Coordinates | Lua error in package.lua at line 80: module 'strict' not found. |
Construction began | 2014 |
Opening date | 2020 (est.) |
Dam and spillways | |
Type of dam | Gravity |
Impounds | Jinsha River |
Height | 240 m (787 ft) |
Reservoir | |
Total capacity | 4,000,000,000 m3 (3,200,000 acre·ft) |
Power station | |
Commission date | 2018-2020 (est.) |
Turbines | 12 × 725 MW Francis-type |
Installed capacity | 8,700 MW |
The Wudongde Dam (simplified Chinese: 乌东德坝; traditional Chinese: 烏東德壩; pinyin: Wūdōngdé Bà) is a large hydroelectric dam currently under construction on the Jinsha River, a tributary of the Yangtze River in Sichuan and Yunnan provinces, southwest China. The design is one of the tallest in the world at 240 m (787 ft), and will generate power by utilizing 12 turbines, each with a generating capacity of 725 MW, totalling the generating capacity to 8,700 MW. Construction began in 2014, the first generator is scheduled to be commissioned in 2018 and the entire project completed in 2020.[1][2][3][4]
See also
References
- ↑ 樊启祥考察金沙江乌东德水电站坝址和对外交通,要求把工程前期工作做深做细
- ↑ Dams on the Jinsha River
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
<templatestyles src="Asbox/styles.css"></templatestyles>
<templatestyles src="Asbox/styles.css"></templatestyles>
<templatestyles src="Asbox/styles.css"></templatestyles>
- Articles containing simplified Chinese-language text
- Articles containing traditional Chinese-language text
- Hydroelectric power stations in Sichuan
- Hydroelectric power stations in Yunnan
- Dams under construction in China
- Dams on the Jinsha River
- Dams in China
- Pages with broken file links
- Hydroelectric power plant stubs
- Asian dam stubs
- Power station stubs
- People's Republic of China building and structure stubs