Third Bridge over Panama Canal
Coordinates Lua error in package.lua at line 80: module 'strict' not found.
Carries Four lanes of traffic, pedestrians and bicycles
Crosses Atlantic approach to the Panama Canal
Locale Colón, Panama
Owner Panama Canal Authority
Characteristics
Design double-pylon, double-plane cable-stayed bridge
Material Prestressed concrete
Total length 1,050 metres (3,440 ft)
Height 212.5 metres (697 ft)
Longest span 530 metres (1,740 ft)
Number of spans 3 (230, 530, 230 m)
Piers in water 1
Clearance below 75 metres (246 ft)[1]
History
Designer HPDI and Louis Berger Group
Constructed by Vinci Construction Grands Projets
Construction begin January 2013
Construction end expected mid 2016 (2016)

The third bridge over the Panama Canal, known as the Atlantic Bridge, is a road bridge under construction in Colón, Panama, which will span the Atlantic entrance to the Canal. When completed it will be a third bridge over the Panama Canal after the Bridge of the Americas and the Centennial Bridge both on the Pacific side of the canal.

The bridge is proposed to be a double-pylon, double-plane, concrete girder, cable-stayed bridge with a main span of 530 metres (1,740 ft), and two side spans of 230 metres (750 ft). The east and west approaches are to be 1,074 metres (3,524 ft) and 756 metres (2,480 ft) long respectively. The bridge was designed by the China Communication Construction Company (CCCC) consisting of HPDI and Louis Berger Group.[1]

Construction

Three consortiums were approved to bid for the bridge construction: Acciona Infraestructuras -Tradeco (Spain and Mexico), OdebrechtHyundai Joint Venture (Brazil and Korea), and Vinci Construction Grands Projets (France). Tenders were received in August 2012.[2]

In October 2012, the Panama Canal Authority awarded a contract to The French company Vinci Construction Grands Projets to build a third (permanent) bridge, near the Atlantic side, for a price of US$365,979,472.39.[3] The bridge has no name yet, but Third bridge and Atlantic side bridge are used, as well as Atlantic Bridge.[4][5]

Construction of the bridge, which commenced in January 2013 will take three and a half years and is expected to be completed in mid 2016.[6]

References

  1. 1.0 1.1 Lua error in package.lua at line 80: module 'strict' not found.
  2. Lua error in package.lua at line 80: module 'strict' not found.
  3. Lua error in package.lua at line 80: module 'strict' not found.
  4. Lua error in package.lua at line 80: module 'strict' not found.
  5. Lua error in package.lua at line 80: module 'strict' not found.
  6. Lua error in package.lua at line 80: module 'strict' not found.

External links

<templatestyles src="Asbox/styles.css"></templatestyles>