BRT Federal Line

From Infogalactic: the planetary knowledge core
Jump to: navigation, search
 13  BRT Federal Line
BRT Asia Jaya station.jpeg
The proposed BRT station and busway along Federal Highway at Asia Jaya.
Overview
Native name Laluan BRT Persekutuan
Locale Phase 1A : Pasar Seni - Kerinchi
Phase 1B : Petaling Jaya - Subang Jaya
Phase 2 : Shah Alam - Klang
Transit type Bus rapid transit
Number of lines Hybrid System (combination of Direct Service, Trunk and Feeder)
Number of stations 24[1]
Daily ridership 600,000 daily (expected)[1]
Operation
Began operation 2018[1]
Technical
System length 32.52km[1]
System map
Pasar Seni  5  10 
Kuala Lumpur  1  2 
Sultan Sulaiman(Kampung Attap)
KL Sentral  1  2  5  6  7  8 
Syed Putra(Tun Sambanthan)  6 
Brickfields
Mid Valley  1 
Phase 1A
Phase 1B
Universiti  5 
Kota Darul Ehsan
Jalan Gasing
Taman Jaya
Asia Jaya  5 
Seksyen 51
Seri Setia  2 
Setia Jaya  9  2 
Subang Jaya  2  5 
Phase 1B (median busway)
Phase 2 (mixed traffic)
Batu Tiga  2 
Stadium Shah Alam  12 
Shah Alam(Worldwide Business Park)
SIRIM  12 
UiTM  12 
Seksyen 7
Berkeley
Klang Bus Terminal  2  12 

The proposed BRT Federal Line for KL–Klang Corridors has been identified in KL BRT Report 2011 as one of the potential BRT Corridors and this BRT project is planned to be operational by 2018.[1][2][3][4][5][6]

Designed to compliment existing bus and rail transport networks, the BRT Federal line will employ all-electric buses similar to BRT Sunway Line, however at ground level.

Background

According to a World Bank Report, the Klang-Shah Alam-Petaling Jaya corridor has nearly a million private vehicles travelling on the Federal Highway daily during morning peak hours.[1] Transport Minister, Liow Tiong Lai has proposed the BRT KL-Klang line to ease the congestion.[7] Unlike the BRT Sunway Line, the BRT KL-Klang will be at ground level.[7]

Prime Minister, Najib Razak has allocated RM 1.5 billion for the project during the 2016 Budget presentation.[8]

The BRT line is planned to be built in the middle of Federal Highway and the construction is expected to start in the third quarter of 2016.[1] Upon completion, about 80% of the BRT line will offer some form of connection with the LRT as well as KTM Komuter and will cut down travel times between Kuala Lumpur and Klang to 40 minutes from current 70 minutes.[9] This project will start from Q3-2016.

See also

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 1.6 Lua error in package.lua at line 80: module 'strict' not found.
  2. Lua error in package.lua at line 80: module 'strict' not found.
  3. Lua error in package.lua at line 80: module 'strict' not found.
  4. Lua error in package.lua at line 80: module 'strict' not found.
  5. Lua error in package.lua at line 80: module 'strict' not found.
  6. Lua error in package.lua at line 80: module 'strict' not found.
  7. 7.0 7.1 Lua error in package.lua at line 80: module 'strict' not found.
  8. Lua error in package.lua at line 80: module 'strict' not found.
  9. Lua error in package.lua at line 80: module 'strict' not found.

External links