 13.07 13.08 13.09 13.10 13.11 13.12 13.13 13.14 13.15 13.16 13.17 13.18 13.19 13.20 13.21 13.22 13.23 13.24 13.25 13.26 13.27 Rappoport, S. (Doctor of Philosophy, Basel). History of Egypt (undated, early 20th century), Volume 12, Part B, Chapter V: "The Waterways of Egypt", pages 248–257. London: The Grolier Society.
  14. 14.0 14.1 14.2 Hassan, F. A. & Tassie, G. J. Site location and history (2003). Kafr Hassan Dawood On-Line, Egyptian Cultural Heritage Organization Archived 16 April 2005 at the Wayback Machine. Retrieved 8 August 2008.
  15. 15.0 15.1 Please refer to Sesostris#Modern research.
  16. J. H. Breasted attributes the ancient canal's early construction to Senusret III, up through the first cataract. Please refer to J. H. Breasted, Ancient Records of Egypt, Part One, Chicago 1906, §§642–648
  17. Lua error in package.lua at line 80: module 'strict' not found.
  18. 18.0 18.1 The Columbia Encyclopedia, Sixth Edition, s.v. "Suez Canal" Archived 14 February 2009 at the Wayback Machine. Retrieved 14 May 2008.
  19. 19.0 19.1 19.2 19.3 19.4 Naville, Édouard. "Map of the Wadi Tumilat" (plate image), in The Store-City of Pithom and the Route of the Exodus (1885). London: Trubner and Company.
  20. Lua error in package.lua at line 80: module 'strict' not found.
  21. The Elder Pliny and John Healey Natural History (6.33.165) Penguin Classics; Reprint edition (5 February 2004) ISBN 978-0-14-044413-1 p. 70 books.google.com Archived 24 April 2016 at the Wayback Machine
  22. 22.0 22.1 Shea, William H. "A Date for the Recently Discovered Eastern Canal of Egypt", in Bulletin of the American Schools of Oriental Research, No. 226 (April 1977), pp. 31–38.
  23. Sanford (1938), p. 72; Garrison (1999), p. 36.
  24. Hess, Richard S. Rev. of Israel in Egypt: The Evidence for the Authenticity of the Exodus Tradition Archived 29 April 2005 at the Wayback Machine, by James K. Hoffmeier. The Denver Journal 1 (1 January 1998). Retrieved 14 May 2008.
  25. Hassan, Fekri A. Kafr Hassan Dawood On-line Archived 15 January 2010 at the Wayback Machine, 17 August 2003. Retrieved 14 May 2008.
  26. Script error: No such module "In lang". Martínez Babon, Javier. "Consideraciones sobre la Marinay la Guerra durante el Egipto Faraónico" Archived 1 February 2012 at the Wayback Machine. Retrieved 14 May 2008.
  27. Descriptions de l'Égypte, Volume 11 (État Moderne) Archived 19 August 2020 at the Wayback Machine, containing Mémoire sur la communication de la mer des Indes à la Méditerranée par la mer Rouge et l'Isthme de Sueys, par M. J.M. Le Père, ingénieur en chef, inspecteur divisionnaire au corps impérial des ponts et chaussées, membre de l'Institut d'Égypte, pp. 21–186
  28. Their reports were published in Description de l'Égypte
  29. Montet, Pierre. Everyday Life in the Days of Ramesses The Great (1981), page 184. Philadelphia: University of Pennsylvania Press.
  30. Silver, Morris. Ancient Economies II (6 April 1998), "5c. Evidence for Earlier Canals." ANCIENT ECONOMIES II Archived 21 October 2015 at the Wayback Machine. Retrieved 8 August 2008. Economics Department, City College of New York.
  31. Herodotus ii.158.
  32. "The figure '120,000' is doubtless exaggerated. Mehemet Ali lost only 10,000 in making the Mahmûdieh Canal (from the Nile to Alexandria)." remarked W. W. How and J. Wells, A Commentary on Herodotus.
  33. According to Herodotus, work on the project was "stayed by a prophetic utterance that he [Necho] was toiling beforehand for the barbarian. The Egyptians call all men of other languages barbarians." (Herodotus, eo. loc..)
  34. Lua error in package.lua at line 80: module 'strict' not found.
  35. 35.0 35.1 Apparently, Ptolemy considered the Great Bitter Lake as a northern extension of the Red Sea, whereas Darius had not, because Arsinoe is located north of Shaluf. (See Naville, "Map of the Wadi Tumilat", referenced above.)
  36. Please refer to Darius the Great's Suez Inscriptions.
  37. Lua error in package.lua at line 80: module 'strict' not found.
  38. Lua error in package.lua at line 80: module 'strict' not found.
  39. R. E. Gmirkin, "Berossus and Genesis, Manetho and Exodus: Hellenistic Histories and the Date of the Pentateuch", p. 236
  40. 40.0 40.1 Carte hydrographique de l'Basse Egypte et d'une partie de l'Isthme de Suez (1855, 1882). Volume 87, page 803. Paris. See [1] Archived 13 February 2009 at the Wayback Machine.
  41. Petermann, A. Karte Der Bai Von Súes (1856). Nach der Engl. Aufnahme v. Comm. Mansell.
  42. Tuchman, Barbara Bible and Sword: How the British came to Palestine MacMillan, London (1987) ISBN 0-333-33414-0
  43. Starthern, P (2013) "The Venetians" p. 175
  44. Ortega, Stephen (2012). "The Ottoman Age of Exploration". The Historian. 74 (1): 89.
  45. Rossi, N.; Rosand, David (2013). "Italian Renaissance Depictions of the Ottoman Sultan: Nuances in the Function of Early Modern Italian Portraiture". ProQuest.
  46. 46.0 46.1 Lua error in package.lua at line 80: module 'strict' not found.
  47. Please refer to Description de l'Égypte.
  48. Descriptions de l'Égypte, Volume 11 (État Moderne) Archived 19 August 2020 at the Wayback Machine, containing Mémoire sur la communication de la mer des Indes à la Méditerranée par la mer Rouge et l'Isthme de Sueys, par M. J.M. Le Père, ingénieur en chef, inspecteur divisionnaire au corps impérial des ponts et chaussées, membre de l'Institut d'Égypte, pp. 21–186
  49. 49.0 49.1 49.2 Wilson 1939.
  50. Overland Route later known as the Steam ship route which was the connection from Suez to Cairo, then down the Nile to the Mahmoudieh Canal and to the Mediterranean port of Alexandria. Superseded by the Suez canal, it operated from 1830 to 1869 and from 1837 with steam ships in the Red sea.
  51. Lua error in package.lua at line 80: module 'strict' not found.
  52. Percement de l'isthme de Suez. Rapport et Projet de la Commission Internationale. Documents Publiés par M. Ferdinand de Lesseps. Troisième série. Paris aux bureaux de l'Isthme de Suez, Journal de l'Union des deux Mers, et chez Henri Plon, Éditeur, 1856. On Google Books (french)
  53. Lord Kinross, Between Two Seas. The Creation of the Suez Canal, William Morrow & Company, Inc., New York, 1969, p. 87.
  54. Oster (2006)
  55. There is differing information on the exact amounts
  56. (reported by German historian Uwe A. Oster) Archived 19 August 2011 at the Wayback Machine
  57. Lua error in package.lua at line 80: module 'strict' not found.
  58. Lua error in package.lua at line 80: module 'strict' not found.
  59. 59.0 59.1 59.2 59.3 Lua error in package.lua at line 80: module 'strict' not found.
  60. Lua error in package.lua at line 80: module 'strict' not found.
  61. Lua error in package.lua at line 80: module 'strict' not found.
  62. Lua error in package.lua at line 80: module 'strict' not found.
  63. Lua error in package.lua at line 80: module 'strict' not found.
  64. Lua error in package.lua at line 80: module 'strict' not found.
  65. This incident appears to have been the basis for a myth that the Newport manoeuvered around the assembled yachts on the night of 16th/17th November, and beat the Aigle to be the first boat through the canal (see Talk)
  66. Glasgow Herald, 17 November 1903
  67. History of the Anchor Line 1852–1911. 1911. Glasgow, UK: John Horn, for Anchor Line.
  68. Lua error in package.lua at line 80: module 'strict' not found.
  69. Lua error in package.lua at line 80: module 'strict' not found.
  70. Protocol of the Commission (in Ffrench)
  71. (£1 in 1875 = £109–114; 2019 Historical Uk Inflation Rates and Calculator; UK Inflation (CPI) Calculator - What's the Cost)
  72. Lua error in package.lua at line 80: module 'strict' not found.
  73. Lua error in package.lua at line 80: module 'strict' not found.
  74. Mary Pelletier "A brief history of the Suez Canal" In: Apollo 3.7.2018.
  75. Hubert Bergmann "Selfmademan und Tycoon mit Weitblick: Pasquale Freiherr von Revoltella (German: Self-made man and tycoon with a vision: Pasquale Freiherr von Revoltella" In: Der Standard 25 June 2020.
  76. See: Pasquale Revoltella "Österreich's Betheiligung am Welthandel: Betrachtungen und Vorschläge" (2020).
  77. Lua error in package.lua at line 80: module 'strict' not found.
  78. Lua error in package.lua at line 80: module 'strict' not found.
  79. First World War – Willmott, H.P. Dorling Kindersley, 2003, Page 87
  80. Lua error in package.lua at line 80: module 'strict' not found.
  81. Lua error in package.lua at line 80: module 'strict' not found.
  82. Lua error in package.lua at line 80: module 'strict' not found.
  83. Lua error in package.lua at line 80: module 'strict' not found.
  84. Lua error in package.lua at line 80: module 'strict' not found.
  85. The Other Side of Suez (documentary) – 2003
  86. Lua error in package.lua at line 80: module 'strict' not found.
  87. Lua error in package.lua at line 80: module 'strict' not found.
  88. Lua error in package.lua at line 80: module 'strict' not found.
  89. Lua error in package.lua at line 80: module 'strict' not found.
  90. Lua error in package.lua at line 80: module 'strict' not found.
  91. Lua error in package.lua at line 80: module 'strict' not found.
  92. (Multinational Force and Observers Archived 19 August 2006 at the Wayback Machine)
  93. Lua error in package.lua at line 80: module 'strict' not found.
  94. Lua error in package.lua at line 80: module 'strict' not found.
  95. Lua error in package.lua at line 80: module 'strict' not found.
  96. 96.0 96.1 96.2 Lua error in package.lua at line 80: module 'strict' not found.
  97. Lua error in package.lua at line 80: module 'strict' not found.
  98. Lua error in package.lua at line 80: module 'strict' not found.
  99. Lua error in package.lua at line 80: module 'strict' not found.
  100. Lua error in package.lua at line 80: module 'strict' not found.
  101. Lua error in package.lua at line 80: module 'strict' not found.
  102. Lua error in package.lua at line 80: module 'strict' not found.
  103. Lua error in package.lua at line 80: module 'strict' not found.
  104. Lua error in package.lua at line 80: module 'strict' not found.
  105. Lua error in package.lua at line 80: module 'strict' not found.
  106. 106.0 106.1 106.2 106.3 Lua error in package.lua at line 80: module 'strict' not found.
  107. Lua error in package.lua at line 80: module 'strict' not found.
  108. Lua error in package.lua at line 80: module 'strict' not found.
  109. 109.0 109.1 Lua error in package.lua at line 80: module 'strict' not found.
  110. Lua error in package.lua at line 80: module 'strict' not found.
  111. Lua error in package.lua at line 80: module 'strict' not found.
  112. Lua error in package.lua at line 80: module 'strict' not found.
  113. Lua error in package.lua at line 80: module 'strict' not found.
  114. Lua error in package.lua at line 80: module 'strict' not found.
  115. 115.0 115.1 Lua error in package.lua at line 80: module 'strict' not found.
  116. Lua error in package.lua at line 80: module 'strict' not found.
  117. Lua error in package.lua at line 80: module 'strict' not found.
  118. Lua error in package.lua at line 80: module 'strict' not found.
  119. 119.0 119.1 Suez Canal Authority http://www.suezcanal.gov.eg Archived 13 June 2014 at the Wayback Machine
  120. Lua error in package.lua at line 80: module 'strict' not found.
  121. SC News
  122. Lua error in package.lua at line 80: module 'strict' not found.
  123. Lua error in package.lua at line 80: module 'strict' not found.
  124. http://www.suezcanal.gov.eg/sc.aspx?show=69
  125. Lua error in package.lua at line 80: module 'strict' not found.
  126. Lua error in package.lua at line 80: module 'strict' not found.
  127. Lua error in package.lua at line 80: module 'strict' not found.
  128. Lua error in package.lua at line 80: module 'strict' not found.
  129. Lua error in package.lua at line 80: module 'strict' not found.
  130. Lua error in package.lua at line 80: module 'strict' not found.
  131. Lua error in package.lua at line 80: module 'strict' not found.
  132. Lua error in package.lua at line 80: module 'strict' not found.
  133. Mary Pelletier "A brief history of the Suez Canal" In: Apollo 3.7.2018.
  134. Hans Reis "Der Suezkanal – die wichtigste von Menschen geschaffene Wasserstrasse wurde vor 150 Jahren gebaut und war oft umkämpft" In: Neue Zürcher Zeitung 17.11.2019
  135. Lua error in package.lua at line 80: module 'strict' not found.
  136. Gabriella Pultrone "Trieste: New Challenges and Opportunities in the Relational Dynamics between City and Port" In: Méditerranée, 111|2008 pp. 129.
  137. 137.0 137.1 Harry de Wilt: Is One Belt, One Road a China crisis for North Sea main ports? in World Cargo News, 17. December 2019.
  138. Alexandra Endres: Schifffahrt ist fürs Klima genau so schlimm wie Kohle in Die Zeit, 9. December 2019.
  139. Harry G. Broadman "Afrika´s Silk Road" (2007), pp 59.
  140. Marcus Hernig: Die Renaissance der Seidenstraße (2018), p 112.
  141. Tobias Piller "Italien als Teil von Chinas neuer Seidenstraße" In: Frankfurter Allgemeine Zeitung 15.3.2019.
  142. Lua error in package.lua at line 80: module 'strict' not found.
  143. Liam Stack, Arab countries meet to tackle Somali pirate threat Archived 25 January 2011 at the Wayback MachineThe Christian Science Monitor (21 November 2008).
  144. Louis Wasser, Somali piracy costs Suez Canal business Archived 12 January 2018 at the Wayback Machine, San Francisco Chronicle (29 April 2009).
  145. Lua error in package.lua at line 80: module 'strict' not found.
  146. Overland Mail by Thomas Fletcher Waghorn, Railway Alexandria – Cairo – Suez built by Robert Stephenson
  147. Lua error in package.lua at line 80: module 'strict' not found.
  148. Lua error in package.lua at line 80: module 'strict' not found.
  149. Lua error in package.lua at line 80: module 'strict' not found.
  150. Lua error in package.lua at line 80: module 'strict' not found.
  151. Lua error in package.lua at line 80: module 'strict' not found.
  152. Madl, Pierre (1999). Essay about the phenomenon of Lessepsian Migration Archived 31 July 2016 at the Wayback Machine, Colloquial Meeting of Marine Biology I, Salzburg, April 1999 (revised in Nov. 2001).
  153. Galil and Zenetos (2002)
  154. Britannica (2007)
  155. Lua error in package.lua at line 80: module 'strict' not found.
  156. Lua error in package.lua at line 80: module 'strict' not found.
  157. Lua error in package.lua at line 80: module 'strict' not found.
  158. Lua error in package.lua at line 80: module 'strict' not found.

References

  • Britannica (2007) "Suez Canal", in: The new Encyclopædia Britannica, 15th ed., 28, Chicago, Ill. ; London : Encyclopædia Britannica, ISBN 1-59339-292-3
  • Farnie, D.A. East and West of Suez: Suez Canal in History, 1854-1956, a stanmdard scholarly history; 870pp
  • Galil, B.S. and Zenetos, A. (2002). "A sea change: exotics in the eastern Mediterranean Sea", in: Leppäkoski, E., Gollasch, S. and Olenin, S. (eds), Invasive aquatic species of Europe : distribution, impacts, and management, Dordrecht ; Boston : Kluwer Academic, ISBN 1-4020-0837-6, p. 325–336
  • Garrison, Ervan G. (1999) A history of engineering and technology : artful methods, 2nd ed., Boca Raton, Fla. ; London : CRC Press, ISBN 0-8493-9810-X
  • Hallberg, Charles W. The Suez Canal: Its History and Diplomatic Importance (1931), a standard scholarly history; 440pp; online Archived 20 July 2018 at the Wayback Machine
  • Karabell, Zachary (2003) Parting the Desert: The Creation of the Suez Canal, Knopf, ISBN 978-0-375-40883-0
  • Oster, Uwe (2006) Le fabuleux destin des inventions : le canal de Suez, TV documentary produced by ZDF and directed by Axel Engstfeld (Germany)
  • Lua error in package.lua at line 80: module 'strict' not found.
  • Sanford, Eva Matthews (1938) The Mediterranean world in ancient times, Ronald series in history, New York : The Ronald Press Company, 618 p.
  • Pudney, John. Suez; De Lesseps' Canal. New York: Praeger, 1969. Print.
  • Lua error in package.lua at line 80: module 'strict' not found.

External links