Fukushima Daiichi nuclear disaster

From Infogalactic: the planetary knowledge core
Jump to: navigation, search

<templatestyles src="Module:Hatnote/styles.css"></templatestyles>

<templatestyles src="Module:Hatnote/styles.css"></templatestyles>

Fukushima Daiichi nuclear disaster
Fukushima I by Digital Globe.jpg
Image on 16 March 2011 of the four damaged reactor buildings. From left to right: Unit 4, 3, 2 and 1. Hydrogen-air explosions occurred in Unit 1, 3 and 4, causing structural damage. A vent in Unit 2's wall, with water vapor/"steam" clearly visible, prevented a similar large explosion. Drone overflights on 20 March captured clearer images.[1]
Date 11 March 2011 (2011-03-11)
Location Ōkuma, Fukushima, Japan
Coordinates Lua error in package.lua at line 80: module 'strict' not found.
Outcome INES Level 7 (major accident)[2][3]
Non-fatal injuries 37 with physical injuries,[4][not in citation given]
2 workers taken to hospital with possible radiation burns[5]
IAEA experts at Fukushima Daiichi Nuclear Power Plant Unit 4, 2013

The Fukushima Daiichi nuclear disaster (福島第一原子力発電所事故 Fukushima Dai-ichi (<phonos file="福島第一.ogg">pronunciation</phonos>) genshiryoku hatsudensho jiko?) was an energy accident at the Fukushima I Nuclear Power Plant in Fukushima, initiated primarily by the tsunami following the Tōhoku earthquake on 11 March 2011.[6] Immediately after the earthquake, the active reactors automatically shut down their sustained fission reactions. However, the tsunami disabled the emergency generators that would have provided power to control and operate the pumps necessary to cool the reactors. The insufficient cooling led to three nuclear meltdowns, hydrogen-air chemical explosions, and the release of radioactive material in Units 1, 2 and 3 from 12 March to 15 March. Loss of cooling also caused the pool for storing spent fuel from Reactor 4 to overheat on 15 March due to the decay heat from the fuel rods.

On 5 July 2012, the Fukushima Nuclear Accident Independent Investigation Commission (NAIIC) found that the causes of the accident had been foreseeable, and that the plant operator, Tokyo Electric Power Company (TEPCO), had failed to meet basic safety requirements such as risk assessment, preparing for containing collateral damage, and developing evacuation plans. On 12 October 2012, TEPCO admitted for the first time that it had failed to take necessary measures for fear of inviting lawsuits or protests against its nuclear plants.[7][8][9][10]

The Fukushima disaster was the most significant nuclear incident since April 26, 1986 the Chernobyl disaster and the second disaster to be given the Level 7 event classification of the International Nuclear Event Scale.[11] Though there have been no fatalities linked to radiation due to the accident, the eventual number of cancer deaths, according to the linear no-threshold theory of radiation safety, that will be caused by the accident is expected to be around 130–640 people in the years and decades ahead.[12][13][14] The United Nations Scientific Committee on the Effects of Atomic Radiation[15] and World Health Organization report that there will be no increase in miscarriages, stillbirths or physical and mental disorders in babies born after the accident.[16] However, an estimated 1,600 deaths are believed to have occurred due to the resultant evacuation conditions.[17][18] There are no clear plans for decommissioning the plant, but the plant management estimate is 30 or 40 years.[19] A frozen soil barrier has been constructed in an attempt to prevent further contamination of seeping groundwater,[20] but in July 2016 TEPCO revealed that the ice wall had failed to stop groundwater from flowing in and mixing with highly radioactive water inside the wrecked reactor buildings, adding that they are "technically incapable of blocking off groundwater with the frozen wall".[21]

In February 2017, TEPCO released images taken inside Reactor 2 by a remote-controlled camera, that show there is a 2-meter hole in the metal grating under the pressure vessel in the reactor’s primary containment vessel,[22] which could have been caused by fuel escaping the pressure vessel. Radiation levels of about 210 Sv per hour were subsequently detected inside the Unit 2 containment vessel.[23]

<templatestyles src="Template:TOC limit/styles.css" />

Overview

The Fukushima I Nuclear Power Plant comprised six separate boiling water reactors originally designed by General Electric (GE) and maintained by the Tokyo Electric Power Company (TEPCO). At the time of the Tōhoku earthquake on 11 March 2011, reactors 4, 5 and 6 were shut down in preparation for re-fueling.[24] However, their spent fuel pools still required cooling.[25]

Immediately after the earthquake, the electricity-producing Reactors 1, 2 and 3 automatically shut down their sustained fission reactions by inserting control rods in a legally-mandated safety procedure referred to as SCRAM, which ceases the reactors' normal running conditions. As the reactors were unable to generate power to run their own coolant pumps, emergency diesel generators came online, as designed, to power electronics and coolant systems. These operated nominally until the tsunami destroyed the generators for Reactors 1–5. The two generators cooling Reactor 6 were undamaged and were sufficient to be pressed into service to cool the neighboring Reactor 5 along with their own reactor, averting the overheating issues that Reactor 4 suffered.[25]

The largest tsunami wave was 13 meters high and hit 50 minutes after the initial earthquake, overwhelming the plant's seawall, which was 10 m high.[6] The moment of impact was recorded by a camera.[26] Water quickly flooded the low-lying rooms in which the emergency generators were housed.[27] The flooded diesel generators failed soon afterwards, resulting in a loss of power to the critical coolant water pumps. These pumps needed to continuously circulate coolant water through a Generation II reactor for several days to keep the fuel rods from melting, as the fuel rods continued to generate decay heat after the SCRAM event. The fuel rods would become hot enough to melt during the fuel decay time period if an adequate heat sink was not available. After the secondary emergency pumps (run by back-up electrical batteries) ran out, one day after the tsunami, 12 March,[28] the water pumps stopped and the reactors began to overheat. The insufficient cooling eventually led to meltdowns in Reactors 1, 2, and 3, where the resulting corium is believed to have melted through the bottom of each reactor pressure vessel.

Meanwhile, as workers struggled to supply power to the reactors' coolant systems and restore power to their control rooms, a number of hydrogen-air chemical explosions occurred, the first in Unit 1, on 12 March and the last in Unit 4, on 15 March.[28][29][30] It is estimated that the hot zirconium fuel cladding-water reaction in Reactors 1–3 produced 800 to 1000 kilograms of hydrogen gas each. The pressurized gas was vented out of the reactor pressure vessel where it mixed with the ambient air, and eventually reached explosive concentration limits in units 1 and 3. Due to piping connections between units 3 and 4, or alternatively from the same reaction occurring in the spent fuel pool in unit 4 itself,[31] unit 4 also filled with hydrogen, resulting in an explosion. In each case, the hydrogen-air explosions occurred at the top of each unit, that was in their upper secondary containment buildings.[32][33] Drone overflights on 20 March and afterwards captured clear images of the effects of each explosion on the outside structures, while the view inside was largely obscured by shadows and debris.[1]

There have been no fatalities linked to short term overexposure to radiation reported due to the Fukushima accident, while approximately 18,500 people died due to the earthquake and tsunami. The maximum cancer mortality and morbidity estimate according to the Linear no-threshold theory is 1,500 and 1,800 but with most estimates considerably lower, in the range of a few hundred.[34] In addition, the rates of psychological distress among evacuated people rose fivefold compared to the Japanese average due to the experience of the disaster and evacuation.[35]

In 2013, the World Health Organization (WHO) indicated that the residents of the area who were evacuated were exposed to low amounts of radiation and that radiation-induced health impacts are likely to be low.[36][37] In particular, the 2013 WHO report predicts that for evacuated infant girls, their 0.75% pre-accident lifetime risk of developing thyroid cancer is calculated to be increased to 1.25% by being exposed to radioiodine, with the increase being slightly less for males. The risks from a number of additional radiation-induced cancers are also expected to be elevated due to exposure caused by the other low boiling point fission products that were released by the safety failures. The single greatest increase is for thyroid cancer, but in total, an overall 1% higher lifetime risk of developing cancers of all types, is predicted for infant females, with the risk slightly lower for males, making both some of the most radiation-sensitive groups.[37] Along with those within the womb, which the WHO predicted, depending on their gender, to have the same elevations in risk as the infant groups.[38]

A screening program a year later in 2012 found that more than a third (36%) of children in Fukushima Prefecture have abnormal growths in their thyroid glands.[39] As of August 2013, there have been more than 40 children newly diagnosed with thyroid cancer and other cancers in Fukushima prefecture as a whole. In 2015, the number of thyroid cancers or detections of developing thyroid cancers numbered 137.[40] However, whether these incidences of cancer are elevated above the rate in un-contaminated areas and therefore were due to exposure to nuclear radiation is unknown at this stage.[citation needed] Data from the Chernobyl accident showed that an unmistakable rise in thyroid cancer rates following the disaster in 1986 only began after a cancer incubation period of 3–5 years;[41] however, whether this data can be directly compared to the Fukushima nuclear disaster is yet to be determined.[42]

A survey by the newspaper Mainichi Shimbun computed that of some 300,000 people who evacuated the area, approximately 1,600 deaths related to the evacuation conditions, such as living in temporary housing and hospital closures, had occurred as of August 2013, a number comparable to the 1,599 deaths directly caused by the earthquake and tsunami in the Fukushima Prefecture in 2011. The exact causes of the majority of these evacuation related deaths were not specified, as according to the municipalities, that would hinder application for condolence money compensation[17][18] by the relatives of the deceased.

On 5 July 2012, the Japanese National Diet-appointed Fukushima Nuclear Accident Independent Investigation Commission (NAIIC) submitted its inquiry report to the Japanese Diet.[43] The Commission found the nuclear disaster was "manmade", that the direct causes of the accident were all foreseeable prior to 11 March 2011. The report also found that the Fukushima Daiichi Nuclear Power Plant was incapable of withstanding the earthquake and tsunami. TEPCO, the regulatory bodies (NISA and NSC) and the government body promoting the nuclear power industry (METI), all failed to correctly develop the most basic safety requirements—such as assessing the probability of damage, preparing for containing collateral damage from such a disaster, and developing evacuation plans for the public in the case of a serious radiation release. Meanwhile, the government-appointed Investigation Committee on the Accident at the Fukushima Nuclear Power Stations of Tokyo Electric Power Company submitted its final report to the Japanese government on 23 July 2012.[44] A separate study by Stanford researchers found that Japanese plants operated by the largest utility companies were particularly unprotected against potential tsunami.[6]

TEPCO admitted for the first time on 12 October 2012 that it had failed to take stronger measures to prevent disasters for fear of inviting lawsuits or protests against its nuclear plants.[7][8][9][10] There are no clear plans for decommissioning the plant, but the plant management estimate is thirty or forty years.[19]

A frozen soil barrier was constructed in an attempt to prevent further contamination of seeping groundwater by melted-down nuclear fuel,[20] but in July 2016 TEPCO revealed that the ice wall had failed to stop groundwater from flowing in and mixing with highly radioactive water inside the wrecked reactor buildings, adding that they are "technically incapable of blocking off groundwater with the frozen wall".[45][21]

Plant description

<templatestyles src="Module:Hatnote/styles.css"></templatestyles>

The Fukushima I (Daiichi) Nuclear Power Plant consisted of six GE light water boiling water reactors (BWRs) with a combined power of 4.7 gigawatts, making it one of the world's 25 largest nuclear power stations. It was the first GE-designed nuclear plant to be constructed and run entirely by the Tokyo Electric Power Company (TEPCO). Reactor 1 was a 439 MWe type (BWR-3) reactor constructed in July 1967, and commenced operation on 26 March 1971.[46] It was designed to withstand an earthquake with a peak ground acceleration of 0.18 g (1.74 m/s2) and a response spectrum based on the 1952 Kern County earthquake.[47] Reactors 2 and 3 were both 784 MWe type BWR-4s. Reactor 2 commenced operation in July 1974, and Reactor 3 in March 1976. The earthquake design basis for all units ranged from 0.42 g (4.12 m/s2) to 0.46 g (4.52 m/s2).[48][49] After the 1978 Miyagi earthquake, when the ground acceleration reached 0.125 g (1.22 m/s2) for 30 seconds, no damage to the critical parts of the reactor was found.[47] Units 1–5 have a Mark-1 type (light bulb torus) containment structure; unit 6 has Mark 2-type (over/under) containment structure.[47] In September 2010, Reactor 3 was partially fueled by mixed-oxides (MOX).[50]

At the time of the accident, the units and central storage facility contained the following numbers of fuel assemblies:[51]

Location Unit 1 Unit 2 Unit 3 Unit 4 Unit 5 Unit 6 Central storage
Reactor fuel assemblies 400 548 548 0 548 764 0
Spent fuel assemblies[52] 292 587 514 1331 946 876 6375[53]
Fuel UO
2
UO
2
UO
2
/MOX
UO
2
UO
2
UO
2
UO
2
New fuel assemblies[54] 100 28 52 204 48 64 N/A

There is no MOX fuel in any of the cooling ponds. The only MOX fuel is loaded in the Unit 3 reactor.[citation needed]

Cooling

Diagrammatic representation of the cooling systems of a BWR

<templatestyles src="Module:Hatnote/styles.css"></templatestyles>

Nuclear reactors generate electricity by using the heat of the fission reaction to create steam. When the reactor stops operating, the radioactive decay of unstable isotopes in the fuel continues to generate heat (decay heat) for a time, and so require continued cooling.[55][56] Initially this decay heat amounts to approximately 6.5% of the amount produced by fission,[55] decreasing over several days before reaching shutdown levels.[57] Afterwards, spent fuel rods typically require several years in a spent fuel pool before they can be safely transferred to dry cask storage vessels.[58] The decay heat in the Unit 4 spent fuel pool had the capacity to boil about 70 metric tons of water per day (12 gallons per minute).[59]

In the reactor core, high-pressure systems cycle water between the reactor pressure vessel and heat exchangers. These systems transfer heat to a secondary heat exchanger via the essential service water system, using water pumped out to sea or an onsite cooling tower.[60] Units 2 and 3 were equipped with steam turbine-driven emergency core cooling systems that could be directly operated by steam produced by decay heat, and which could inject water directly into the reactor.[61] Some electrical power was needed to operate valves and monitoring systems.

Unit 1 was equipped with a different, entirely passive cooling system, the Isolation Condenser (IC). It consisted of a series of pipes run from the reactor core to the inside of a large tank of water. When the valves are opened, steam flows upward to the IC where the cool water in the tank condenses the steam back to water, and it runs under gravity back to the reactor core. For unknown reasons, Unit 1's IC was operated only intermittently during the emergency. However, during a 25 March 2014 presentation to the TVA, Dr Takeyuki Inagaki explained that the IC was being operated intermittently to maintain reactor vessel level and to prevent the core from cooling too quickly which can increase reactor power. Unfortunately, as the tsunami engulfed the station, the IC valves were closed and could not be reopened automatically due to the loss of electrical power, but could have been opened manually.[62] On 16 April 2011, TEPCO declared that cooling systems for Units 1–4 were beyond repair.[63]

Backup generators

When the reactor is not producing electricity, cooling pumps can be powered by other reactor units, the grid or by diesel generators or batteries.[64][65]

Two emergency diesel generators were available for each of units 1–5 and three for unit 6.[66]

In the late 1990s, three additional backup generators for Units 2 and 4 were placed in new buildings located higher on the hillside, to comply with new regulatory requirements. All six units were given access to these generators, but the switching stations that sent power from these backup generators to the reactors' cooling systems for Units 1 through 5 were still in the poorly protected turbine buildings. The switching station for Unit 6 was protected inside the only GE Mark II reactor building and continued to function.[67] All three of the generators added in the late 1990s were operational after the tsunami. If the switching stations had been moved to inside the reactor buildings or to other flood-proof locations, power would have been provided by these generators to the reactors' cooling systems.[67]

The reactor's emergency diesel generators and DC batteries, crucial components in powering cooling systems after a power loss, were located in the basements of the reactor turbine buildings, in accordance with GE's specifications. Mid-level engineers expressed concerns that this left them vulnerable to flooding.[68]

Fukushima I was not designed for such a large tsunami,[69][70] nor had the reactors been modified when concerns were raised in Japan and by the IAEA.[71]

Fukushima II was also struck by the tsunami. However, it had incorporated design changes that improved its resistance to flooding, reducing flood damage. Generators and related electrical distribution equipment were located in the watertight reactor building, so that power from the electricity grid was being used by midnight.[72] Seawater pumps for cooling were protected from flooding, and although 3 of 4 initially failed, they were restored to operation.[73]

Central fuel storage areas

Used fuel assemblies taken from reactors are initially stored for at least 18 months in the pools adjacent to their reactors. They can then be transferred to the central fuel storage pond.[4] Fukushima I's storage area contains 6375 fuel assemblies. After further cooling, fuel can be transferred to dry cask storage, which has shown no signs of abnormalities.[74]

Zircaloy

Many of the internal components and fuel assembly cladding are made from zircaloy because it is relatively transparent to neutrons. At normal operating temperatures of approximately 300 °C (572 °F), zircaloy is inert. However, above 1200 degrees Celsius, zirconium metal can react exothermically with water to form free hydrogen gas.[75] The reaction between zirconium and the coolant produces more heat, accelerating the reaction.[76] In addition, zircaloy can react with uranium dioxide to form zirconium dioxide and uranium metal. This exothermic reaction together with the reaction of boron carbide with stainless steel can release additional heat energy, thus contributing to the overheating of a reactor.[77]

Prior safety concerns

1967: Layout of the emergency-cooling system

The Fukushima reactor control room in 1999

On 27 February 2012, the Nuclear and Industrial Safety Agency ordered TEPCO to report its reasoning for changing the piping layout for the emergency cooling system.

The original plans separated the piping systems for two reactors in the isolation condenser from each other. However, the application for approval of the construction plan showed the two piping systems connected outside the reactor. The changes were not noted, in violation of regulations.[78]

After the tsunami, the isolation condenser should have taken over the function of the cooling pumps, by condensing the steam from the pressure vessel into water to be used for cooling the reactor. However, the condenser did not function properly and TEPCO could not confirm whether a valve was opened.

1991: Backup generator of Reactor 1 flooded

On 30 October 1991, one of two backup generators of Reactor 1 failed, after flooding in the reactor's basement. Seawater used for cooling leaked into the turbine building from a corroded pipe at 20 cubic meters per hour, as reported by former employees in December 2011. An engineer was quoted as saying that he informed his superiors of the possibility that a tsunami could damage the generators. TEPCO installed doors to prevent water from leaking into the generator rooms.

The Japanese Nuclear Safety Commission stated that it would revise its safety guidelines and would require the installation of additional power sources. On 29 December 2011, TEPCO admitted all these facts: its report mentioned that the room was flooded through a door and some holes for cables, but the power supply was not cut off by the flooding, and the reactor was stopped for one day. One of the two power sources was completely submerged, but its drive mechanism had remained unaffected.[79]

2008: Tsunami study ignored

In 2007, TEPCO set up a department to supervise its nuclear facilities. Until June 2011, its chairman was Masao Yoshida, the Fukushima Daiichi chief. A 2008 in-house study identified an immediate need to better protect the facility from flooding by seawater. This study mentioned the possibility of tsunami-waves up to 10.2 metres (33 ft). Headquarters officials insisted that such a risk was unrealistic and did not take the prediction seriously.[80][verification needed]

A Mr. Okamura of the Active Fault and Earthquake Research Center urged TEPCO and NISA to review their assumption of possible tsunami heights based on a tenth century earthquake, but it was not seriously considered at that time.[81] The U.S. Nuclear Regulatory Commission warned of a risk of losing emergency power in 1991 (NUREG-1150) and NISA referred to the report in 2004. No action to mitigate the risk was taken.[82]

Vulnerability to earthquakes

Japan, like the rest of the Pacific Rim, is in an active seismic zone, prone to earthquakes. The International Atomic Energy Agency (IAEA) had expressed concern about the ability of Japan's nuclear plants to withstand earthquakes. At a 2008 meeting of the G8's Nuclear Safety and Security Group in Tokyo, an IAEA expert warned that a strong earthquake with a magnitude above 7.0 could pose a "serious problem" for Japan's nuclear power stations.[83] The region had experienced three earthquakes of magnitude greater than 8, including the 869 Jogan Sanriku earthquake, the 1896 Meiji-Sanriku earthquake, and the 1933 Sanriku earthquake.

Events

<templatestyles src="Module:Hatnote/styles.css"></templatestyles>

Tōhoku earthquake

The 9.0 MW Tōhoku earthquake occurred at 14:46 on Friday, 11 March 2011, with the epicenter near Honshu, the largest island of Japan.[84] It produced maximum ground g-forces of 0.56, 0.52, 0.56 (5.50, 5.07 and 5.48 m/s2) at units 2, 3 and 5 respectively. This exceeded the earthquake tolerances[clarification needed] of 0.45, 0.45 and 0.46 g (4.38, 4.41 and 4.52 m/s2). The shock values were within the design tolerances at units 1, 4 and 6.[49]

When the earthquake struck, units 1, 2 and 3 were operating, but units 4, 5 and 6 had been shut down for a scheduled inspection.[48][85] Reactors 1, 2 and 3 immediately shut down automatically;[86][87] this meant the plant stopped generating electricity and could no longer use its own power.[88] One of the two connections to off-site power for units 1–3 also failed,[88] so 13 on-site emergency diesel generators began providing power.[89]

Tsunami and flooding

The height of the tsunami that struck the station approximately 50 minutes after the earthquake.
A: Power station buildings
B: Peak height of tsunami
C: Ground level of site
D: Average sea level
E: Seawall to block waves

The earthquake triggered a 13-to-15-metre (43 to 49 ft)-high tsunami that arrived approximately 50 minutes later. The waves overtopped the plant's 5.7 metres (19 ft) seawall,[90][91][92] flooding the basements of the power plant's turbine buildings and disabling the emergency diesel generators[66][93][94] at approximately 15:41.[88][95] TEPCO then notified authorities of a "first-level emergency".[86] The switching stations that provided power from the three backup generators located higher on the hillside failed when the building that housed them flooded.[67] Power for the plant's control systems switched to batteries designed to provide power for about eight hours.[96] Further batteries and mobile generators were dispatched to the site, but were delayed by poor road conditions; the first arrived at 21:00 11 March,[89][97] almost six hours after the tsunami struck.

Multiple unsuccessful attempts were made to connect portable generating equipment to power water pumps. The failure was attributed to flooding at the connection point in the Turbine Hall basement and the absence of suitable cables.[93] TEPCO switched its efforts to installing new lines from the grid.[98] One generator at unit 6 resumed operation on 17 March, while external power returned to units 5 and 6 only on 20 March.[99]

Evacuation

The government initially set in place a four-stage evacuation process: a prohibited access area out to 3 km, an on-alert area 3–20 km and an evacuation prepared area 20–30 km. On day one, an estimated 170,000 people[100] were evacuated from the prohibited access and on-alert areas. Prime Minister Kan instructed people within the on-alert area to leave and urged those in the prepared area to stay indoors.[101][102] The latter groups were urged to evacuate on 25 March.[103] The 20 kilometer exclusion zone was guarded by roadblocks to ensure that fewer people would be affected by the radiation.[104]

The earthquake and tsunami damaged or destroyed more than one million buildings leading to a total of 470,000 people needing evacuation. Of the 470,000, the nuclear accident was responsible for 154,000 being evacuated.[105]

As of March 2016, of the original 470,000 evacuees, 174,000 remain.[106]

Units 1, 2 and 3

Lua error in package.lua at line 80: module 'strict' not found.

<templatestyles src="Module:Hatnote/styles.css"></templatestyles>

In Reactors 1, 2 and 3, overheating caused a reaction between the water and the zircaloy, creating hydrogen gas.[107][108][109] On 12 March, an explosion in Unit 1 was caused by the ignition of the hydrogen, destroying the upper part of the building. On 14 March, a similar explosion occurred in the Reactor 3 building, blowing off the roof and injuring eleven people. On the 15th, there was an explosion in the Reactor 2 building due to a shared vent pipe with Reactor 3.

Core meltdowns

The amount of damage sustained by the reactor cores during the accident, and the location of molten nuclear fuel ("corium") within the containment buildings, is unknown; TEPCO has revised its estimates several times.[110] On 16 March 2011, TEPCO estimated that 70% of the fuel in Unit 1 had melted and 33% in Unit 2, and that Unit 3's core might also be damaged.[111] As of 2015 it can be assumed that most fuel melted through the reactor pressure vessel (RPV), commonly known as the "reactor core") and is resting on the bottom of the primary containment vessel (PCV), having been stopped by the PCV concrete.[112][113][114][115]

TEPCO released further estimates of the state and location of the fuel in a November 2011 report.[116] The report concluded that the Unit 1 RPV was damaged during the disaster and that "significant amounts" of molten fuel had fallen into the bottom of the PCV. The erosion of the concrete of the PCV by the molten fuel after the core meltdown was estimated to stop in approx. 0.7 metres (2 ft 4 in) in depth, while the thickness of the containment is 7.6 metres (25 ft) thick. Gas sampling carried out before the report detected no signs of an ongoing reaction of the fuel with the concrete of the PCV and all the fuel in Unit 1 was estimated to be "well cooled down, including the fuel dropped on the bottom of the reactor". Fuel in Units 2 and 3 had melted, however less than Unit 1, and fuel was presumed to be still in the RPV, with no significant amounts of fuel fallen to the bottom of the PCV.[needs update] The report further suggested that "there is a range in the evaluation results" from "all fuel in the RPV (none fuel fallen to the PCV)" in Unit 2 and Unit 3, to "most fuel in the RPV (some fuel in PCV)". For Unit 2 and Unit 3 it was estimated that the "fuel is cooled sufficiently". The larger damage in Unit 1 in comparison with the other two units was according to the report due to longer time that no cooling water was injected in Unit 1, which resulted in much more decay heat to accumulate – for about 1 day there was no water injection for Unit 1, while Unit 2 and Unit 3 had only a quarter of a day without water injection.[116]

In November 2013, Mari Yamaguchi reported for Associated Press that there are computer simulations which suggest that "the melted fuel in Unit 1, whose core damage was the most extensive, has breached the bottom of the primary containment vessel and even partially eaten into its concrete foundation, coming within about 30 centimeters (one foot) of leaking into the ground" – a Kyoto University nuclear engineer said with regards to these estimates: "We just can't be sure until we actually see the inside of the reactors."[110]

According to a December 2013 report, TEPCO estimated for Unit 1 that "the decay heat must have decreased enough, the molten fuel can be assumed to remain in PCV (primary container vessel)".[112]

In August 2014, TEPCO released a new revised estimate that Reactor 3 had a complete melt through in the initial phase of the accident. According to this new estimate within the first three days of the accident the entire core content of Reactor 3 had melted through the RPV and fallen to the bottom of the PCV.[114][115][117] These estimates were based on a simulation, which indicated that Reactor 3's melted core penetrated through 1.2 metres (3 ft 11 in) of the PCV's concrete base, and came close to 26–68 centimetres (10–27 in) of the PCV's steel wall.[113]

In February 2015, TEPCO started the muon scanning process for Units 1, 2 and 3.[118][119] With this scanning setup it will be possible to determine the approximate amount and location of the remaining nuclear fuel within the RPV, but not the amount and resting place of the corium in the PCV. In March 2015 TEPCO released the result of the muon scan for Unit 1 which showed that no fuel was visible in the RPV, which would suggest that most if not all of the molten fuel had dropped onto the bottom of the PCV – this will change the plan for the removal of the fuel from Unit 1.[120][121]

In February 2017, six years after the disaster, radiation levels inside the Unit 2 containment building were estimated to be about 650 sieverts per hour.[122] These readings were the highest recorded since the disaster occurred in 2011 and the first recorded in that area of the reactor since the meltdowns. Images showed a hole in metal grating beneath the reactor pressure vessel, suggesting that melted nuclear fuel had escaped the vessel in that area.[123]

Units 4, 5 and 6

<templatestyles src="Module:Hatnote/styles.css"></templatestyles>

Aerial view of the station in 1975, showing separation between units 5 and 6, and 1–4. Unit 6, not completed until 1979, is seen under construction.

Unit 4

Reactor 4 was not operating when the earthquake struck. All fuel rods from Unit 4 had been transferred to the spent fuel pool on an upper floor of the reactor building prior to the tsunami. On 15 March, an explosion damaged the fourth floor rooftop area of Unit 4, creating two large holes in a wall of the outer building. It was reported that water in the spent fuel pool might be boiling. Radiation inside the Unit 4 control room prevented workers from staying there for long periods. Visual inspection of the spent fuel pool on 30 April revealed no significant damage to the rods. A radiochemical examination of the pond water confirmed that little of the fuel had been damaged.[124]

In October 2012, the former Japanese Ambassador to Switzerland and Senegal, Mitsuhei Murata, said that the ground under Fukushima Unit 4 was sinking, and the structure may collapse.[125][126]

In November 2013, TEPCO started the process of moving the 1533 fuel rods in the Unit 4 cooling pool to the central pool. This process was completed on 22 December 2014.[127]

Units 5 and 6

Reactors 5 and 6 were also not operating when the earthquake struck. Unlike Reactor 4, their fuel rods remained in the reactor. The reactors had been closely monitored, as cooling processes were not functioning well.[128] Both Unit 5 and Unit 6 shared a working generator and switchgear during the emergency and achieved a successful cold shutdown nine days later on 20 March.[129][67]

Central fuel storage areas

On 21 March, temperatures in the fuel pond had risen slightly, to 61 °C and water was sprayed over the pool.[4] Power was restored to cooling systems on 24 March and by 28 March, temperatures were reported down to 35 °C.[130]

Contamination

<templatestyles src="Module:Hatnote/styles.css"></templatestyles>

Sub article: Comparison of Fukushima and Chernobyl nuclear accident with detailed tables inside
Map of contaminated areas around the plant (22 March – 3 April 2011)
Fukushima dose rate comparison to other incidents and standards, with graph of recorded radiation levels and specific accident events from 11 to 30 March
Radiation measurements from Fukushima Prefecture, March 2011
Seawater-contamination along coast with Caesium-137, from 21 March until 5 May 2011 (Source: GRS)
Radiation hotspot in Kashiwa, February 2012

Radioactive material was released from the containment vessels for several reasons: deliberate venting to reduce gas pressure, deliberate discharge of coolant water into the sea, and uncontrolled events. Concerns about the possibility of a large scale release led to a 20-kilometre (12 mi) exclusion zone around the power plant and recommendations that people within the surrounding 20–30 km zone stay indoors. Later, the UK, France and some other countries told their nationals to consider leaving Tokyo, in response to fears of spreading contamination.[131] In 2015, the tap water contamination was still higher in Tokyo compared to other cities in Japan.[132] Trace amounts of radioactivity, including iodine-131, caesium-134 and caesium-137, were widely observed.[133][134][135]

Between 21 March and mid-July, around 2.7 × 1016 Bq of caesium-137 (about 8.4 kg) entered the ocean, with about 82 percent having flowed into the sea before 8 April.[136] However, the Fukushima coast has some of the world's strongest currents and these transported the contaminated waters far into the Pacific Ocean, thus causing great dispersion of the radioactive elements. The results of measurements of both the seawater and the coastal sediments led to the supposition that the consequences of the accident, in terms of radioactivity, would be minor for marine life as of autumn 2011 (weak concentration of radioactivity in the water and limited accumulation in sediments). On the other hand, significant pollution of sea water along the coast near the nuclear plant might persist, due to the continuing arrival of radioactive material transported towards the sea by surface water running over contaminated soil. Organisms that filter water and fish at the top of the food chain are, over time, the most sensitive to caesium pollution. It is thus justified to maintain surveillance of marine life that is fished in the coastal waters off Fukushima. Despite caesium isotopic concentration in the waters off of Japan being 10 to 1000 times above concentration prior to the accident, radiation risks are below what is generally considered harmful to marine animals and human consumers.[137]

A monitoring system operated by the Preparatory Commission for the Comprehensive Nuclear-Test-Ban Treaty Organization (CTBTO) tracked the spread of radioactivity on a global scale. Radioactive isotopes were picked up by over 40 monitoring stations.[138]

On 12 March, radioactive releases first reached a CTBTO monitoring station in Takasaki, Japan, around 200 km away. The radioactive isotopes appeared in eastern Russia on 14 March and the west coast of the United States two days later. By day 15, traces of radioactivity were detectable all across the northern hemisphere. Within one month, radioactive particles were noted by CTBTO stations in the southern hemisphere.[139][140]

Estimates of radioactivity released ranged from 10–40%[141][142][143][144] of that of Chernobyl. The significantly contaminated area was 10[141]-12%[142] of that of Chernobyl.[141][145][146]

In March 2011, Japanese officials announced that "radioactive iodine-131 exceeding safety limits for infants had been detected at 18 water-purification plants in Tokyo and five other prefectures".[147] On 21 March, the first restrictions were placed on the distribution and consumption of contaminated items.[148] As of July 2011, the Japanese government was unable to control the spread of radioactive material into the nation's food supply. Radioactive material was detected in food produced in 2011, including spinach, tea leaves, milk, fish and beef, up to 320 kilometres from the plant. 2012 crops did not show signs of radioactivity contamination. Cabbage, rice[149] and beef showed insignificant levels of radioactivity. A Fukushima-produced rice market in Tokyo was accepted by consumers as safe.[149]

On 24 August 2011, the Nuclear Safety Commission (NSC) of Japan published the results of the recalculation of the total amount of radioactive materials released into the air during the accident at the Fukushima Daiichi Nuclear Power Station. The total amounts released between 11 March and 5 April were revised downwards to 130 PBq (petabecquerels, 3.5 megacuries) for iodine-131 and 11 PBq for caesium-137, which is about 11% of Chernobyl emissions. Earlier estimations were 150 PBq and 12 PBq.[150][151]

In 2011, scientists working for the Japan Atomic Energy Agency, Kyoto University and other institutes, recalculated the amount of radioactive material released into the ocean: between late March through April they found a total of 15 PBq for the combined amount of iodine-131 and caesium-137, more than triple the 4.72 PBq estimated by TEPCO. The company had calculated only the direct releases into the sea. The new calculations incorporated the portion of airborne radioactive substances that entered the ocean as rain.[152]

In the first half of September 2011, TEPCO estimated the radioactivity release at some 200 MBq (megabecquerels, 5.4 millicuries) per hour. This was approximately one four-millionth that of March.[153] Traces of iodine-131 were detected in several Japanese prefectures in November[154] and December 2011.[155]

According to the French Institute for Radiological Protection and Nuclear Safety, between 21 March and mid-July around 27 PBq of caesium-137 entered the ocean, about 82 percent before 8 April. This emission represents the most important individual oceanic emissions of artificial radioactivity ever observed. The Fukushima coast has one of the world's strongest currents (Kuroshio Current). It transported the contaminated waters far into the Pacific Ocean, dispersing the radioactivity. As of late 2011 measurements of both the seawater and the coastal sediments suggested that the consequences for marine life would be minor. Significant pollution along the coast near the plant might persist, because of the continuing arrival of radioactive material transported to the sea by surface water crossing contaminated soil. The possible presence of other radioactive substances, such as strontium-90 or plutonium, has not been sufficiently studied. Recent measurements show persistent contamination of some marine species (mostly fish) caught along the Fukushima coast.[156] Migratory pelagic species are highly effective and rapid transporters of radioactivity throughout the ocean. Elevated levels of caesium-134 appeared in migratory species off the coast of California that were not seen pre-Fukushima.[157]

As of March 2012, no cases of radiation-related ailments had been reported. Experts cautioned that data was insufficient to allow conclusions on health impacts. Michiaki Kai, professor of radiation protection at Oita University of Nursing and Health Sciences, stated, "If the current radiation dose estimates are correct, (cancer-related deaths) likely won't increase."[158]

In May 2012, TEPCO released their estimate of cumulative radioactivity releases. An estimated 538.1 PBq of iodine-131, caesium-134 and caesium-137 was released. 520 PBq was released into the atmosphere between 12–31 March 2011 and 18.1 PBq into the ocean from 26 March – 30 September 2011. A total of 511 PBq of iodine-131 was released into both the atmosphere and the ocean, 13.5 PBq of caesium-134 and 13.6 PBq of caesium-137.[159] TEPCO reported that at least 900 PBq had been released "into the atmosphere in March last year [2011] alone".[160][161]

In 2012 researchers from the Institute of Problems in the Safe Development of Nuclear Energy, Russian Academy of Sciences, and the Hydrometeorological Center of Russia concluded that "on March 15, 2011, ~400PBq iodine, ~100PBq cesium, and ~400PBq inert gases entered the atmosphere" on that day alone.[162]

In August 2012, researchers found that 10,000 nearby residents had been exposed to less than 1 millisievert of radiation, significantly less than Chernobyl residents.[163]

As of October 2012, radioactivity was still leaking into the ocean. Fishing in the waters around the site was still prohibited, and the levels of radioactive 134Cs and 137Cs in the fish caught were not lower than immediately after the disaster.[164]

On 26 October 2012, TEPCO admitted that it could not stop radioactive material entering the ocean, although emission rates had stabilized. Undetected leaks could not be ruled out, because the reactor basements remained flooded. The company was building a 2,400-foot-long steel and concrete wall between the site and the ocean, reaching 100 feet below ground, but it would not be finished before mid-2014. Around August 2012 two greenling were caught close to shore. They contained more than 25,000 becquerels (0.67 millicuries) of caesium-137 per kilogram, the highest measured since the disaster and 250 times the government's safety limit.[165][166]

On 22 July 2013, it was revealed by TEPCO that the plant continued to leak radioactive water into the Pacific Ocean, something long suspected by local fishermen and independent investigators.[167] TEPCO had previously denied that this was happening. Japanese Prime Minister Shinzō Abe ordered the government to step in.[168]

On 20 August, in a further incident, it was announced that 300 metric tons of heavily contaminated water had leaked from a storage tank,[169] approximately the same amount of water as one eighth (1/8) of that found in an Olympic-size swimming pool.[170] The 300 metric tons of water was radioactive enough to be hazardous to nearby staff, and the leak was assessed as Level 3 on the International Nuclear Event Scale.[171]

On 26 August, the government took charge of emergency measures to prevent further radioactive water leaks, reflecting their lack of confidence in TEPCO.[172]

As of 2013, about 400 metric tons per day of cooling water was being pumped into the reactors. Another 400 metric tons of groundwater was seeping into the structure. Some 800 metric tons of water per day was removed for treatment, half of which was reused for cooling and half diverted to storage tanks.[173] Ultimately the contaminated water, after treatment to remove radionuclides other than tritium, may have to be dumped into the Pacific.[19] TEPCO intend to create an underground ice wall to reduce the rate contaminated groundwater reaches the sea.[174]

In February 2014, NHK reported that TEPCO was reviewing its radioactivity data, after finding much higher levels of radioactivity than was reported earlier. TEPCO now says that levels of 5 million becquerels (0.12 millicuries) of strontium per liter were detected in groundwater collected in July 2013 and not 900,000 becquerels (0.02 millicuries), as initially reported.[175][176][177]

On 10 September 2015, floodwaters driven by Typhoon Etau prompted mass evacuations in Japan and overwhelmed the drainage pumps at the stricken Fukushima nuclear plant. A TEPCO spokesperson said that hundreds of metric tons of radioactive water had entered the ocean as a result.[178] Plastic bags filled with contaminated soil and grass were also swept away by the flood waters.[179]

Contamination in the eastern Pacific

In March 2014, numerous news sources, including NBC,[180] began predicting that the radioactive underwater plume traveling through the Pacific Ocean would reach the western seaboard of the continental United States. The common story was that the amount of radioactivity would be harmless and temporary once it arrived. The National Oceanic and Atmospheric Administration measured cesium-134 at points in the Pacific Ocean and models were cited in predictions by several government agencies to announce that the radiation would not be a health hazard for North American residents. Groups, including Beyond Nuclear and the Tillamook Estuaries Partnership, challenged these predictions on the basis of continued isotope releases after 2011, leading to a demand for more recent and comprehensive measurements as the radioactivity made its way east. These measurements were taken by a cooperative group of organizations under the guidance of a marine chemist with the Woods Hole Oceanographic Institution, and it was revealed that total radiation levels, of which only a fraction bore the fingerprint of Fukushima, were not high enough to pose any direct risk to human life and in fact were far less than Environmental Protection Agency guidelines or several other sources of radiation exposure deemed safe.[181] Integrated Fukushima Ocean Radionuclide Monitoring project (InFORM) also failed to show any significant amount of radiation[182] and as a result authors received death threats from supporters of a Fukushima-induced "wave of cancer deaths across North America" theory.[183]

Response

<templatestyles src="Module:Hatnote/styles.css"></templatestyles>

Government agencies and TEPCO were unprepared for the "cascading nuclear disaster".[184] The tsunami that "began the nuclear disaster could and should have been anticipated and that ambiguity about the roles of public and private institutions in such a crisis was a factor in the poor response at Fukushima".[184] In March 2012, Prime Minister Yoshihiko Noda said that the government shared the blame for the Fukushima disaster, saying that officials had been blinded by a false belief in the country's "technological infallibility", and were taken in by a "safety myth". Noda said "Everybody must share the pain of responsibility."[185]

According to Naoto Kan, Japan's prime minister during the tsunami, the country was unprepared for the disaster, and nuclear power plants should not have been built so close to the ocean.[186] Kan acknowledged flaws in authorities' handling of the crisis, including poor communication and coordination between nuclear regulators, utility officials and the government. He said the disaster "laid bare a host of an even bigger man-made vulnerabilities in Japan's nuclear industry and regulation, from inadequate safety guidelines to crisis management, all of which he said need to be overhauled."[186]

Physicist and environmentalist Amory Lovins said that Japan's "rigid bureaucratic structures, reluctance to send bad news upwards, need to save face, weak development of policy alternatives, eagerness to preserve nuclear power's public acceptance, and politically fragile government, along with TEPCO's very hierarchical management culture, also contributed to the way the accident unfolded. Moreover, the information Japanese people receive about nuclear energy and its alternatives has long been tightly controlled by both TEPCO and the government."[187]

Poor communication and delays

The Japanese government did not keep records of key meetings during the crisis.[188] Data from the SPEEDI network were emailed to the prefectural government, but not shared with others. Emails from NISA to Fukushima, covering 12 March 11:54 PM to 16 March 9 AM and holding vital information for evacuation and health advisories, went unread and were deleted. The data was not used because the disaster countermeasure office regarded the data as "useless because the predicted amount of released radiation is unrealistic."[189] On 14 March 2011 TEPCO officials were instructed not to use the phrase "core meltdown" at press conferences.[190]

On the evening of March 15, Prime Minister Kan called Seiki Soramoto, who used to design nuclear plants for Toshiba, to ask for his help in managing the escalating crisis. Soramoto formed an impromptu advisory group, which included his former professor at the University of Tokyo, Toshiso Kosako, a top Japanese expert on radiation measurement. Mr. Kosako, who studied the Soviet response to the Chernobyl crisis, said he was stunned at how little the leaders in the prime minister’s office knew about the resources available to them. He quickly advised the chief cabinet secretary, Yukio Edano, to use SPEEDI, which used measurements of radioactive releases, as well as weather and topographical data, to predict where radioactive materials could travel after being released into the atmosphere.[191]

The Investigation Committee on the Accident at the Fukushima Nuclear Power Stations of Tokyo Electric Power Company's interim report stated that Japan's response was flawed by "poor communication and delays in releasing data on dangerous radiation leaks at the facility". The report blamed Japan's central government as well as TEPCO, "depicting a scene of harried officials incapable of making decisions to stem radiation leaks as the situation at the coastal plant worsened in the days and weeks following the disaster".[192] The report said poor planning worsened the disaster response, noting that authorities had "grossly underestimated tsunami risks" that followed the magnitude 9.0 earthquake. The 12.1 metre (40 ft) high tsunami that struck the plant was double the height of the highest wave predicted by officials. The erroneous assumption that the plant's cooling system would function after the tsunami worsened the disaster. "Plant workers had no clear instructions on how to respond to such a disaster, causing miscommunication, especially when the disaster destroyed backup generators."[192]

In February 2012, the Rebuild Japan Initiative Foundation described how Japan's response was hindered by a loss of trust between the major actors: Prime Minister Kan, TEPCO's Tokyo headquarters and the plant manager. The report said that these conflicts "produced confused flows of sometimes contradictory information".[193][194] According to the report, Kan delayed the cooling of the reactors by questioning the choice of seawater instead of fresh water, accusing him of micromanaging response efforts and appointing a small, closed, decision-making staff. The report stated that the Japanese government was slow to accept assistance from U.S. nuclear experts.[195]

A 2012 report in The Economist said: "The operating company was poorly regulated and did not know what was going on. The operators made mistakes. The representatives of the safety inspectorate fled. Some of the equipment failed. The establishment repeatedly played down the risks and suppressed information about the movement of the radioactive plume, so some people were evacuated from more lightly to more heavily contaminated places."[196]

From 17 to 19 March 2011, US military aircraft measured radiation within a 45-km radius of the site. The data recorded 125 microsieverts per hour of radiation as far as 25 km (15.5 mi) northwest of the plant. The US provided detailed maps to the Japanese Ministry of Economy, Trade, and Industry (METI) on 18 March and to the Ministry of Education, Culture, Sports, Science and Technology (MEXT) two days later, but officials did not act on the information.[197]

The data were not forwarded to the prime minister's office or the Nuclear Safety Commission (NSC), nor were they used to direct the evacuation. Because a substantial portion of radioactive materials reached ground to the northwest, residents evacuated in this direction were unnecessarily exposed to radiation. According to NSC chief Tetsuya Yamamoto, "It was very regrettable that we didn't share and utilize the information." Itaru Watanabe, from the Science and Technology Policy Bureau, blamed the US for not releasing the data.[198]

Data on the dispersal of radioactive materials were provided to the U.S. forces by the Japanese Ministry for Science a few days after March 11; however, the data was not shared publicly until the Americans published their map on March 23, at which point Japan published fallout maps compiled from ground measurements and SPEEDI the same day.[199] According to Watanabe's testimony before the Diet, the US military was given access to the data "to seek support from them" on how to deal with the nuclear disaster. Although SPEEDI's effectiveness was limited by not knowing the amounts released in the disaster, and thus was considered "unreliable", it was still able to forecast dispersal routes and could have been used to help local governments designate more appropriate evacuation routes.[200]

On 19 June 2012, science minister Hirofumi Hirano stated that his "job was only to measure radiation levels on land" and that the government would study whether disclosure could have helped in the evacuation efforts.[199]

On 28 June 2012 Nuclear and Industrial Safety Agency officials apologized to mayor Yuko Endo of Kawauchi Village for NISA having failed to release the American-produced radiation maps in the first days after the meltdowns. All residents of this village were evacuated after the government designated it a no-entry zone. According to a Japanese government panel, authorities had shown no respect for the lives and dignity of village people. One NISA official apologized for the failure and added that the panel had stressed the importance of disclosure; however, the mayor said that the information would have prevented the evacuation into highly polluted areas, and that apologies a year too late had no meaning.[201]

In June 2016, it was revealed that TEPCO officials had been instructed on 14 March 2011 not to describe the reactor damage using the word "meltdown". Officials at that time were aware that 25–55% of the fuel had been damaged, and the threshold for which the term "meltdown" became appropriate (5%) had been greatly exceeded. TEPCO President Naomi Hirose told the media: "I would say it was a cover-up... It’s extremely regrettable.”[202]

Event rating

<templatestyles src="Module:Hatnote/styles.css"></templatestyles>

Comparison of radiation levels for different nuclear events

The incident was rated 7 on the International Nuclear Event Scale (INES).[203] This scale runs from 0, indicating an abnormal situation with no safety consequences, to 7, indicating an accident causing widespread contamination with serious health and environmental effects. Prior to Fukushima, the Chernobyl disaster was the only level 7 event on record, while the Three Mile Island accident was rated as level 5.

A 2012 analysis of the intermediate and long-lived radioactivity released found about 10–20% of that released from the Chernobyl disaster.[204][205] Approximately 15 PBq of caesium-137 was released,[206] compared with approximately 85 PBq of caesium-137 at Chernobyl,[207] indicating the release of 26.5 kilograms (58 lb) of caesium-137.

Unlike Chernobyl, all Japanese reactors were in concrete containment vessels, which limited the release of strontium-90, americium-241 and plutonium, which were among the radioisotopes released by the earlier incident.[204][207]

Some 500 PBq of iodine-131 were released,[206] compared to approximately 1,760 PBq at Chernobyl.[207] Iodine-131 has a half life of 8.02 days, decaying into a stable nuclide. After ten half lives (80.2 days), 99.9% has decayed to xenon-131, a stable isotope.[208]

Aftermath

<templatestyles src="Module:Hatnote/styles.css"></templatestyles>

No deaths followed short term radiation exposure,[209] though there were a number of deaths in the evacuation of the nearby population,[210] while 15,884 died (as of 10 February 2014[211]) due to the earthquake and tsunami.

Risks from radiation

Very few cancers would be expected as a result of accumulated radiation exposures,[212][213][214] even though people in the area worst affected by Japan's Fukushima nuclear accident have a slightly higher risk of developing certain cancers such as leukemia, solid cancers, thyroid cancer and breast cancer.[215][216]

Estimated effective doses from the accident outside Japan are considered to be below (or far below) the dose levels regarded as very small by the international radiological protection community.[217][182]

In 2013, WHO reported that area residents who were evacuated were exposed to so little radiation that radiation induced health impacts were likely to be below detectable levels.[218][219] The health risks were calculated by applying conservative assumptions, including the conservative linear no-threshold model of radiation exposure, a model that assumes even the smallest amount of radiation exposure will cause a negative health effect.[220][221] The report indicated that for those infants in the most affected areas, lifetime cancer risk would increase by about 1%.[219][222] It predicted that populations in the most contaminated areas faced a 70% higher relative risk of developing thyroid cancer for females exposed as infants, and a 7% higher relative risk of leukemia in males exposed as infants and a 6% higher relative risk of breast cancer in females exposed as infants.[37] One-third of involved emergency workers would have increased cancer risks.[37][223] Cancer risks for fetuses were similar to those in 1 year old infants.[38] The estimated cancer risk to children and adults was lower than infants.[224]

<templatestyles src="Template:Blockquote/styles.css" />

These percentages represent estimated relative increases over the baseline rates and are not absolute risks for developing such cancers. Due to the low baseline rates of thyroid cancer, even a large relative increase represents a small absolute increase in risks. For example, the baseline lifetime risk of thyroid cancer for females is just three-quarters of one percent and the additional lifetime risk estimated in this assessment for a female infant exposed in the most affected location is one-half of one percent.

— Lua error in package.lua at line 80: module 'strict' not found.

According to a linear no-threshold model (LNT model), the accident would most likely cause 130 cancer deaths.[12][13] However, radiation epidemiologist Roy Shore countered that estimating health effects from the LNT model "is not wise because of the uncertainties"[225] Darshak Sanghavi noted that to obtain reliable evidence of the effect of low-level radiation would require an impractically large number of patients, Luckey reported that the body's own repair mechanisms can cope with small doses of radiation[226] and Aurengo stated that “The LNT model cannot be used to estimate the effect of very low doses…”[227]

In April 2014, studies confirmed the presence of radioactive tuna off the coasts of the pacific U.S.[228] Researchers carried out tests on 26 albacore tuna caught prior to the 2011 power plant disaster and those caught after. However, the amount of radioactivity is less than that found naturally in a single banana.[229][230]

As of June 2016, dispersed nuclear fallout and associated radiation contamination continue to pollute the environment. Tilman Ruff, a professor at the University of Melbourne, stated that every day 300 tons of contaminated water leak from the crippled nuclear plant.[231] The Reconstruction Agency states that 174,000 people have been unable to return to their homes. Ecological diversity has decreased and malformations have been found in trees, birds, and mammals.[231]

Thyroid screening program

The World Health Organization stated that a 2013 thyroid ultrasound screening program was, due to the screening effect, likely to lead to an increase in recorded thyroid cases due to early detection of non-symptomatic disease cases.[232] The overwhelming majority of thyroid growths are benign growths that will never cause symptoms, illness or death, even if nothing is ever done about the growth. Autopsy studies on people who died from other causes show that more than one third of adults technically have a thyroid growth/cancer.[233] As a precedent, in 1999 in South Korea, the introduction of advanced ultrasound thyroid examinations resulted in an explosion in the rate of benign thyroid cancers being detected and needless surgeries occurring.[234] Despite this, the death rate from thyroid cancer has remained the same.[234]

According to the Tenth Report of the Fukushima Prefecture Health Management Survey released in February 2013, more than 40% of children screened around Fukushima prefecture were diagnosed with thyroid nodules or cysts. Ultrasonographic detectable thyroid nodules and cysts are extremely common and can be found at a frequency of up to 67% in various studies.[235] 186 (0.5%) of these had nodules larger than 5.1 mm and/or cysts larger than 20.1 mm and underwent further investigation, while none had thyroid cancer. A Russia Today report into the matter was highly misleading.[236] Fukushima Medical University give the number of children diagnosed with thyroid cancer, as of December 2013, as 33 and concluded "it is unlikely that these cancers were caused by the exposure from I-131 from the nuclear power plant accident in March 2011".[237]

In October 2015, 137 children from the Fukushima Prefecture were described as either being diagnosed with or showing signs of developing thyroid cancer. The study's lead author Toshihide Tsuda from Okayama University stated that the increased detection could not be accounted for by attributing it to the screening effect. He described the screening results to be "20 times to 50 times what would be normally expected."[40] By the end of 2015, the number had increased to 166 children.[238]

However, despite his paper being widely reported by the media,[234] an undermining error, according to teams of other epidemiologists who point out Tsuda's remarks are fatally wrong, is that Tsuda did an apples and oranges comparison by comparing the Fukushima surveys, which uses advanced ultrasound devices that detect otherwise unnoticeable thyroid growths, with data from traditional non-advanced clinical examinations, to arrive at his "20 to 50 times what would be expected" conclusion. In the critical words of epidemiologist Richard Wakeford, “It is inappropriate to compare the data from the Fukushima screening program with cancer registry data from the rest of Japan where there is, in general, no such large-scale screening,”. Wakeford's criticism was one of seven other author's letters that were published criticizing Tsuda's paper.[234] According to Takamura, another epidemiologist, who examined the results of small scale advanced ultrasound tests on Japanese children not near Fukushima, "The prevalence of thyroid cancer [using the same detection technology] does not differ meaningfully from that in Fukushima Prefecture,”.[234]

Thyroid cancer is one of the most survivable cancers, with an approximate 94% survival rate after first diagnosis. That rate increases to a nearly 100% survival rate if caught early.[239]

Chernobyl comparison

<templatestyles src="Module:Hatnote/styles.css"></templatestyles>

Radiation deaths at Chernobyl were also statistically undetectable. Only 0.1% of the 110,645 Ukraninian cleanup workers, included in a 20-year study out of over 500,000 former Soviet clean up workers, had as of 2012 developed leukemia, although not all cases resulted from the accident.[240][241]

Data from Chernobyl showed that there was a steady then sharp increase in thyroid cancer rates following the disaster in 1986, but whether this data can be directly compared to Fukushima is yet to be determined.[41][42]

Chernobyl thyroid cancer incidence rates did not begin to increase above the prior baseline value of about 0.7 cases per 100,000 people per year until 1989 to 1991, 3–5 years after the incident in both adolescent and child age groups.[41][42] The rate reached its highest point so far, of about 11 cases per 100,000 in the decade of the 2000s, approximately 14 years after the accident.[41] From 1989 to 2005, an excess of 4,000 children and adolescent cases of thyroid cancer were observed. Nine of these had died as of 2005, a 99% survival rate.[242]

Effects on evacuees

In the former Soviet Union, many patients with negligible radioactive exposure after the Chernobyl disaster displayed extreme anxiety about radiation exposure. They developed many psychosomatic problems, including radiophobia along with an increase in fatalistic alcoholism. As Japanese health and radiation specialist Shunichi Yamashita noted:[243]

<templatestyles src="Template:Blockquote/styles.css" />

We know from Chernobyl that the psychological consequences are enormous. Life expectancy of the evacuees dropped from 65 to 58 years – not because of cancer, but because of depression, alcoholism and suicide. Relocation is not easy, the stress is very big. We must not only track those problems, but also treat them. Otherwise people will feel they are just guinea pigs in our research.[243]

A survey by the Iitate local government obtained responses from approximately 1,743 evacuees within the evacuation zone. The survey showed that many residents are experiencing growing frustration, instability and an inability to return to their earlier lives. Sixty percent of respondents stated that their health and the health of their families had deteriorated after evacuating, while 39.9% reported feeling more irritated compared to before the disaster.[244]

Summarizing all responses to questions related to evacuees' current family status, one-third of all surveyed families live apart from their children, while 50.1% live away from other family members (including elderly parents) with whom they lived before the disaster. The survey also showed that 34.7% of the evacuees have suffered salary cuts of 50% or more since the outbreak of the nuclear disaster. A total of 36.8% reported a lack of sleep, while 17.9% reported smoking or drinking more than before they evacuated.[244]

Stress often manifests in physical ailments, including behavioral changes such as poor dietary choices, lack of exercise and sleep deprivation. Survivors, including some who lost homes, villages and family members, were found likely to face mental health and physical challenges. Much of the stress came from lack of information and from relocation.[245]

A survey computed that of some 300,000 evacuees, approximately 1,600 deaths related to the evacuation conditions, such as living in temporary housing and hospital closures that had occurred as of August 2013, a number comparable to the 1,599 deaths directly caused by the earthquake and tsunami in the Prefecture. The exact causes of these evacuation related deaths were not specified, because according to the municipalities, that would hinder relatives applying for compensation.[17][246]

Radioactivity releases

In June 2011, TEPCO stated the amount of contaminated water in the complex had increased due to substantial rainfall.[247] On 13 February 2014, TEPCO reported 37,000 becquerels (1.0 microcurie) of cesium-134 and 93,000 becquerels (2.5 microcuries) of cesium-137 were detected per liter of groundwater sampled from a monitoring well.[248]

Insurance

According to reinsurer Munich Re, the private insurance industry will not be significantly affected by the disaster.[249] Swiss Re similarly stated, "Coverage for nuclear facilities in Japan excludes earthquake shock, fire following earthquake and tsunami, for both physical damage and liability. Swiss Re believes that the incident at the Fukushima nuclear power plant is unlikely to result in a significant direct loss for the property & casualty insurance industry."[250][not in citation given]

Compensation

The amount of compensation to be paid by TEPCO is expected to reach 7 trillion yen.[251]

Costs to Japanese taxpayers are likely to exceed 12 trillion yen ($100 billion).[252] In December 2016 the government estimated decontamination, compensation, decommissioning and radioactive waste storage costs at 21.5 trillion yen ($187 billion), nearly double the 2013 estimate.[253]

In March 2017, a Japanese court ruled that negligence by the Japanese government had led to the Fukushima disaster by failing to use its regulatory powers to force TEPCO to take preventive measures. The Maebashi district court near Tokyo awarded ¥39 million (US$345,000) to 137 people who were forced to flee their homes following the accident.[254]

Energy policy implications

The number of nuclear power plant constructions started each year worldwide, from 1954 to 2013. Following an increase in new constructions from 2007 to 2010, there was a decline after the Fukushima nuclear disaster.
Electricity generation by source in Japan (month-level data). Nuclear energy's contribution declined steadily throughout 2011 due to shutdowns and has been mainly replaced with thermal power stations such as fossil gas and coal power plants.
Part of the Seto Hill Windfarm in Japan, one of several windfarms that continued generating without interruption after the 2011 earthquake and tsunami and the Fukushima nuclear disaster
Price of PV modules (yen/Wp) in Japan
Anti-nuclear power plant rally on 19 September 2011 at the Meiji Shrine complex in Tokyo

By March 2012, one year after the disaster, all but two of Japan's nuclear reactors had been shut down; some had been damaged by the quake and tsunami. Authority to restart the others after scheduled maintenance throughout the year was given to local governments, who in all cases decided against. According to The Japan Times, the disaster changed the national debate over energy policy almost overnight. "By shattering the government's long-pitched safety myth about nuclear power, the crisis dramatically raised public awareness about energy use and sparked strong anti-nuclear sentiment". An energy white paper, approved by the Japanese Cabinet in October 2011, says "public confidence in safety of nuclear power was greatly damaged" by the disaster and called for a reduction in the nation's reliance on nuclear power. It also omitted a section on nuclear power expansion that was in the previous year's policy review.[255]

Michael Banach, the current Vatican representative to the IAEA, told a conference in Vienna in September 2011 that the disaster created new concerns about the safety of nuclear plants globally. Auxiliary Bishop of Osaka Michael Goro Matsuura said this incident should cause Japan and other countries to abandon nuclear projects. He called on the worldwide Christian community to support this anti-nuclear campaign. Statements from Bishops' conferences in Korea and the Philippines called on their governments to abandon atomic power. Author Kenzaburō Ōe, who received a Nobel prize in literature, urged Japan to abandon its reactors.[256]

The nuclear plant closest to the epicenter of the earthquake, the Onagawa Nuclear Power Plant, successfully withstood the cataclysm. According to Reuters it may serve as a "T card" for the nuclear lobby, providing evidence that it is possible for a correctly designed and operated nuclear facility to withstand such a cataclysm.[257]

The loss of 30% of the country's generating capacity led to much greater reliance on liquified natural gas and coal.[258] Unusual conservation measures were undertaken. In the immediate aftermath, nine prefectures served by TEPCO experienced power rationing.[259] The government asked major companies to reduce power consumption by 15%, and some shifted their weekends to weekdays to smooth power demand.[260] Converting to a nuclear-free gas and oil energy economy would cost tens of billions of dollars in annual fees. One estimate is that even including the disaster, more lives would have been lost if Japan had used coal or gas plants instead of nuclear.[12]

Many political activists have begun calling for a phase-out of nuclear power in Japan, including Amory Lovins, who claimed, "Japan is poor in fuels, but is the richest of all major industrial countries in renewable energy that can meet the entire long-term energy needs of an energy-efficient Japan, at lower cost and risk than current plans. Japanese industry can do it faster than anyone — if Japanese policymakers acknowledge and allow it".[187] Benjamin K. Sovacool asserted that Japan could have exploited instead its renewable energy base. Japan has a total of "324 GW of achievable potential in the form of onshore and offshore wind turbines (222 GW), geothermal power plants (70  GW), additional hydroelectric capacity (26.5 GW), solar energy (4.8 GW) and agricultural residue (1.1 GW)."[261]

In contrast, others have said that the zero mortality rate from the Fukushima incident confirms their opinion that nuclear fission is the only viable option available to replace fossil fuels. Journalist George Monbiot wrote "Why Fukushima made me stop worrying and love nuclear power." In it he said, "As a result of the disaster at Fukushima, I am no longer nuclear-neutral. I now support the technology."[262][263] He continued, "A crappy old plant with inadequate safety features was hit by a monster earthquake and a vast tsunami. The electricity supply failed, knocking out the cooling system. The reactors began to explode and melt down. The disaster exposed a familiar legacy of poor design and corner-cutting. Yet, as far as we know, no one has yet received a lethal dose of radiation."[264][265]

In September 2011, Mycle Schneider said that the disaster can be understood as a unique chance "to get it right" on energy policy. "Germany – with its nuclear phase-out decision based on a renewable energy program – and Japan – having suffered a painful shock but possessing unique technical capacities and societal discipline – can be at the forefront of an authentic paradigm shift toward a truly sustainable, low-carbon and nuclear-free energy policy."[266]

On the other hand, climate and energy scientists James Hansen, Ken Caldeira, Kerry Emanuel and Tom Wigley released an open letter calling on world leaders to support development of safer nuclear power systems, stating "There is no credible path to climate stabilization that does not include a substantial role for nuclear power." [267] In December 2014, an open letter from 75 climate and energy scientists concluding "nuclear power has lowest impact on wildlife and ecosystems — which is what we need given the dire state of the world’s biodiversity."[268]

As of September 2011, Japan planned to build a pilot offshore floating wind farm, with six 2 MW turbines, off the Fukushima coast.[269] The first became operational in November 2013.[270] After the evaluation phase is complete in 2016, "Japan plans to build as many as 80 floating wind turbines off Fukushima by 2020."[269] In 2012, Prime Minister Kan said the disaster made it clear to him that "Japan needs to dramatically reduce its dependence on nuclear power, which supplied 30% of its electricity before the crisis, and has turned him into a believer of renewable energy".[citation needed] Sales of solar panels in Japan rose 30.7% to 1,296 MW in 2011, helped by a government scheme to promote renewable energy. Canadian Solar received financing for its plans to build a factory in Japan with capacity of 150 MW, scheduled to begin production in 2014.[271]

As of September 2012, the Los Angeles Times reported that "Prime Minister Yoshihiko Noda acknowledged that the vast majority of Japanese support the zero option on nuclear power",[272] and Prime Minister Noda and the Japanese government announced plans to make the country nuclear-free by the 2030s. They announced the end to construction of nuclear power plants and a 40-year limit on existing nuclear plants. Nuclear plant restarts must meet safety standards of the new independent regulatory authority. The plan requires investing $500 billion over 20 years.[273]

On 16 December 2012, Japan held its general election. The Liberal Democratic Party (LDP) had a clear victory, with Shinzō Abe as the new Prime Minister. Abe supported nuclear power, saying that leaving the plants closed was costing the country 4 trillion yen per year in higher costs.[274] The comment came after Junichiro Koizumi, who chose Abe to succeed him as premier, made a recent statement to urge the government to take a stance against using nuclear power.[275] A survey on local mayors by the Yomiuri Shimbun newspaper in January 2013 found that most of them from cities hosting nuclear plants would agree to restarting the reactors, provided the government could guarantee their safety.[276] More than 30,000 people marched on 2 June 2013, in Tokyo against restarting nuclear power plants. Marchers had gathered more than 8 million petition signatures opposing nuclear power.[277]

In October 2013, it was reported that TEPCO and eight other Japanese power companies were paying approximately 3.6 trillion yen (37 billion dollars) more in combined imported fossil fuel costs compared to 2010, before the accident, to make up for the missing power.[278]

Equipment, facility and operational changes

As the crisis unfolded, the Japanese government sent a request for robots developed by the U.S. military. The robots went into the plants and took pictures to help assess the situation, but they couldn't perform the full range of tasks usually carried out by human workers.[279] The Fukushima disaster illustrated that robots lacked sufficient dexterity and robustness to perform critical tasks. In response to this shortcoming, a series of competitions were hosted by DARPA to accelerate the development of humanoid robots that could supplement relief efforts.[280][281] Eventually a wide variety of specially designed robots were employed (leading to a robotics boom in the region),[282] but as of early 2016 three of them had promptly become non-functional due to the intensity of the radioactivity; one was destroyed within a day. [283]

A number of nuclear reactor safety system lessons emerged from the incident. The most obvious was that in tsunami-prone areas, a power station's sea wall must be adequately tall and robust.[6] At the Onagawa Nuclear Power Plant, closer to the epicenter of 11 March earthquake and tsunami,[284] the sea wall was 14 meters tall and successfully withstood the tsunami, preventing serious damage and radioactivity releases.[285][286]

Nuclear power station operators around the world began to install Passive Auto-catalytic hydrogen Recombiners ("PARs"), which do not require electricity to operate.[287][288][289] PARs work much like the catalytic converter on the exhaust of a car to turn potentially explosive gases such as hydrogen into water. Had such devices been positioned at the top of Fukushima I's reactor and containment buildings, where hydrogen gas collected, the explosions would not have occurred and the releases of radioactive isotopes would arguably have been much less.[27]

Unpowered filtering systems on containment building vent lines, known as Filtered Containment Venting Systems (FCVS), can safely catch radioactive materials and thereby allow reactor core de-pressurization, with steam and hydrogen venting with minimal radioactivity emissions.[27][290] Filtration using an external water tank system is the most common established system in European countries, with the water tank positioned outside the containment building.[291] In October 2013, the owners of Kashiwazaki-Kariwa nuclear power station began installing wet filters and other safety systems, with completion anticipated in 2014.[292][293]

For generation II reactors located in flood or tsunami prone areas, a 3+ day supply of back-up batteries has become an informal industry standard.[294][295] Another change is to harden the location of back-up diesel generator rooms with water-tight, blast-resistant doors and heat sinks, similar to those used by nuclear submarines.[27] The oldest operating nuclear power station in the world, Beznau, which has been operating since 1969, has a 'Notstand' hardened building designed to support all of its systems independently for 72 hours in the event of an earthquake or severe flooding. This system was built prior to Fukushima Daiichi.[296][297]

Upon a station blackout, similar to the one that occurred after Fukushima's back-up battery supply was exhausted,[298] many that had constructed Generation III reactors adopt the principle of passive nuclear safety. They take advantage of convection (hot water tends to rise) and gravity (water tends to fall) to ensure an adequate supply of cooling water to handle the decay heat, without the use of pumps.[299][300]

Reactions

Japan

<templatestyles src="Module:Hatnote/styles.css"></templatestyles>

Japan towns, villages, and cities in and around the Daiichi nuclear plant exclusion zone. The 20 km and 30 km areas had evacuation and shelter in place orders, and additional administrative districts that had an evacuation order are highlighted. However, the above map's factual accuracy is called into question as only the southern portion of Kawamata district had evacuation orders. More accurate maps are available.[301][302]

Japanese authorities later admitted to lax standards and poor oversight.[303] They took fire for their handling of the emergency and engaged in a pattern of withholding and denying damaging information.[303][304][305][306] Authorities allegedly[dubious ] wanted to "limit the size of costly and disruptive evacuations in land-scarce Japan and to avoid public questioning of the politically powerful nuclear industry". Public anger emerged over an "official campaign[citation needed][not in citation given] to play down the scope of the accident and the potential health risks".[305][306][307]

In many cases, the Japanese government's reaction was judged to be less than adequate by many in Japan, especially those who were living in the region. Decontamination equipment was slow to be made available and then slow to be utilized. As late as June 2011, even rainfall continued to cause fear and uncertainty in eastern Japan because of its possibility of washing radioactivity from the sky back to earth.[citation needed]

To assuage fears, the government enacted an order to decontaminate over a hundred areas with a level contamination greater than or equivalent to one millisievert[clarification needed] of radiation. This is a much lower threshold than is necessary for protecting health. The government also sought to address the lack of education on the effects of radiation and the extent to which the average person was exposed.[308]

Previously a proponent of building more reactors, Kan took an increasingly anti-nuclear stance following the disaster. In May 2011, he ordered the aging Hamaoka Nuclear Power Plant closed over earthquake and tsunami concerns, and said he would freeze building plans. In July 2011, Kan said, "Japan should reduce and eventually eliminate its dependence on nuclear energy".[309] In October 2013, he said that if the worst-case scenario had been realized, 50 million people within a 250-kilometer radius would have had to evacuate.[310]

On 22 August 2011, a government spokesman mentioned the possibility that some areas around the plant "could stay for some decades a forbidden zone". According to Yomiuri Shimbun the Japanese government was planning to buy some properties from civilians to store waste and materials that had become radioactive after the accidents.[311][312] Chiaki Takahashi, Japan's foreign minister, criticized foreign media reports as excessive. He added that he could "understand the concerns of foreign countries over recent developments at the nuclear plant, including the radioactive contamination of seawater".[313]

Due to frustration with TEPCO and the Japanese government "providing differing, confusing, and at times contradictory, information on critical health issues"[314] a citizen's group called "Safecast" recorded detailed radiation level data in Japan.[315][316] The Japanese government "does not consider nongovernment readings to be authentic". The group uses off-the-shelf Geiger counter equipment. A simple Geiger counter is a contamination meter and not a dose rate meter. The response differs too much between different radioisotopes to permit a simple GM tube for dose rate measurements when more than one radioisotope is present. A thin metal shield is needed around a GM tube to provide energy compensation to enable it to be used for dose rate measurements. For gamma emitters either an ionization chamber, a gamma spectrometer or an energy compensated GM tube are required. Members of the Air Monitoring station facility at the Department of Nuclear Engineering at the University of Berkeley, California have tested many environmental samples in Northern California.[317]

In 2014 Japan enacted the State Secrecy Law. The Fukushima incident falls under this law, and as a "state secret" independent investigations and reports are forbidden by law.[318][319]

International

<templatestyles src="Module:Hatnote/styles.css"></templatestyles>

Evacuation flight departs Misawa.
U.S. Navy humanitarian flight undergoes radioactive decontamination.

The international reaction to the disaster was diverse and widespread. Many inter-governmental agencies immediately offered help, often on an ad hoc basis. Responders included IAEA, World Meteorological Organization and the Preparatory Commission for the Comprehensive Nuclear Test Ban Treaty Organization.[320]

In May 2011, UK chief inspector of nuclear installations Mike Weightman traveled to Japan as the lead of an International Atomic Energy Agency (IAEA) expert mission. The main finding of this mission, as reported to the IAEA ministerial conference that month, was that risks associated with tsunamis in several sites in Japan had been underestimated.[321]

In September 2011, IAEA Director General Yukiya Amano said the Japanese nuclear disaster "caused deep public anxiety throughout the world and damaged confidence in nuclear power".[322][323] Following the disaster, it was reported in the The Economist that the IAEA halved its estimate of additional nuclear generating capacity to be built by 2035.[324]

In the aftermath, Germany accelerated plans to close its nuclear power reactors and decided to phase the rest out by 2022.[325] Italy held a national referendum, in which 94 percent voted against the government's plan to build new nuclear power plants.[326] In France, President Hollande announced the intention of the government to reduce nuclear usage by one third. So far, however, the government has only earmarked one power station for closure – the aging plant at Fessenheim on the German border – which prompted some to question the government's commitment to Hollande's promise. Industry Minister Arnaud Montebourg is on record as saying that Fessenheim will be the only nuclear power station to close.

On a visit to China in December 2014 he reassured his audience that nuclear energy was a "sector of the future" and would continue to contribute "at least 50%" of France's electricity output.[327]

Another member of Hollande's Socialist Party, the MP Christian Bataille, says the plan to curb nuclear was hatched as a way of securing the backing of his Green coalition partners in parliament.[328]

Nuclear power plans were not abandoned in Malaysia, the Philippines, Kuwait and Bahrain, or radically changed, as in Taiwan. China suspended its nuclear development program briefly, but restarted it shortly afterwards. The initial plan had been to increase the nuclear contribution from 2 to 4 percent of electricity by 2020, with an escalating program after that. Renewable energy supplies 17 percent of China’s electricity, 16% of which is hydroelectricity. China plans to triple its nuclear energy output to 2020, and triple it again between 2020 and 2030.[329]

New nuclear projects were proceeding in some countries. KPMG reports 653 new nuclear facilities planned or proposed for completion by 2030.[330] By 2050, China hopes to have 400–500 gigawatts of nuclear capacity – 100 times more than it has now.[331] The Conservative Government of the United Kingdom is planning a major nuclear expansion despite widespread public objection.[citation needed] So is Russia.[citation needed] India are also pressing ahead with a large nuclear program, as is South Korea.[332] Indian Vice President M Hamid Ansari said in 2012 that "nuclear energy is the only option" for expanding India's energy supplies,[333] and Prime Minister Modi announced in 2014 that India intended to build 10 more nuclear reactors in a collaboration with Russia.[334]

Investigations

Three investigations into the Fukushima disaster showed the man-made nature of the catastrophe and its roots in regulatory capture associated with a "network of corruption, collusion, and nepotism."[335][336] Regulatory capture refers to the "situation where regulators charged with promoting the public interest defer to the wishes and advance the agenda of the industry or sector they ostensibly regulate." Those with a vested interest in specific policy or regulatory outcomes lobby regulators and influence their choices and actions. Regulatory capture explains why some of the risks of operating nuclear power reactors in Japan were systematically downplayed and mismanaged so as to compromise operational safety.[336]

Many reports say that the government shares blame with the regulatory agency for not heeding warnings and for not ensuring the independence of the oversight function.[337] The New York Times said that the Japanese nuclear regulatory system sided with and promoted the nuclear industry because of amakudari ('descent from heaven') in which senior regulators accepted high paying jobs at companies they once oversaw. To protect their potential future position in the industry, regulators sought to avoid taking positions that upset or embarrass the companies. TEPCO's position as the largest electrical utility in Japan made it the most desirable position for retiring regulators. Typically the "most senior officials went to work at TEPCO, while those of lower ranks ended up at smaller utilities."[338]

In August 2011, several top energy officials were fired by the Japanese government; affected positions included the Vice-minister for Economy, Trade and Industry; the head of the Nuclear and Industrial Safety Agency, and the head of the Agency for Natural Resources and Energy.[339]

In 2016 three former TEPCO executives, chairman Tsunehisa Katsumata and two vice presidents, were indicted for negligence resulting in death and injury.[210][340]

NAIIC

<templatestyles src="Module:Hatnote/styles.css"></templatestyles>

The Fukushima Nuclear Accident Independent Investigation Commission (NAIIC) was the first independent investigation commission by the National Diet in the 66-year history of Japan's constitutional government.

Fukushima "cannot be regarded as a natural disaster," the NAIIC panel's chairman, Tokyo University professor emeritus Kiyoshi Kurokawa, wrote in the inquiry report. "It was a profoundly man-made disaster – that could and should have been foreseen and prevented. And its effects could have been mitigated by a more effective human response."[341] "Governments, regulatory authorities and Tokyo Electric Power [TEPCO] lacked a sense of responsibility to protect people's lives and society," the Commission said. "They effectively betrayed the nation's right to be safe from nuclear accidents.[342]

The Commission recognized that the affected residents were still struggling and facing grave concerns, including the "health effects of radiation exposure, displacement, the dissolution of families, disruption of their lives and lifestyles and the contamination of vast areas of the environment".

Investigation Committee

<templatestyles src="Module:Hatnote/styles.css"></templatestyles>

The purpose of the Investigation Committee on the Accident at the Fukushima Nuclear Power Stations (ICANPS) was to identify the disaster's causes and propose policies designed to minimize the damage and prevent the recurrence of similar incidents.[343] The 10 member, government-appointed panel included scholars, journalists, lawyers and engineers.[344][345] It was supported by public prosecutors and government experts.[346] and released its final, 448-page[347] investigation report on 23 July 2012.[44][348]

The panel's report faulted an inadequate legal system for nuclear crisis management, a crisis-command disarray caused by the government and TEPCO, and possible excess meddling on the part of the Prime Minister's office in the crisis' early stage.[349] The panel concluded that a culture of complacency about nuclear safety and poor crisis management led to the nuclear disaster.[344]

See also

<templatestyles src="Div col/styles.css"/>

References

Notes

  1. 1.0 1.1 Lua error in package.lua at line 80: module 'strict' not found.
  2. Lua error in package.lua at line 80: module 'strict' not found.
  3. Lua error in package.lua at line 80: module 'strict' not found.
  4. 4.0 4.1 4.2 Lua error in package.lua at line 80: module 'strict' not found.
  5. Lua error in package.lua at line 80: module 'strict' not found.
  6. 6.0 6.1 6.2 6.3 Phillip Lipscy, Kenji Kushida, and Trevor Incerti. 2013. "The Fukushima Disaster and Japan’s Nuclear Plant Vulnerability in Comparative Perspective." Environmental Science and Technology 47 (May), 6082–6088.
  7. 7.0 7.1 Lua error in package.lua at line 80: module 'strict' not found.
  8. 8.0 8.1 Lua error in package.lua at line 80: module 'strict' not found.
  9. 9.0 9.1 Lua error in package.lua at line 80: module 'strict' not found.
  10. 10.0 10.1 Lua error in package.lua at line 80: module 'strict' not found.
  11. "Analysis: A month on, Japan nuclear crisis still scarring" Archived 15 August 2012 at the Wayback Machine International Business Times (Australia). 9 April 2011, retrieved 12 April 2011
  12. 12.0 12.1 12.2 Lua error in package.lua at line 80: module 'strict' not found.
  13. 13.0 13.1 Lua error in package.lua at line 80: module 'strict' not found.
  14. Predictions on the contamination levels from various fission products released from the accident and updates on the risk assessment for solid and thyroid cancers. Science of The Total EnvironmentVolumes 500–501, 1 December 2014, Pages 155–172 doi:10.1016/j.scitotenv.2014.08.102
  15. UNIS/OUS/237 2 April 2014 Increase in Cancer Unlikely following Fukushima Exposure – says UN Report Low Risk of Thyroid Cancer Among Children Most Exposed
  16. Fukushima disaster predicted to raise cancer rates slightly, 5 March 2013, Ned Stafford
  17. 17.0 17.1 17.2 Lua error in package.lua at line 80: module 'strict' not found.
  18. 18.0 18.1 Lua error in package.lua at line 80: module 'strict' not found.
  19. 19.0 19.1 19.2 Lua error in package.lua at line 80: module 'strict' not found.
  20. 20.0 20.1 Lua error in package.lua at line 80: module 'strict' not found.
  21. 21.0 21.1 Lua error in package.lua at line 80: module 'strict' not found.
  22. Lua error in package.lua at line 80: module 'strict' not found.
  23. Lua error in package.lua at line 80: module 'strict' not found.
  24. Lua error in package.lua at line 80: module 'strict' not found.
  25. 25.0 25.1 IAEA press release Japanese Earthquake Update (19 March 2011, 4:30 UTC) 19 March 2011. Archive.org
  26. Lua error in package.lua at line 80: module 'strict' not found. Note: See picture in the upper left corner of page 2.
  27. 27.0 27.1 27.2 27.3 24 Hours at Fukushima A blow-by-blow account of the worst nuclear accident since Chernobyl By Eliza Strickland Posted 31 Oct 2011 Archived 14 November 2013 at the Wayback Machine
  28. 28.0 28.1 Lua error in package.lua at line 80: module 'strict' not found.
  29. Lua error in package.lua at line 80: module 'strict' not found.
  30. Hydrogen explosions Fukushima nuclear plant: what happened?
  31. Lua error in package.lua at line 80: module 'strict' not found.
  32. page 6
  33. http://eetd-seminars.lbl.gov/sites/eetd-seminars.lbl.gov/files/Fukushima1_Technical_Perspective_LBL_EEDT_04052011-1.pdf What happened at Fukushima a Technical Perspective. Nuclear Regulatory Commission page 11, 26, 29.
  34. Lua error in package.lua at line 80: module 'strict' not found.
  35. Lua error in package.lua at line 80: module 'strict' not found.
  36. WHO report, page 92.
  37. 37.0 37.1 37.2 37.3 Walsh, Bryan. (2013-03-01) WHO Report Says That Fukushima Nuclear Accident Posed Minimal Risk to Health | TIME.com. Science.time.com. Retrieved on 2013-09-06. Archived 4 November 2013 at the Wayback Machine
  38. 38.0 38.1 WHO 2013, pp. 70, 79–80.
  39. Lua error in package.lua at line 80: module 'strict' not found.
  40. 40.0 40.1 Lua error in package.lua at line 80: module 'strict' not found.
  41. 41.0 41.1 41.2 41.3 Lua error in package.lua at line 80: module 'strict' not found.
  42. 42.0 42.1 42.2 Lua error in package.lua at line 80: module 'strict' not found.
  43. Lua error in package.lua at line 80: module 'strict' not found.
  44. 44.0 44.1 Lua error in package.lua at line 80: module 'strict' not found.
  45. [1]
  46. Lua error in package.lua at line 80: module 'strict' not found.
  47. 47.0 47.1 47.2 Lua error in package.lua at line 80: module 'strict' not found.
  48. 48.0 48.1 Lua error in package.lua at line 80: module 'strict' not found.
  49. 49.0 49.1 Lua error in package.lua at line 80: module 'strict' not found.
  50. Lua error in package.lua at line 80: module 'strict' not found.
  51. Martin, Alex, "Lowdown on nuclear crisis and potential scenarios", Japan Times, 20 March 2011, p. 3.[dead link]
  52. Lua error in package.lua at line 80: module 'strict' not found.
  53. Lua error in package.lua at line 80: module 'strict' not found.
  54. Lua error in package.lua at line 80: module 'strict' not found.
  55. 55.0 55.1 Lua error in package.lua at line 80: module 'strict' not found.
  56. Lua error in package.lua at line 80: module 'strict' not found.
  57. DOE fundamentals handbook – Decay heat, Nuclear physics and reactor theory at the Wayback Machine (archived 16 March 2011), Vol. 2, module 4, p. 61.
  58. Lua error in package.lua at line 80: module 'strict' not found.[dead link]
  59. Lua error in package.lua at line 80: module 'strict' not found.
  60. Pre-construction safety report – Sub-chapter 9.2 – Water Systems. AREVA NP / EDF, published 2009-06-29, Retrieved 23 March 2011.
  61. Lua error in package.lua at line 80: module 'strict' not found.
  62. https://www.nfb.ca/film/meltdown_doc
  63. Higgins, Andrew, "disorder intensified Japan's crisis", The Washington Post, 19 April 2011, Retrieved 21 April 2011.[dead link]
  64. Lua error in package.lua at line 80: module 'strict' not found.
  65. Lua error in package.lua at line 80: module 'strict' not found.
  66. 66.0 66.1 Lua error in package.lua at line 80: module 'strict' not found.
  67. 67.0 67.1 67.2 67.3 Lua error in package.lua at line 80: module 'strict' not found.
  68. Yoshida, Reiji, "GE plan followed with inflexibility", Japan Times, 14 July 2011, p. 1. Archived 13 July 2011 at WebCite
  69. Arita, Eriko, "Disaster analysis you may not hear elsewhere Archived 29 August 2011 at the Wayback Machine", Japan Times, 20 March 2011, p. 12.
  70. Agence France-Presse/Jiji Press, "Tsunami that knocked out nuke plant cooling systems topped 14 meters", Japan Times, 23 March 2011, p. 2.
  71. Lua error in package.lua at line 80: module 'strict' not found.
  72. "Plant Status of Fukushima Daini Nuclear Power Station (as of 0 AM 12 March )", TEPCO, end of day 11 April. Archived 15 February 2014 at the Wayback Machine
  73. Fukushima No. 1 plant designed on 'trial-and-error' basis, Asahi Shimbun, 7 April 2011. Archived 13 April 2011 at WebCite
  74. Lua error in package.lua at line 80: module 'strict' not found.
  75. Lua error in package.lua at line 80: module 'strict' not found.
  76. B. Cox, JOURNAL OF NUCLEAR MATERIALS, PELLET CLAD INTERACTION (PCI) FAILURES OF ZIRCONIUM ALLOY FUEL CLADDING – A REVIEW, 1990, volume 172, pages 249–292
  77. "An introduction to serious nuclear accident chemistry", M.R.StJ. Foreman, Cogent Chemistry 2015, 1(1), retrieved 13 Feb 2016
  78. The Mainichi Shimbun (28 28 February 2012)TEPCO ordered to report on change in piping layout at Fukushima plant[dead link]
  79. NHK-world (29 December 2011) Fukushima plant's backup generator failed in 1991.
    JAIF (30 December 2011)Earthquake report 304:Fukushima plant's backup generator failed in 1991.
    The Mainichi Daily News (30 December 2011) TEPCO neglected anti-flood measures at Fukushima plant despite knowing risk.[dead link]
  80. Lua error in package.lua at line 80: module 'strict' not found.
  81. Lua error in package.lua at line 80: module 'strict' not found.
  82. Lua error in package.lua at line 80: module 'strict' not found.
  83. Lua error in package.lua at line 80: module 'strict' not found.
  84. Lua error in package.lua at line 80: module 'strict' not found.
  85. Lua error in package.lua at line 80: module 'strict' not found.
  86. 86.0 86.1 Lua error in package.lua at line 80: module 'strict' not found.
  87. Associated Press, "How the first 24 hours shaped Fukushima nuclear crisis", Japan Times, 7 July 2011, p. 3. Archived 7 July 2011 at WebCite
  88. 88.0 88.1 88.2 Lua error in package.lua at line 80: module 'strict' not found.
  89. 89.0 89.1 TEPCO tardy on N-plant emergency: National: Daily Yomiuri Online (The Daily Yomiuri). Yomiuri.co.jp (12 April 2011). Retrieved 30 April 2011. Archived 13 April 2011 at WebCite
  90. Lua error in package.lua at line 80: module 'strict' not found.
  91. Japan Meteorological Agency|Tsunami Warnings/Advisories, Tsunami Information. Jma.go.jp. Retrieved 30 April 2011. Archived 18 April 2011 at WebCite
  92. Bloomberg, "Tepco revises tsunami's height to 15 meters", 10 April 2011, Archived 29 December 2013 at the Wayback Machine
  93. 93.0 93.1 David Sanger and Matthew Wald, Radioactive releases in Japan could last months, experts say. The New York Times 13 March 2011 Archived 25 September 2012 at the Wayback Machine
  94. Lua error in package.lua at line 80: module 'strict' not found.;
  95. Bloomberg L.P., "Time not on workers' side as crisis raced on", Japan Times, 5 May 2011, p. 3. Archived 6 May 2011 at WebCite
  96. Lua error in package.lua at line 80: module 'strict' not found.
  97. Lua error in package.lua at line 80: module 'strict' not found.
  98. Lua error in package.lua at line 80: module 'strict' not found.
  99. Lua error in package.lua at line 80: module 'strict' not found.
  100. AP, "IAEA: 170,000 Evacuated near Japan nuclear plant," March 12, 2011. https://news.yahoo.com/iaea-170-000-evacuated-near-japan-nuclear-plant-20110312-133929-901.html accessed Feb. 23, 2016.
  101. Lua error in package.lua at line 80: module 'strict' not found.
  102. Lua error in package.lua at line 80: module 'strict' not found.
  103. Lua error in package.lua at line 80: module 'strict' not found.
  104. Lua error in package.lua at line 80: module 'strict' not found.
  105. Lua error in package.lua at line 80: module 'strict' not found.
  106. Lua error in package.lua at line 80: module 'strict' not found.
  107. Takahashi, Hideki, and Shinya Kokubun, "Workers grappled with darkness at start of Fukushima nuclear crisis", Japan Times, 3 September 2014, p. 3
  108. Takahashi, Hideki, Shinya Kokubun, and Yukiko Maeda, "Response stymied by loss of electricity", Japan Times, 3 September 2014, p. 3
  109. Takahashi, Hideki, and Hisashi Ota, "Fukushima workers tried to save reactor 1 through venting", Japan Times, 3 September 2014, p. 3
  110. 110.0 110.1 Uncertainties abound in Fukushima decommissioning. Phys.org. 19 Nov 2013. Archived 14 March 2014 at the Wayback Machine
  111. Fukushima Timeline scientificamerican.com Archived 6 March 2014 at the Wayback Machine
  112. 112.0 112.1 Most of fuel NOT remaining in reactor1 core / Tepco "but molten fuel is stopped in the concrete base" Fukushima-Diary.com Archived 25 March 2014 at the Wayback Machine
  113. 113.0 113.1 Lua error in package.lua at line 80: module 'strict' not found.
  114. 114.0 114.1 Lua error in package.lua at line 80: module 'strict' not found.
  115. 115.0 115.1 Lua error in package.lua at line 80: module 'strict' not found.
  116. 116.0 116.1 The Evaluation Status of Reactor Core Damage at Fukushima Daiichi Nuclear Power Station Units 1 to 3 30 November 2011 Tokyo Electric Power Company
  117. Report on the Investigation and Study of Unconfirmed/Unclear Matters in the Fukushima Nuclear Accident – Progress Report No.2 – 6 August 2014 Tokyo Electric Power Company, Inc.
  118. TEPCO to start "scanning" inside of Reactor 1 in early February by using muon – Fukushima Diary
  119. Muon Scans Begin At Fukushima Daiichi – SimplyInfo
  120. Muon Scan Finds No Fuel In Fukushima Unit 1 Reactor Vessel – SimplyInfo
  121. IRID saw no fuel or water remaining in reactor core of Reactor 1 – Fukushima Diary
  122. Lua error in package.lua at line 80: module 'strict' not found.
  123. Lua error in package.lua at line 80: module 'strict' not found.
  124. Lua error in package.lua at line 80: module 'strict' not found.
  125. Lua error in package.lua at line 80: module 'strict' not found.
  126. Lua error in package.lua at line 80: module 'strict' not found.
  127. Lua error in package.lua at line 80: module 'strict' not found.
  128. http://edition.cnn.com/2011/WORLD/asiapcf/03/15/japan.nuclear.reactors/?hpt=T1
  129. https://web.archive.org/web/20110523050825/http://www.nisa.meti.go.jp/english/files/en20110322-1-1.pdf NISA news release
  130. Lua error in package.lua at line 80: module 'strict' not found.
  131. Lua error in package.lua at line 80: module 'strict' not found.
  132. Lua error in package.lua at line 80: module 'strict' not found.
  133. Fukushima radioactive fallout nears Chernobyl levels – 24 March 2011. New Scientist. Retrieved 30 April 2011. Archived 25 March 2011 at WebCite
  134. Report: Emissions from Japan plant approach Chernobyl levels, USA Today, 24 March 2011 Archived 18 August 2013 at the Wayback Machine
  135. Doughton, Sandi. (5 April 2011) Local News|Universities come through in monitoring for radiation|Seattle Times Newspaper. Seattletimes.nwsource.com. Retrieved 30 April 2011. Archived 21 September 2011 at the Wayback Machine
  136. Lua error in package.lua at line 80: module 'strict' not found.
  137. Lua error in package.lua at line 80: module 'strict' not found.
  138. Lua error in package.lua at line 80: module 'strict' not found.
  139. Lua error in package.lua at line 80: module 'strict' not found.
  140. 141.0 141.1 141.2 Lua error in package.lua at line 80: module 'strict' not found.
  141. 142.0 142.1 No-Man's Land Attests to Japan's Nuclear Nightmare. ABC News, 27. December 2011. Archived 28 December 2011 at the Wayback Machine
  142. Lua error in package.lua at line 80: module 'strict' not found.
  143. Lua error in package.lua at line 80: module 'strict' not found.
  144. Kyodo News, "Radioactivity Dispersal Distance From Fukushima 1/10th Of Chernobyl's", 13 March 2012, (wire service report), "The data showed, for example, more than 1.48 million becquerels (40 microcuries) of radioactive caesium per square meter was detected in soil at a location some 250 kilometers away from the Chernobyl plant. In the case of the Fukushima Daiichi plant, the distance was much smaller at about 33 km, the officials said."
  145. Hongo, Jun, "Fukushima soil fallout far short of Chernobyl", Japan Times, 15 March 2012, p. 1. Archived 16 March 2012 at the Wayback Machine
  146. Lua error in package.lua at line 80: module 'strict' not found.
  147. Lua error in package.lua at line 80: module 'strict' not found.
  148. 149.0 149.1 Lua error in package.lua at line 80: module 'strict' not found.
  149. JAIF (5 September 2011) NSC Recalculates Total Amount of Radioactive Materials Released Archived 20 December 2011 at WebCite
  150. INES (the International Nuclear and Radiological Event Scale) Rating on the Events in Fukushima Dai-ichi Nuclear Power Station by the Tohoku District – off the Pacific Ocean Earthquake. NISA/METI, 12 April 2011, archived from Original.
  151. JAIF (9 September 2011) Radioactive release into sea estimated triple Archived 11 December 2011 at WebCite
  152. JAIF 20 September 2011 Earthquake-report 211: A new plan set to reduce radiation emissions
  153. Possibility of recriticality again, Fukushima Diary Archived 24 December 2013 at the Wayback Machine
  154. Increasing leakage of Iodine-131, Fukushima Diary Archived 24 December 2013 at the Wayback Machine
  155. Lua error in package.lua at line 80: module 'strict' not found.
  156. Lua error in package.lua at line 80: module 'strict' not found.
  157. Aoki, Mizuho, "Tohoku fears nuke crisis evacuees gone for good", Japan Times, 8 March 2012, p. 1. Archived 7 March 2012 at the Wayback Machine
  158. Lua error in package.lua at line 80: module 'strict' not found.
  159. Lua error in package.lua at line 80: module 'strict' not found.
  160. Lua error in package.lua at line 80: module 'strict' not found.
  161. Estimation of radionuclide emission during the 15 March 2011 accident at the fukushima-1 npp (japan)", R. V. Arutyunyan, L. A. Bolshov, D. A. Pripachkin, V. N. Semyonov, O. S. Sorokovikova, A. L. Fokin, K. G. Rubinstein, R. Yu. Ignatov, M. M. Smirnova, Atomnaya Énergiya, Vol. 112, No. 3, pp. 159–163, March, 2012, as reported in Atomic Energy, July 2012, Volume 112, Issue 3, pp 188-193s
  162. Boytchev, Hristio, "First study reports very low internal radioactivity after Fukushima disaster", Washington Post, 15 August 2012
  163. Lua error in package.lua at line 80: module 'strict' not found.
  164. Lua error in package.lua at line 80: module 'strict' not found.
  165. (Dutch) Nu.nl (26 oktober 2012) Tepco sluit niet uit dat centrale Fukushima nog lekt Archived 8 January 2014 at the Wayback Machine
  166. Fukushima Plant Admits Radioactive Water Leaked To Sea. Huffingtonpost.com. Retrieved on 2013-09-06. Archived 17 April 2014 at the Wayback Machine
  167. Adelman, Jacob. (2013-08-07) Abe Pledges Government Help to Stem Fukushima Water Leaks. Bloomberg. Retrieved on 2013-09-06. Archived 2 December 2013 at the Wayback Machine
  168. Lua error in package.lua at line 80: module 'strict' not found.
  169. SI Units: Volume
  170. Lua error in package.lua at line 80: module 'strict' not found.
  171. Lua error in package.lua at line 80: module 'strict' not found.
  172. Lua error in package.lua at line 80: module 'strict' not found.
  173. Lua error in package.lua at line 80: module 'strict' not found.
  174. Lua error in package.lua at line 80: module 'strict' not found.
  175. Lua error in package.lua at line 80: module 'strict' not found.
  176. Lua error in package.lua at line 80: module 'strict' not found.
  177. Lua error in package.lua at line 80: module 'strict' not found.
  178. Lua error in package.lua at line 80: module 'strict' not found.
  179. Fukushima's radioactive ocean plume due to reach US waters in 2014 – NBC News Archived 26 March 2014 at the Wayback Machine
  180. Lua error in package.lua at line 80: module 'strict' not found.
  181. 182.0 182.1 Lua error in package.lua at line 80: module 'strict' not found.
  182. Lua error in package.lua at line 80: module 'strict' not found.
  183. 184.0 184.1 Lua error in package.lua at line 80: module 'strict' not found.
  184. Lua error in package.lua at line 80: module 'strict' not found.
  185. 186.0 186.1 Lua error in package.lua at line 80: module 'strict' not found.
  186. 187.0 187.1 Lua error in package.lua at line 80: module 'strict' not found.
  187. Lua error in package.lua at line 80: module 'strict' not found.
  188. Lua error in package.lua at line 80: module 'strict' not found.
  189. Lua error in package.lua at line 80: module 'strict' not found.
  190. Lua error in package.lua at line 80: module 'strict' not found.
  191. 192.0 192.1 Lua error in package.lua at line 80: module 'strict' not found.
  192. Lua error in package.lua at line 80: module 'strict' not found.
  193. Lua error in package.lua at line 80: module 'strict' not found.
  194. Lua error in package.lua at line 80: module 'strict' not found.
  195. Lua error in package.lua at line 80: module 'strict' not found.
  196. Lua error in package.lua at line 80: module 'strict' not found.
  197. Lua error in package.lua at line 80: module 'strict' not found.
  198. 199.0 199.1 Lua error in package.lua at line 80: module 'strict' not found.[dead link]
  199. The Japan Times (17 January 2012) U.S. forces given SPEEDI data early
  200. JIAF (29 June 2012)Earthequake-report 455: NISA “sorry” for withholding US radiation maps
  201. Lua error in package.lua at line 80: module 'strict' not found.
  202. Lua error in package.lua at line 80: module 'strict' not found.
  203. 204.0 204.1 Directly comparing Fukushima to Chernobyl : Nature News Blog. Blogs.nature.com (2013-01-31). Retrieved on 2013-02-13. Archived 28 October 2013 at the Wayback Machine
  204. Lua error in package.lua at line 80: module 'strict' not found.
  205. 206.0 206.1 Press Release | The Estimated Amount of Radioactive Materials Released into the Air and the Ocean Caused by Fukushima Daiichi Nuclear Power Station Accident Due to the Tohoku-Chihou-Taiheiyou-Oki Earthquake (As of May 2012). TEPCO. Retrieved on 2013-02-13. Archived 15 February 2014 at the Wayback Machine
  206. 207.0 207.1 207.2 Chapter II The release, dispersion and deposition of radionuclides – Chernobyl: Assessment of Radiological and Health Impact. Oecd-nea.org. Retrieved on 2013-02-13. Archived 20 April 2011 at WebCite
  207. Isotopic ratio of radioactive iodine (129I/131I) released from Fukushima Daiichi NPP accident
  208. Lua error in package.lua at line 80: module 'strict' not found.
  209. 210.0 210.1 Lua error in package.lua at line 80: module 'strict' not found.
  210. Lua error in package.lua at line 80: module 'strict' not found. Archived 31 October 2013 at the Wayback Machine
  211. Lua error in package.lua at line 80: module 'strict' not found.
  212. Lua error in package.lua at line 80: module 'strict' not found.
  213. Lua error in package.lua at line 80: module 'strict' not found.
  214. Lua error in package.lua at line 80: module 'strict' not found.
  215. Lua error in package.lua at line 80: module 'strict' not found.
  216. WHO 2013, p. 42.
  217. WHO 2013, p. 92.
  218. 219.0 219.1 Lua error in package.lua at line 80: module 'strict' not found.
  219. Frequently asked questions on the Fukushima health risk assessment, questions 3 & 4 Archived 13 February 2014 at the Wayback Machine
  220. WHO 2013, p. 83.
  221. Lua error in package.lua at line 80: module 'strict' not found.
  222. Lua error in package.lua at line 80: module 'strict' not found.
  223. WHO 2013, p. 13.
  224. Lua error in package.lua at line 80: module 'strict' not found.
  225. Lua error in package.lua at line 80: module 'strict' not found.
  226. Lua error in package.lua at line 80: module 'strict' not found.
  227. Lua error in package.lua at line 80: module 'strict' not found.
  228. Lua error in package.lua at line 80: module 'strict' not found.
  229. Lua error in package.lua at line 80: module 'strict' not found.
  230. 231.0 231.1 Tilman Ruff. Fukushima: The Misery Piles up, Pursuit magazine, University of Melbourne, 2016.
  231. WHO 2013, p. 87-88.
  232. Lua error in package.lua at line 80: module 'strict' not found.
  233. 234.0 234.1 234.2 234.3 234.4 Screening effect? Examining thyroid cancers found in Fukushima children. Jonathan Kellogg PhD, 2016
  234. Lua error in package.lua at line 80: module 'strict' not found.
  235. Lua error in package.lua at line 80: module 'strict' not found.
  236. http://www.fmu.ac.jp/radiationhealth/workshop201402/presentation/Co-Chairs_Summary_E.pdf
  237. Lua error in package.lua at line 80: module 'strict' not found.
  238. cancer.org Thyroid Cancer By the American Cancer Society. In turn citing: AJCC Cancer Staging Manual (7th ed). Archived 18 October 2013 at the Wayback Machine
  239. Lua error in package.lua at line 80: module 'strict' not found.
  240. Lua error in package.lua at line 80: module 'strict' not found.
  241. Lua error in package.lua at line 80: module 'strict' not found.
  242. 243.0 243.1 Studying the Fukushima Aftermath: 'People Are Suffering from Radiophobia' – SPIEGEL ONLINE. Spiegel.de (2011-08-19). Retrieved on 2013-09-06. Archived 16 January 2014 at the Wayback Machine
  243. 244.0 244.1 Lua error in package.lua at line 80: module 'strict' not found.
  244. Lua error in package.lua at line 80: module 'strict' not found.
  245. Lua error in package.lua at line 80: module 'strict' not found.
  246. Lua error in package.lua at line 80: module 'strict' not found.
  247. Lua error in package.lua at line 80: module 'strict' not found.
  248. Lua error in package.lua at line 80: module 'strict' not found.
  249. Swiss Re provides estimate of its claims costs from Japan earthquake and tsunami, Swiss Re, news release, 21 March 2011
  250. Lua error in package.lua at line 80: module 'strict' not found.
  251. Lua error in package.lua at line 80: module 'strict' not found.
  252. Lua error in package.lua at line 80: module 'strict' not found.
  253. Lua error in package.lua at line 80: module 'strict' not found.
  254. Lua error in package.lua at line 80: module 'strict' not found.
  255. Lua error in package.lua at line 80: module 'strict' not found.
  256. Japanese nuclear plant survived tsunami, offers clues. Reuters. Retrieved on 2013-09-06. Archived 25 October 2011 at the Wayback Machine
  257. Lua error in package.lua at line 80: module 'strict' not found.
  258. Lua error in package.lua at line 80: module 'strict' not found.
  259. Yuri Kageyama, dealing with power shortage. Associated Press, 22 May 2011[dead link]
  260. Benjamin K. Sovacool (2011). Contesting the Future of Nuclear Power: A Critical Global Assessment of Atomic Energy, World Scientific, p. 287.
  261. Lua error in package.lua at line 80: module 'strict' not found.
  262. Lua error in package.lua at line 80: module 'strict' not found.
  263. Lua error in package.lua at line 80: module 'strict' not found.
  264. Lua error in package.lua at line 80: module 'strict' not found.
  265. Lua error in package.lua at line 80: module 'strict' not found.
  266. Lua error in package.lua at line 80: module 'strict' not found.
  267. Lua error in package.lua at line 80: module 'strict' not found.
  268. 269.0 269.1 Lua error in package.lua at line 80: module 'strict' not found.
  269. Elaine Kurtenbach. "Japan starts up offshore wind farm near Fukushima" The Sydney Morning Herald, 12 November 2013. Accessed: 11 November 2013. Archived 30 December 2013 at the Wayback Machine
  270. Lua error in package.lua at line 80: module 'strict' not found.
  271. Lua error in package.lua at line 80: module 'strict' not found.
  272. Lua error in package.lua at line 80: module 'strict' not found.
  273. Lua error in package.lua at line 80: module 'strict' not found.
  274. Lua error in package.lua at line 80: module 'strict' not found.
  275. Lua error in package.lua at line 80: module 'strict' not found.
  276. Lua error in package.lua at line 80: module 'strict' not found.
  277. Lua error in package.lua at line 80: module 'strict' not found.
  278. "Disaster response robots", Open Minds blog, featuring BBC Documentary Archived 22 February 2014 at the Wayback Machine
  279. Lua error in package.lua at line 80: module 'strict' not found.
  280. Lua error in package.lua at line 80: module 'strict' not found.
  281. Lua error in package.lua at line 80: module 'strict' not found.
  282. Lua error in package.lua at line 80: module 'strict' not found.
  283. Lua error in package.lua at line 80: module 'strict' not found.
  284. IAEA Expert Team Concludes Mission to Onagawa NPP Archived 29 October 2013 at the Wayback Machine
  285. Japanese nuclear plant ‘remarkably undamaged’ in earthquake – UN atomic agency. Archived 29 October 2013 at the Wayback Machine
  286. Hydrogen fix for Japanese reactors Archived 14 February 2014 at the Wayback Machine
  287. Hydrogen recombiners at all 20 NPC plants to avoid Fukushima. Sanjay Jog | Mumbai 7 April 2011 Last Updated at 00:29 IST Archived 29 October 2013 at the Wayback Machine
  288. CFD analysis of passive autocatalytic recombiner interaction with atmosphere. Archive Kerntechnik – Issue 2011/02. Archived 29 October 2013 at the Wayback Machine
  289. Lua error in package.lua at line 80: module 'strict' not found.
  290. Lua error in package.lua at line 80: module 'strict' not found.
  291. Lua error in package.lua at line 80: module 'strict' not found.
  292. Lua error in package.lua at line 80: module 'strict' not found.
  293. Nuclear power plant operator in China orders backup batteries for installation at plants 7 September 2012 Archived 29 October 2013 at the Wayback Machine
  294. China’s Guangdong Nuclear Power Corp Announces Orders for BYD Battery Back-up for Nuclear Plants Archived 29 October 2013 at the Wayback Machine
  295. Lua error in package.lua at line 80: module 'strict' not found.Archived 14 October 2013 at the Wayback Machine[not in citation given]
  296. Lua error in package.lua at line 80: module 'strict' not found.
  297. Lua error in package.lua at line 80: module 'strict' not found.
  298. Lua error in package.lua at line 80: module 'strict' not found.
  299. Lua error in package.lua at line 80: module 'strict' not found.
  300. Lua error in package.lua at line 80: module 'strict' not found.
  301. Lua error in package.lua at line 80: module 'strict' not found.
  302. 303.0 303.1 Lua error in package.lua at line 80: module 'strict' not found.
  303. Brasor, Philip, "Public wary of official optimism", Japan Times, 11 March 2012, p. 11. Archived 3 January 2013 at the Wayback Machine
  304. 305.0 305.1 Lua error in package.lua at line 80: module 'strict' not found.
  305. 306.0 306.1 Lua error in package.lua at line 80: module 'strict' not found.
  306. "Analysis: A month on, Japan nuclear crisis still scarring," Archived 18 April 2011 at WebCite International Business Times (Australia). 9 April 2011, retrieved 12 April 2011; excerpt, According to James Acton, Associate of the Nuclear Policy Program at the Carnegie Endowment for International Peace, "Fukushima is not the worst nuclear accident ever but it is the most complicated and the most dramatic ... This was a crisis that played out in real time on TV. Chernobyl did not."
  307. Lua error in package.lua at line 80: module 'strict' not found.
  308. Lua error in package.lua at line 80: module 'strict' not found.
  309. Lua error in package.lua at line 80: module 'strict' not found.
  310. (dutch)Nu.nl (22 August 2011)Area around Fukushima maybe a forbidden zone for decades to come Archived 23 October 2013 at the Wayback Machine
  311. The Guardian (22 August 2011)residents may never return to radiation-hit homes Archived 23 August 2011 at the Wayback Machine
  312. Earthquake Report – JAIF, No. 45: 20:00, 7 April. JAIF / NHK, 7 April 2011, archived from original on 9 April 2011, Retrieved 9 April 2011.
  313. Al-Jazeera English: Citizen group tracks down Japan's radiation (10 August 2011) Archived 31 August 2011 at the Wayback Machine
  314. Safecast Organization Official Blog Archived 15 April 2014 at the Wayback Machine
  315. Lua error in package.lua at line 80: module 'strict' not found.
  316. UC Berkeley Nuclear Engineering Air Monitoring Station | The Nuclear Engineering Department at UC Berkely web site Archived 1 April 2011 at WebCite
  317. Lua error in package.lua at line 80: module 'strict' not found.
  318. Lua error in package.lua at line 80: module 'strict' not found.
  319. Lua error in package.lua at line 80: module 'strict' not found.
  320. Lua error in package.lua at line 80: module 'strict' not found.
  321. Lua error in package.lua at line 80: module 'strict' not found.
  322. Nucléaire : une trentaine de réacteurs dans le monde risquent d'être fermés Les Échos, published 12 April 2011, accessed 15 April 2011
  323. Lua error in package.lua at line 80: module 'strict' not found.
  324. Lua error in package.lua at line 80: module 'strict' not found.
  325. Lua error in package.lua at line 80: module 'strict' not found.
  326. Lua error in package.lua at line 80: module 'strict' not found.
  327. Lua error in package.lua at line 80: module 'strict' not found.
  328. Lua error in package.lua at line 80: module 'strict' not found.
  329. http://www.kpmg.com/Global/en/IssuesAndInsights/ArticlesPublications/Documents/nuclear-power-role-in-shaping-energy-policies-v3.pdf
  330. Lua error in package.lua at line 80: module 'strict' not found.
  331. Lua error in package.lua at line 80: module 'strict' not found.
  332. Lua error in package.lua at line 80: module 'strict' not found.
  333. Lua error in package.lua at line 80: module 'strict' not found.
  334. Lua error in package.lua at line 80: module 'strict' not found.
  335. 336.0 336.1 Lua error in package.lua at line 80: module 'strict' not found.
  336. Lua error in package.lua at line 80: module 'strict' not found.
  337. Culture of complicity tied to stricken nuclear plant, NYTimes, 27 April 2011
  338. Lua error in package.lua at line 80: module 'strict' not found.
  339. Lua error in package.lua at line 80: module 'strict' not found.
  340. Lua error in package.lua at line 80: module 'strict' not found.
  341. Lua error in package.lua at line 80: module 'strict' not found.
  342. Lua error in package.lua at line 80: module 'strict' not found.
  343. 344.0 344.1 Lua error in package.lua at line 80: module 'strict' not found.
  344. Lua error in package.lua at line 80: module 'strict' not found.
  345. Lua error in package.lua at line 80: module 'strict' not found.
  346. Lua error in package.lua at line 80: module 'strict' not found.
  347. Lua error in package.lua at line 80: module 'strict' not found.
  348. Lua error in package.lua at line 80: module 'strict' not found.

Sources

Cited

  • Lua error in package.lua at line 80: module 'strict' not found.

Other

  • Caldicott, Helen [ed.]: Crisis Without End: The Medical and Ecological Consequences of the Fukushima Nuclear Catastrophe. [From the "Symposium at the New York Academy of Medicine, March 11–12, 2013"]. The New Press, 2014. ISBN 978-1-59558-970-5 (eBook)

External links

Investigation

Video, drawings and images

Artwork

Other