Bilaspur–Mandi–Leh railway
Overview
Type All-weather 1,676 mm (5 ft 6 in) Indian broad gauge
Status
  • Surveys – done
  • Feasibility Report – done
  • Sent to Planning Commission for appraisal – done
  • Approved by Planning Commission – no
  • Land Acquisition started – no
  • Construction started – no
Locale Himachal Pradesh and Jammu and Kashmir, India
Termini Bilaspur, Himachal Pradesh
Leh
Stations BilaspurManaliUpshiLeh
Services Bilaspur-ManaliKulluKeylongLeh
Website http://www.indianrailways.gov.in
Technical
Line length Lua error in Module:Convert at line 1851: attempt to index local 'en_value' (a nil value).
Track length Lua error in Module:Convert at line 1851: attempt to index local 'en_value' (a nil value).
Track gauge 1,676 mm (5 ft 6 in) All-weather Indian broad gauge
Highest elevation 5,359 m (17,582 ft) at Tanglangla

The Bilaspur–Mandi–Leh railway is a proposed high-elevation all-weather Indian broad-gauge 1,676 mm (5 ft 6 in) railway track that is planned to connect Bilaspur in Himachal Pradesh to Leh in Ladakh region of Jammu and Kashmir state of India.[1][2] It would link to the Indian railway network via an extension of the Kangra Valley Railway to Mandi, which would be converted to broad gauge.[3][4]

The total expected length of Bilaspur–Mandi–Leh railway is almost 500 km (310 miles). It would become the highest railway track in the world, overtaking the current record of China's Qinghai–Tibet Railway.[5] The Railway Budget 2011-2012 announced that the project would be taken up in the next year's budget.[6] The next year's Railway Budget announced that the project was sent to the Planning Commission for appraisal.[7][8]

Bilaspur-Mandi-Leh Railway route map
To Srinagar (planned)
0 Leh
Choglamshahr
Sindhughat
Shey
Thicksey
Rabirpora
Chang-Karu
Upshi-Junction
Rumtse
Taglang La
Debring
Pang
Lachalungla
Sarchu
Baralachala
Dharcha
Jispa
Keylong
Tandi
Sissu
Rohtang Hault
Manali
Naggar
Kullu
Bhuntar
Aut
Pandoh
To Joginder Nagar
Mandi-Junction
Bilaspur-Junction

History

The Chief Minister of Himachal Pradesh asked the Government of India to extend railway connectivity from Bilaspur to Leh through Mandi, Manali and Keylong. This would increase tourism in Himachal Pradesh and Ladakh and facilitate quicker movement of troops and equipment.[1][2] Following an examination of the feasibility report for the proposed Bilaspur–Mandi–Leh railway line, the Union Railway Ministry of India forwarded the recommendation to the Planning Commission of India for its approval.[8] The survey for the project had been done and presently it is seeking approval of the planning commission of India and while railway minister assured about early clearance of this project.

Strategic importance

Once this railway line is completed, Leh will be directly connected to Himachal Pradesh and the rest of India by railway. The distance between Bilaspur and Leh will be about 500 km (310 mi). When the railway lines to Bilaspur and then to Leh are completed, the time taken to reach Leh from Delhi will be reduced to less than two days compared to about four days by the existing highway from Manali. Personnel and equipment will be transported more easily to Leh, a strategic military base. This is one of the four important railway connectivity along China border identified by the Defence Ministry.[9]

Uncertainty due to paucity of funds

The Bhanupalli (Punjab) to Bilaspur rail link is currently under construction but hardly any funds have been allocated and almost no progress was made as of 2013. There has been a demand to lay the railway line to Bilaspur from Kalka railhead instead of laying it from Bhanupalli. Therefore, the alignment and the fate of the proposed railway line to Leh is very uncertain. The railways are short of funds to the extent of more than four hundred billion rupees for the existing projects in hand as of 2013.

Taglangla station

Taglang La Pass

Taglangla station at Taglang La is expected to become the highest railway station in the world at 5,359 m (17,582 ft) above the sea level overtaking the current record of Tanggula Railway Station in China at 5,086 m (16,686 ft).

Challenge

After Konkan Railway and Kashmir Railway, Bilaspur–Mandi–Leh railway line will be the most challenging railway project in Indian Railways due to high mountains, a large number of tunnels and high bridges and severe cold weather.[original research?] According to the survey report, cost of construction of this 498 km (309 mi) long all weather broad gauge railway line has been calculated at Rs 22,831 crore with a negative rate of return of 4.46%.[10] However, it is uncertain when the construction would start, if at all.

See also

References

  1. 1.0 1.1 Lua error in package.lua at line 80: module 'strict' not found.
  2. 2.0 2.1 Lua error in package.lua at line 80: module 'strict' not found.
  3. Rail link to Leh: Centre seeks Plan panel nod
  4. http://www.thehindu.com/opinion/op-ed/a-train-journey-worth-making/article4870304.ece
  5. Lua error in package.lua at line 80: module 'strict' not found.
  6. http://www.india.gov.in/images/railbudget11-12.pdf
  7. http://www.indianrail.gov.in/ESpeech_2012-13.pdf
  8. 8.0 8.1 Lua error in package.lua at line 80: module 'strict' not found.
  9. Lua error in package.lua at line 80: module 'strict' not found.
  10. http://articles.timesofindia.indiatimes.com/2013-04-28/india/38877865_1_rail-line-nyoma-chushul