250 City Road

From Infogalactic: the planetary knowledge core
Jump to: navigation, search
250 City Road
250 City Road.jpg
Artist's impression of 250 City Road
General information
Status Under construction
Type Mixed-use
Architectural style Modern
Location Islington, EC1V
Address 250 City Road
Town or city London
Country United Kingdom
Coordinates Lua error in package.lua at line 80: module 'strict' not found.
Construction started 2015 (phase one)
Opened 2017 (phase one)
Owner Berkeley
Height
Architectural 155 m (509 ft)/137 m (449 ft)
Technical details
Floor count 46/32
Design and construction
Architect Foster + Partners

Lua error in package.lua at line 80: module 'strict' not found.

250 City Road is a residential-led scheme under construction in the borough of Islington, London, designed by Foster + Partners and developed by Berkeley. It was given planning permission in 2014 by the then London Mayor Boris Johnson after being rejected by Islington Council.

Phase one started in 2015. Upon completion, the development will have two towers of 46 and 32 storeys, 930 apartments and a 190 room hotel.

Background

In 2011, developer Berkeley acquired the 1.9 hectare 250 City Road site, which has been a business park since the 1980s. The site came with planning permission, granted in 2010, for a new development designed by BUJ Architects. The proposal included a 27 storey tower, 700 homes, offices as well as retail and restaurant space. However, Berkeley started work on new plans in collaboration with architect firm DSDHA.[1]

In 2012, architects Foster + Partners took over the design for the new scheme.[1] In 2013, Berkeley applied for planning permission for the development but it was rejected by Islington Council. In December 2013, London Mayor at the time, Boris Johnson, reviewed the decision and gave the development approval in April 2014.[2][3]

The proposals include two towers of 155 m (509 ft) and 137 m (449 ft)[4] containing 46 and 32 floors. In total, the development will have 930 apartments as well as a 190 room hotel, office and retail space.[5]

Construction

Phase one of the development, which includes the construction of the tallest tower, began in March 2015 and is expected to be completed in December 2017.[3]

See also

Notes and references

  1. 1.0 1.1 Lua error in package.lua at line 80: module 'strict' not found.
  2. Lua error in package.lua at line 80: module 'strict' not found.
  3. 3.0 3.1 Lua error in package.lua at line 80: module 'strict' not found.
  4. Lua error in package.lua at line 80: module 'strict' not found.
  5. Lua error in package.lua at line 80: module 'strict' not found.