A1 autostrada (Poland)

From Infogalactic: the planetary knowledge core
Jump to: navigation, search

Autostrada A1 shield}}

Autostrada A1
Autostrada Bursztynowa
290px
Route information
E75-PL.svg Part of E75
Length: 395.5 km (245.7 mi)
565.1 km (351 mi) planned
Major junctions
From: S6-PL.svg S6 near Gdańsk
  S5-PL.svg S5 near Grudziądz (planned)

S10-PL.svg S10 near Toruń (under construction)
A2-PL.svg A2 near Stryków (under construction)
S8-PL.svg S8 near Tuszyn (under construction)
S12-PL.svg S12 near Piotrków Trybunalski (planned)
S1-PL.svg S1 and S11-PL.svg S11 junction near Katowice International Airport in Pyrzowice

A4-PL.svg A4 near Gliwice
To: CZ traffic sign IS16a - D1.svg D1 border with Czech Republic
Location
Major cities: Gdańsk, Grudziądz, Toruń, Łódź, Piotrków Trybunalski, Częstochowa, Gliwice
Highway system
National roads in Poland
File:Autostrada A1 Swarożyn-Nowe Marzy.JPG
A1 near Grudziądz, northern (Gdańsk - Grudziądz) section.
2005 photo of partially completed bridge over the Vistula river in Toruń-Czerniewice on the Torun bypass, with only one carriageway finished and pillars for the planned second one. The bridge was opened with dual carriageways in fall of 2011 and became part of A1.
Gliwice-Sosnica A1, A4 and national road 44 junction near Gliwice, the largest motorway junction in Central-Eastern Europe, opened 2009-2010
File:Stawmoczuryfromthesky.jpg
800 meters bridge in Knurow near Gliwice

The autostrada A1, officially named Amber Highway (pol. Autostrada Bursztynowa) in Poland is a north-south motorway under construction that will run through central Poland, from Gdańsk on the Baltic Sea through Łódź and the Upper Silesian Industry Area (to the west of Katowice) to the Polish-Czech border in Gorzyczki (Wodzisław County) /Věřňovice (Karviná District), where it is connected with the Czech motorway D1. The motorway is a part of the European route E75. The total planned length is 565.1 km (351.1 mi).

History of construction

As of October 2015, about 395.5 km (245.8 mi) of the motorway has been completed. The oldest section, a Lua error in Module:Convert at line 272: attempt to index local 'cat' (a nil value). stretch as the Piotrków Trybunalski bypass, was built between 1978 and 1989. Further construction resumed in 2005 with the building of the northern section (south of Gdańsk). A 25 km (16 mi) section was opened on 22 December 2007, near Gdańsk, extending the S6 bypass expressway, and a remaining 65 km (40 mi) opened on 17 October 2008. The 62 km extension of the motorway to Toruń opened on 14 October 2011.

At the southern end of the motorway, construction of a 15.5 km (9.6 mi) section from Gliwice-Sośnica to Bełk, part of the southernmost section from the junction with the A4 motorway at Sośnica district of Gliwice to the Czech border, began on 26 March 2007 and was completed in December 2009. The remainder of the 48 km (30 mi) long section from A4 to the border was opened in different stages from 2009 till 2014. Construction of the 43 km (27 mi) section from Gliwice-Sośnica north to Pyrzowice began in 2009 and was fully completed by June 2012.

On 15 December 2009 the Polish government announced the cancelling of the contract for building the Świerklany - Gorzyczki (Czech border) section, citing the unacceptably slow pace of construction by Alpine Bau GmbH.[1] The government solicited new bids for this section in April 2010[1] and the bid was won by the same company that lost the original contract, and construction resumed in October 2010.[2] The original plan was for the road to be ready in the Summer of 2010,[1] and according to the new contract it was be ready in April 2012, in time for Euro 2012 championships. Alpine Bau GmbH abandoned their second effort to finish this section in May 2013.[3] It was finally opened in May 2014.

On 22 January 2009 a contract was signed for the construction of the 180 km (110 mi) section from Stryków (junction with motorway A2) to Pyrzowice.[4] Under the terms of the contract, the segment from Stryków to Częstochowa (123 km (76 mi)) was to be finished by May 2012, while the remaining segment from Częstochowa to Pyrzowice (57 km (35 mi)) was to be finished by January 2014 (60 months after the signing of the contract). The motorway was to be built within a Private-Public Partnership framework by company Autostrada Południe. The contract included the rebuilding of an already existing stretch of A1 motorway (opened in 1989) as well as the upgrade of the existing dual-carriageway road between Piotrków Trybunalski and Częstochowa. On 23 January 2010 the contract was cancelled as the company was not able to secure financing.[5] It carried out the design project of the motorway however, which according to the Polish government was to make it possible for construction to begin in 2010 by new contractors, and be finished by 2012. However, the design project turned out to be full of flaws and will have to be redone from scratch.[6] The current estimate for the section is rather uncertain, as 82 km of the A1 have got only the environmental decision(Oct 2015), but it is very unlikely that the whole motorway section, the only incomplete one, is going to open before or in 2020.

The construction of the A1 motorway has been a highly politicized issue in Poland, as it is perceived to be an economically vital road that would connect the country's major ports on the Baltic coast with both central and southern Poland. Since 1989 various governments and political parties have supported an accelerated construction schedule for this motorway, without results. After many delays, caused mainly by lack of funding, construction resumed in 2005. When Jarosław Kaczyński was prime minister, statements from government officials indicated a firm commitment for accelerating the construction schedule, with completion of the whole motorway achieved in 2010. That plan was too optimistic, but according to then current plans much of the motorway would be opened by 2012(as it was, 68% was complete by Dec 2012). But the whole motorway planned time of construction is very uncertain, as only 10.7% of motorway is under construction as of October 2015.

Sections of the motorway

Motorway section Length Constructed Note
Gdańsk - Grudziądz 90 km 2005–2008 opened December 2008; toll motorway
Grudziądz - Toruń 62 km 2008–2011 opened Oct. 14, 2011; toll motorway
Toruń - Pikutkowo ( Włocławek West ) 45 km 2010–2013 construction interrupted in September, 2012 as companies involved have been ejected from the contract,.[7][8] (the ejected companies have sued the Polish authorities). New contractors have been selected in April, 2013 and the road opened to traffic on December 20, 2013.[9][10]
Pikutkowo ( Włocławek West ) - Kowal 19 km 2010–2014 construction interrupted in September, 2012 as companies involved have been ejected from the contract,.[7][8] (the ejected companies have sued the Polish authorities). New contractors were selected in April, 2013 and the road fully opened to traffic at the end of April 2014.[9]
Kowal - Stryków/Łódź 75 km 2010–2012 opened November 13, 2012
Stryków/Łódź - Tuszyn 37.3 km 2012–2016 Design-build contract signed in December 2010, completion originally planned in 32 months,[11] then delayed to June, 2014[12] then later plans had it completed in Summer of 2015 [13] However, the contractor abandoned the contract in January, 2014, so this stretch will be delayed further, as new contractor will have to be selected.[14] In September 2014 it was announced this section had been divided into 3 sections and contractors for 2 of these sections had been appointed.[15] Planned date of opening: April 2016
Tuszyn - Piotrków Trybunalski 17 km 1978–1989 built, to be upgraded
Piotrków Trybunalski - Częstochowa 82 km ? planned upgrade of existing dual-carriageway road, which was built in the 1970s with some motorway features.
Częstochowa Północ - Woźniki 41,7 km 2015-2018 tendered, Częstochowa bypass has already been signed for completion [16]
Woźniki - Pyrzowice 15,2 km 2015-2018 under construction, contract signed with STRABAG on August 26, 2015 [17] Map, planned date of opening: December 2018
Pyrzowice - "Zabrze Północ” (Wieszowa) 31 km 2009–2012 opened 1 June 2012[18]
"Zabrze Północ” (Wieszowa) - Maciejów 8,1 km 2009–2011 opened December 2011[19]
Maciejów - Sośnica/Gliwice 6 km 2009–2011 opened September 2011[20]
Sośnica/Gliwice - Bełk 15,5 km 2007–2009 opened December 2009
Bełk - Świerklany 14,1 km 2008-2011 Bełk - Rowień opened in December 2010, Rowień - Świerklany opened in April 2011 (delayed because of floods)
Świerklany - Mszana 7,3 km 2007–2014 construction interrupted in late 2009 due to contract dispute,[1] then resumed[2] in October 2010. Was to open in July 2012,[21] but a problem with one of the bridges then moved the planned opening until August, 2013.[22] In May, 2013 the contractor abandoned the project, citing disagreement with Polish government agencies.[23] A new contractor to finish the bridge was selected in June 2013, and the road fully opened to traffic on May 23, 2014.
Mszana - Gorzyczki (Czech border) 11,1 km 2007–2012 construction interrupted in late 2009 due to contract dispute,[1] then resumed[2] in October 2010. Opened (to light vehicles only) in November 2012, and to all vehicles on May 23, 2014 after completion of adjacent section.[24]

Route description

Number of exit(facility) Exit(facility) name Mileage from terminus Notes(facilities available if opposite the MOP(rest area))
1) RusocinS6-PL.svgDK91-PL.svg43x43pxE75-PL.svg 0 km
Toll booth 1 Gdańsk 1 km (0.62 mi)
(1) MOP Kleszczewko 5.2 km (3.23 mi) parking only
2) Stanisławie43x43px 16 km (9.94 mi)
3) SwarożynDK22-PL.svg 24.4 km (15.16 mi)
4) Pelplin43x43px 35.9 km (22.31 mi)
(2) MOP Olsze 41 km (25.48 mi) petrol station, restaurant present as well as parking
5) Kopytkowo40x40px 57.9 km (35.98 mi)
64.7 km (40.20 mi) Border: kujawsko-pomorskie and pomorskie voiv
(3) MOP Gajewo 68.3 km (42.44 mi)(southbound)

70 km (43.50 mi)(northbound)

parking only
6) Warlubie40x40pxIndirect (in 1 km range):DK91-PL.svg44x44px40x40px 73.2 km (45.48 mi)
7) Nowe MarzyDK5-PL.svgDK91-PL.svgContract signed for(works haven't started):S5-PL.svg 89 km (55.30 mi)
Bridge over Vistula middle at 94.3 km (58.60 mi)
8) GrudziądzDK95-PL.svg(indirect access to DK55-PL.svg) 96.1 km (59.71 mi)
(4) MOP Malankowo 105.6 km (65.62 mi) petrol station and restaurant
9) Lisewo44x44px 111.8 km (69.47 mi)
(5) MOP Nowy Dwór 128.4 km (79.78 mi) parking only
10) TurznoDK96-PL.svg(indirect access to DK15-PL.svg43x43px) 134.3 km (83.45 mi)
11) LubiczDK10-PL.svgDK80-PL.svg(indirect access to 43x43px) 140.4 km (87.24 mi)
(6) MOP Nowa Wieś 143.3 km (89.04 mi) Parking only
Toll booth Toruń 143.7 km (89.29 mi)
Bridge over Vistula(Most Im. Armii Krajowej) 149.1 km (92.65 mi)
12) CzerniewiceS10-PL.svg 151 km (93.83 mi) End of toll road
(7) MOP Otłoczyn Zachód 159 km (98.80 mi) Petrol station and restaurant
13) CiechocinekDK91-PL.svg(indirect access)43x43px 163.6 km (101.66 mi)
(8) MOP Kałęczynek Zachód 177 km (109.98 mi) parking only
14) Brzezie43x43px44x44px(indirect access) 186.5 km (115.89 mi)
15) WłocławekDK62-PL.svg 195.1 km (121.23 mi)
(9) MOP Ludwinowo Wschód 201.8 km (125.39 mi) parking only
16) KowalDK91-PL.svg 215 km (133.59 mi)
(10) MOP Lubień Północ 218.7 km (135.89 mi) petrol station
229.5 km (142.60 mi) Triple border point: kujawsko-pomorskie, łódzkie and mazowieckie (going on the border of the two latter voivoderships to 235.9 km (146.58 mi), when fully starts going in łódzkie)
(11) MOP Strzelce 236.9 km (147.20 mi) Eastbound only, parking only
17) SójkiDK60-PL.svg 243.4 km (151.24 mi)
18) KotliskaDK92-PL.svg 252.6 km (156.96 mi)
19) Piątek43x43px 271 km (168.39 mi)
(12) MOP Głowno 278.1 km (172.80 mi)
20) Łódź PółnocA2-PL.svgE30-PL.svg 292.2 km (181.56 mi) Terminus at the moment
21) Brzeziny Under construction
22) Łódź Wschód
23) Romanów
24) Łódź PołudnieS8-PL.svg
25) Tuszyn 0 km Terminus
26) Piotrków Trybunalski ZachódS8-PL.svgE67-PL.svg 13.3 km (8.26 mi)
27) Piotrków Trybunalski Południe (Bełchatów)DK74-PL.svg 16.1 km (10.00 mi) Terminus
28) Kamieńsk Has only DŚU
29) Radomsko
Entrance to Silesian voivodership
30) Kościelec Has only DŚU
31) Rząsawa Under construction
32) LgotaDK43-PL.svg
33) BlachowniaDK46-PL.svg
34) Zawodzie43x43px Tendered
35) Woźniki42x42px Under construction
36) PyrzowiceS1-PL.svg 0 km Terminus
37) Piekary Śląskie40x40px 14.1 km (8.76 mi)
38) BytomDK11-PL.svg 16.6 km (10.31 mi)
39) Zabrze PółnocDK78-PL.svgDK94-PL.svg 26.6 km (16.53 mi)
40) Zabrze ZachódDK78-PL.svg 31.9 km (19.82 mi)
41) Gliwice WschódDK88-PL.svg 36.1 km (22.43 mi)
42) Gliwice Sośnica(I)43x43px 40.2 km (24.98 mi)
43) Gliwice Sośnica(II)DK44-PL.svg 41.4 km (25.72 mi)
44) Gliwice Sośnica(III)A4-PL.svgE40-PL.svg 42.5 km (26.41 mi)
45) Knurów40x40px 47 km (29.20 mi)
(13) MOP Knurów 50.3 km (31.25 mi) Parking only
46) Dębieńsko 54.2 km (33.68 mi)
47) RybnikDW925-PL.svg 58 km (36.04 mi)
48) MOP Rowień Zachód 65 km (40.39 mi) Petrol station and restaurant
49) Żory43x43px 65.4 km (40.64 mi)
50) Świerklany43x43px 72.4 km (44.99 mi)
51) Mszana44x44px 79.7 km (49.52 mi)
(14) MOP Mszana 82.7 km (51.39 mi) Restaurant, hotel, petrol station and shower
52) Gorzyce (indirect access to DK78-PL.svg) 88.9 km (55.24 mi) Last interchange before border to Czech Republic
Border Gorzyce-Bohumín40x40pxFlag of the Czech Republic.svg 91 km (56.54 mi) Entrance to CZ traffic sign IS16a - D1.svg(Czech motorway);to Ostrava, Olomouc, Brno, Bratislava and Prague

See also

References

External links