Beijing–Tianjin Intercity Railway

From Infogalactic: the planetary knowledge core
Jump to: navigation, search
Beijing–Tianjin
Intercity Railway
京津城际铁路
ChinaRailwayHighspeed.svg
CRH3 in Tianjin.JPG
A CRH3C high speed train at the Tianjin Railway Station.
Overview
Type High-speed rail
Status Operational
Locale Beijing
Tianjin
Termini Beijing South
Phase I Tianjin
Phase II Yujiapu
Stations Phase I 5

Phase II 4

Total 9
Services 1
Operation
Opened Phase I 1 August 2008
Phase II 20 September 2015
Operator(s) China Railway High-speed
Technical
Line length Phase I 117 km (73 mi)

Phase II 44 km (27 mi)

Total 161 km (100 mi)
Track gauge 4 ft 8 12 in (1,435 mm)
Route map
京津城际铁路.png
Beijing-Tianjin Intercity Railway
Line length: 161 km (100.0 mi)
Track gauge: 1,435 mm (4 ft 8 12 in)
Maximum speed: 350 km/h (217.5 mph)
Stations and structures
0.000 Beijing South
21.321 Yizhuang
45.573 Yongle
83.242 Wuqing
To Tianjin West
116.939 Tianjin
Airport Branchline
to Tianjin Airport
Airport West Depot
Junliangcheng North
Binhai
Tianjin-Qinhuangdao HSR
to Qinhuangdao
Binhai West Depot
Jinshan Railway
Tanggu
Jinshan Railway
Yujiapu Railway Station

The Beijing–Tianjin Intercity Railway (simplified Chinese: 京津城际铁路; traditional Chinese: 京津城際鐵路; pinyin: Jīng-Jīn chéngjì tiělù) is a China passenger-only line high-speed rail that runs 117 km line (72.7 statute miles) between Beijing and Tianjin. The Chinese government built the line to accommodate trains traveling at a maximum speed of 350 km/h (217 mph), and currently carries CRH high-speed trains running speeds up to 330 km/h (205 mph).

When the line opened on August 1, 2008, it set the record for the fastest conventional train service in the world by top speed, and reduced travel time between the two largest cities in northern China from 70 to 30 minutes.[1][2] A second phase of construction extended this line from Tianjin to the Binhai New Area subdistrict of Yujiapu was opened on September 20, 2015.[3]

The line is potentially likely to reach 100% capacity in the first half of 2016. To relieve congestion on this line the Second Beijing-Tianjin Intercity Railway', also known as Keihin Railway commenced construction on December 29, 2015.[4] This railway will run from Beijing East Railway Station to Binhai Railway Station via Baodi and Tianjin Binhai International Airport, along a new route to the east of this railway.

Route & Stations

Viaduct on the Beijing-Tianjin Intercity Railway.
Tickets for Beijing-Tianjin High-speed

Beijing to Tianjin

From Beijing South Railway Station, the line runs in a southeasterly direction, following the Beijing-Tianjin-Tanggu Expressway to Tianjin. It has three intermediate stations at Yizhuang, Yongle (not yet fully built) and Wuqing. The line currently uses the Jinshan Railway for some extended services to Tanggu. The service has peak speed between cities.

The line will eventually be extended further east from Tianjin to the Binhai New Area. As an intercity line, it will provide train service only between the two metropolitan areas, unlike the Beijing-Shanghai High-Speed Railway which will continue beyond Shanghai.

The Beijing–Tianjin Intercity Railway has a current length of 116.939 km (fare mileage: 120 km), of which roughly 100 km is built on viaducts and the last 17 kilometres on an embankment. The elevated track ensures level tracks over uneven terrain and eliminates the trains having to slow down to safely navigate through at-grade road crossings.

Tianjin Railway Station

Tanggu Extension

Sometimes known at the Binhai-Tianjin Intercity Railway, this 44 km (27 mi) extension continues southeasterly from Tianjin Railway Station, following the conventional railway to Tanggu but built on elevated piers. It passes a maintenance depot at Airport West, through Junliangcheng to Tanggu before entering a tunnel to an underground station at Yujiapu. After completion, the Tianjin Binhai New Area to Tianjin with be 15 minutes in travel time, Beijing to the Tianjin Binhai New Area is about 45 minutes directly. Junctions have been built along the line branching off to a new station at Tianjin Binhai International Airport and to Binhai Railway Station on the Tianjin–Qinhuangdao High-Speed Railway.

Yujiapu Railway Station

Service

"5100" brand mineral water. A passenger can get a complimentary bottle on showing his or her intercity train ticket

The line opened on August 1, 2008 with 47 daily pairs of intercity trains between Beijing South and Tianjin. Since September 14, 2008, 10 more pairs of trains were added, reducing the minimum interval from 15 minutes to 10 minutes. On September 24, 2008, 4 pairs of trains extended to Tanggu along the conventional railway. On September 28, 2008, 2 more pairs of trains were added into service. Frequencies have consistently been increased since to cope with rising demand. On September 20, 2015, services to Tanggu and Yujiapu transferred on to the parallel high-speed line.

These intercity trains are designated by the prefixed "C" (城) followed by four digits, from C2001 to C2298. Of these, C2001–C2198 are non-stop trains from Beijing South to Tianjin. The odd numbers for trains departing from Beijing South and even numbers for those running to Beijing South. Trains numbered C2201–C2268 are trains from Beijing South and Tianjin that stop at on the way at Wuqing and Yizhuang stations. Trains C2271–C2298 run from Beijing South to Tanggu.

In addition to the intercity service, 13 pairs of trains were diverted to this line from the preexisting Beijing-Shanghai (Jinghu) Railway, including trains from Beijing South to Jinan, Qingdao, Shanghai, and Tianjin West. With the opening of the Beijing-Shanghai High Speed Railway, these trains have been diverted to the new line.

A pair of special track examination trains (numbered DJ01/02) run every day in the morning before any regular trains into service. A track-measuring train (numbered DJ5581/2) runs every ten days. In summary, there are 62 pairs of train in service, 60 of them for passengers. Frequencies are increased over weekends and during major holidays.

Following the Wenzhou train crash, maximum speeds were reduced to 300 km/h, with rides taking only three minutes longer than usual. There have been slight drops in fares to accompany the temporary speed limits.

Tickets

Tickets bought at high speed railway stations are blue magnetic tickets, different from the regular pink tickets

Depending on destination, four classes of seats are available on Beijing-Tianjin intercity trains:

  • Business and VIP Class one-way: ¥115, ¥175 (fare depends on travel route, see below).
  • Special Class one-way: ¥94 (about €10 or $15 US). They are located near the tail of trains, with 8–16 seats per train.
  • First Class one-way: ¥66 (about €7 or $10 US).
  • Second Class one-way: ¥55 (€6, $8 US).

Intercity train fares are more expensive than slower trains on preexisting lines. Fares are more expensive for extended trips to Tanggu and cheaper for trips from Beijing South or Tianjin to the midway Wuqing station.

Beginning early 2009, frequent rider stored-value cards were introduced for use on this line. Standard Card holders are allowed free seating in the reserved Second Class carriage, Car 6. Gold Card holders are allocated a few reserved seats in Car 5, which is the First Class carriage. There are no discounts for users of these cards, nor does a frequent rider points award program exist. To comply with new ticket ID rules effective June 1, 2011, new and upgraded cards are linked to a document of identity.

Technical information

The line is the first railway in China to be built for operational speeds above 300 km/h. This railway line allows speeds up to 350 km/h.[5] A trip between Beijing and Tianjin takes 30 minutes.[6]

Rolling Stock

With effect from mid-2009, only CRH3 trains are used for intercity services on the line. High speed services to Ji'nan, Qingdao and Shanghai, which used to run on this route, are now diverted to the Beijing-Shanghai High Speed Railway.

Signaling system

The signaling system is built around Simis W electronic interlockings, Vicos operations control system and ETCS Level 1 train control system.[7]

Overhead catenary system

The catenary system in use is Sicat HA, aluminum cantilever,[7] powered by two sub-stations at 25kV 50 Hz AC.

Speed record

Train speed display

On June 24, 2008 a Chinese conventional-wheeled train speed record was set on the line when a Siemens Velaro-derived China Railways CRH3 train reached 394.3 km/h.[6]

History

  • Construction of the Beijing-Tianjin Intercity High-Speed Rail Line began on July 4, 2005.[8]
  • In April 2006, Siemens and its consortium partners EEB (Electrification Engineering Bureau) and CRSC (China National Railway Signal & Communication Corporation) were awarded a contract by the Chinese Ministry of Railways (MoR) to supply and install the signaling systems, communications equipment and power supplies as well as the overhead line and to take over responsibility for system integration and overall project management.[7]
  • On May 11, 2007 the first interlocking container for the Beijing-Tianjin line left the Siemens factory in Brunswick, Germany. (This container had been the 1,000th container shipped from the factory overall).[9]
  • August 1, 2008, The initial line between Beijing and Tianjin opens to traffic in time for the 2008 Beijing Olympic Games.
  • September 16, 2009, the Beijing–Tianjin Intercity Railway Co. began construction on Tanggu Extension. Before construction was completed, services were to operate along the parallel conventional railway to Tanggu.[10]
  • August 14, 2015, construction of the Tanggu Extension was completed and testing of the new line began.
  • September 20, 2015, the Tanggu Extension was opened for business, with service from Beijing South Station to Yujiapu in one hour 02 minutes, the Tianjin station to Yujiapu service was 23 minutes.[3]

Ridership

Before the line was finished, it was expected that the railway line would handle 32 million passengers in 2008 and 54 million passengers in 2015.[11]

The line opened on August 1, 2008 just before the opening of the 2008 Beijing Olympics, which held some football matches in Tianjin. The introduction of high speed rail service significantly boosted rail travel between the two cities. In 2007, conventional train service between Beijing and Tianjin delivered 8.3 million rides. In the first year of high-speed rail service, from August 2008 to July 2009, total rail passenger volume between Beijing and Tianjin reached 18.7 million, of which 15.85 million rode the Intercity trains.[12] Meanwhile, during the same period, ridership on intercity buses fell by 36.8%.[13] As of September 2010, daily ridership averaged 69,000 or an annual rate of 25.2 million.[14] The line has a capacity of delivering 100 million rides annually[15] and initial estimated repayment period of 16 years.[14]

From 2008 to 2013, ridership grew at an annual rate of 20% reaching a cumulative 88 million passengers.[16]

Finances

At the start of construction, an expected ¥12.3 billion (US$1.48 billion) was expected to be invested into the Beijing–Tianjin Intercity Railway.[8] At the time of construction, the Ministry of Railways and the Tianjian government had each contributed ¥2.6 billion (US$325 million) to the project, while the central government requisitioned land and paid for the resettlement of those affected.[11] However, it would later cost $2.34 billion to build.[17] As of 2010, the line cost ¥1.8 billion per annum to operate, including ¥0.6 billion in interest payments on its ¥10 billion of loan obligations.[14] The terms of the loans range from 5–10 years at interest rates of 6.3 to 6.8 percent.[14] In its first year of operation from August 1, 2008 to July 31, 2009, the line generated ¥1.1 billion in revenues on 18.7 million rides delivered and incurred a loss of ¥0.7 billion. In the second year, ridership rose to 22.3 million and revenues improved to ¥1.4 billion, which narrowed to below ¥0.5 billion.[14] To break even, the line must deliver 30 million rides annually.[14] To be able to repay principal, ridership would need to exceed 40 million.[14] As of 2012, Beijing–Tianjin Intercity Railway officially reported to break even financially, Defined as operational costs with debt payments is matched with revenue.[18]

See also

References

  1. China inaugurates 220 mph fastest rail service in world in time for Olympics
  2. Sify News:China to open world's fastest rail line ahead of Olympics
  3. 3.0 3.1 Lua error in package.lua at line 80: module 'strict' not found.
  4. Lua error in package.lua at line 80: module 'strict' not found.
  5. Beijing – Tianjin elevated line anticipates 350 km/h, Railway Gazette International March 2006
  6. 6.0 6.1 Velaro sets Chinese speed record, Railway Gazette International June 27, 2008
  7. 7.0 7.1 7.2 Lua error in package.lua at line 80: module 'strict' not found.
  8. 8.0 8.1 Lua error in package.lua at line 80: module 'strict' not found.
  9. Lua error in package.lua at line 80: module 'strict' not found.
  10. Lua error in package.lua at line 80: module 'strict' not found.
  11. 11.0 11.1 Lua error in package.lua at line 80: module 'strict' not found.
  12. (Chinese)[http://www.eeo.com.cn/Politics/official/2010/05/20/170492.shtml "发改委回应高铁垄断举报 将适时制定高铁正式票价"]May 20, 2010
  13. Lua error in package.lua at line 80: module 'strict' not found.
  14. 14.0 14.1 14.2 14.3 14.4 14.5 14.6 (Chinese) "不计建设投资 京津高铁今年持平" 经济观察报 September 18, 2010
  15. (Chinese) "4万公里快速铁路网冲刺" 21世纪经济报道 September 30, 2010
  16. "China’s high-speed programme back on track" International Railway Journal January 10, 2013
  17. Lua error in package.lua at line 80: module 'strict' not found.
  18. "Bullet trains trigger profit growth for railways" The Irish Times September 25, 2012

External links

Lua error in package.lua at line 80: module 'strict' not found.