Albertirsa–Zakhidnoukrainska–Vinnytsia powerline
The powerline meets Motorway M3 just east of Nagykalló in Hungary
The powerline meets Motorway M3 just east of Nagykalló in Hungary
Location
Country Hungary, Ukraine
Coordinates Lua error in package.lua at line 80: module 'strict' not found.
Lua error in package.lua at line 80: module 'strict' not found.
Lua error in package.lua at line 80: module 'strict' not found.
Lua error in package.lua at line 80: module 'strict' not found.
General direction west–east
From Albertirsa, Hungary
Passes through Zakhidnoukrainska
To Vinnytsia, Ukraine
Construction information
Construction started 1975
Commissioned 1979
Technical information
Type Overhead transmission line
Type of current HVAC
Total length Lua error in Module:Convert at line 1851: attempt to index local 'en_value' (a nil value).
Power rating 2,000 MW
AC Voltage 750 kV

The Albertirsa–Zakhidnoukrainska–Vinnytsia powerline is a power transmission line between Ukraine and Hungary. It is a part of the former "Mir" transmission system between the Soviet Union and Comecon countries. As of today, it is the only 750 kV-powerline in Hungary and one of the few powerlines operated with this voltage in the European Union.

History

On 28 February 1974, the USSR, Bulgaria, Hungary, GDR, Poland and Czechoslovakia signed a cooperation agreement on construction of the 750 kV-line between Vinnytsia and Albertirsa, and substations Vinnytsia, Zakhidnoukrainska and Albertirsa.[1] Construction started in 1975 and it went in service in 1979.[2][3]

Since the synchronization of the power grid of Hungary with that of the synchronous grid of Continental Europe (ENTSO-E) and because of economic reasons, the powerline went out of service in 1993, but was put in service again in 2002 after some new equipment was installed.[2][4]

Technical description

The 479-kilometre (298 mi) long power line connects the substation of Albertirsa in Hungary with Zakhidnoukrainska substation, which is situated east of Borodczyce in Ukraine. It uses as suspension pylons portal pylons. These are free-standing structures in areas, which are sometimes flooded and guyed in areas without flood-danger. As anchor pylons towers with one crossbar are used whereby the conductor is led around the pylon structure. The powerline was designed for the transmission of 2,000 MW electricity.[2]

See also

References

  1. Lua error in package.lua at line 80: module 'strict' not found.
  2. 2.0 2.1 2.2 Lua error in package.lua at line 80: module 'strict' not found.
  3. Lua error in package.lua at line 80: module 'strict' not found.
  4. Lua error in package.lua at line 80: module 'strict' not found.