File:TBM S-210 Alptransit Faido East.jpg
From Infogalactic: the planetary knowledge core
Size of this preview: 800 × 600 pixels. Other resolutions: 320 × 240 pixels | 1,600 × 1,200 pixels.
Original file (1,600 × 1,200 pixels, file size: 552 KB, MIME type: image/jpeg)
Summary
Head of the S-210 Tunnel boring machine used to excavate the eastern tube of the Gotthard Base tunnel between Bodio and Faido, Canton Ticino, Switzerland
(all roll chisels have already been removed, picture taken 10 days after breakthrough into multi-function station Faido, 2000 m of rock overhead, diameter is 8.80 m / 29 ft., length of the TBM is 400 m / 1312 ft.)
Licensing
Lua error in package.lua at line 80: module 'strict' not found.
File history
Click on a date/time to view the file as it appeared at that time.
Date/Time | Thumbnail | Dimensions | User | Comment | |
---|---|---|---|---|---|
current | 22:01, 7 January 2017 | 1,600 × 1,200 (552 KB) | 127.0.0.1 (talk) | <p>Head of the S-210 Tunnel boring machine used to excavate the eastern tube of the Gotthard Base tunnel between Bodio and Faido, Canton Ticino, Switzerland<br>(all roll chisels have already been removed, picture taken 10 days after breakthrough into multi-function station Faido, 2000 m of rock overhead, diameter is 8.80 m / 29 ft., length of the TBM is 400 m / 1312 ft.) </p> |
- You cannot overwrite this file.
File usage
The following 4 pages link to this file: