The current French railway signalling system is in force on the Réseau Ferré de France since 1930, when the code Verlant was applied.

History

Historically, each private railway company designed and used its own signals. However, during the First World War the interpenetration of trains between networks had increased, so that it became necessary to create a new unified signals specification. A commission was set up in May 1926, directed by Eugène Verlant of the PLM.

The Verlant commission submitted its report at the end of 1927. The new code of signals received the approval of the Ministry of Public Labour on 1 August 1930. Conversion to the Verlant code was completed only at the end of 1936, except on the network of Alsace-Lorraine where it was completed later, because of the unusual pre-existing signalling.

The Verlant code was very innovative, based on simple principles:

  • Mainly based on color light signalling, which thereafter simplified the installation of the automatic block.
  • Light signals used three basic colors: red (stop), yellow (to announce stop or limited speed), green (clear). This color code was already applied by many foreign companies. It was also used for traffic lights.
  • Simplification: it presented only the most imperative indications (except in special cases).

Placement of signals

Signals are normally placed on the side of the line: on the left if the trains run on the left. But in the Départements of Bas-Rhin, Haut-Rhin) and Moselle, trains normally run on the right and so signals are placed on the right. This area was part of Germany from 1870 to 1918; trains run on the right in Germany and the railways were built during that period. When the area became French again in 1918, the railway network was almost complete, and trains ran on the right. Reversing the direction would be too expensive, in particular for interlocking, so circulation and signals remained on the right.

In several stations and on several line sections, when the local layout requires it, signals can be set on the right. They are then equipped with a white arrow indicating the way to which they are addressed.

On some double-track line sections equipped with "permanent counter-track installations" (IPCS), signals are placed normally on the right for counter-track circulations. No white arrows are used. In fact, entering the wrong way is confirmed by a luminous counter-track entrance board (TECS), which, when lit, indicates that the following signals are placed on the right (on the left for Alsace and Moselle). Similarly, a counter-track exit board (TSCS) indicates the return to normal running, with signals placed on the normal side.

Where trains run on the left, the hand-held stop signals (red flag, stop marker or lantern with red light) are presented on the left or at the center of the relevant track. If there is a platform by the track, they can be presented on the side of the platform.

The block system

The block system is based on breaking a line into blocks. The blocks on a line between two stations are part of the block system.

Non interlocked manual blocks: For safety reasons, non-interlocked manual blocks are used only on double track.

Interlocked manual blocks: In the case of a single track, interlocking is used in manual blocks to avoid an error resulting in a head on collision.

Automatic blocks: Two types of automatic block are in common use in France. BAL (Bloc Automatique Lumineux) is used on high traffic lines with block lengths of about 1500 m) and BAPR (Bloc automatique à permissivité restreinte) is used in low traffic areas with block lengths up to 15 km.

Normally a train can only enter a block if it is free. The block is a track section delimited by signals, whose length depends on the distance needed for a train to stop or slow down, in the worst conditions on the portion of line under consideration. When traffic density is low, the blocks may be longer.

In future, the blocks may be mobile and follow the progress of the train (virtual blocks, not materialized on the ground and calculated continuously by an integrated on board system). This will optimize the use of the line and reduce the distance needed between successive trains. This moving block system is already in use on the central section of the RER line A between Nanterre-Préfecture and Vincennes. The trackside signals are still in place but are turned off at the approach of a train whose mobile system signalling (SACEM) is confirmed in operation. They are turned on if problems arise.

The current signalling system has already reduced the spacing between trains from 3 to 2 min. But this is still too long on the busiest lines (suburban, and high-speed lines). In comparison, the moving blocks of the RER A allow a separation of only 90 seconds between trains at full speed.

In general, the signalling device comprises:

  • a 'go' signal (green), meaning that the next block is free, allowing normal operation
  • Warning signals or speed limits (yellow) requiring the driver to slow the train and especially to be able to stop before the next stop signal;
  • Stop signals (red) requires the train to stop.

If the distance between the stop signal and a distant signal is too short (it can sometimes get down to 400m), then the previous distant signal has a yellow flashing to inform the driver of the short distance between the two following signals.

block free: proceed
warning
Carré: stop

These signals are supplemented by "indicator signals (tableaux indicateurs)" showing speed limits, slow-down orders and reminders to go slow on a diverging route, various indications about the track layout (number, dead ends or garage) the signs of electrical section, numbers of radio channels.

Mobile and temporary signals (e.g. construction), are used to complement permanent fixed signals.

Some signals are specific to manoeuvres.

These include various types of signals:

  • Hand signals,
  • Mechanical signals,
  • Lights,
  • Acoustic signals
  • Signal board.

Respect of signals is an imperative,condition sine qua non of safety. The first section of the safety regulations of the SNCF indicates that "any official, whatever his rank must obey passively and immediately any signals that are presented. "

Wayside signals

Here are some examples of signals used on the French network.

Signals and signs give information and special instructions to train drivers. For simplicity, only the most common elements are presented here.

Stop signals and warning signals

Light signals Description Mechanical signals
Carre C BAL.svg Carré (two red lights, aligned either horizontally or vertically): stop.

The carré orders the driver to stop and cannot be passed. It is a protection signal used to protect points, crossovers, stopping places etc.. A carré can be recognized by its "Nf" plate; it has a small white light (œilleton) which lights up when the signal displays a semaphore.

CarreM.PNG
Semaphore A BAL F.svgSemaphore C BAL.svg Semaphore (one red light): stop.

The semaphore orders a temporary halt, usually because the block it protects is engaged by another train. Once the train is immobilized, the driver needs to read the plate in order to determine what to do. For example:

  • if the signal has the "PR" plate, the driver may proceed if instructed to do so or after waiting a certain amount of time (usually 15 minutes).
  • if the signal has the "F" plate, or if it has the "Nf" plate and has a small white light (œilleton) lit, the driver may proceed.

In either case, a driver passing a red light must advance carefully at a maximum speed of 30 km/h until they reach the next signal that doesn't have an "A" or "D" plate.

SemaphoreM.PNG
Semaphore Cli A BAL F.gif Flashing red (one flashing red light): proceed no faster than 15 km/h.

The flashing red aspect is a variant of the semaphore: a driver may pass the signal with caution at a speed which allows the train to stop at any obstruction, at a maximum speed of 15 km/h after the signal.

not used
Av R BAPR BM.svgAv A BAL F.svg Distant (one yellow light): expect stop.

The distant signal warns the driver to be able to stop before the next signal. Distant signals are used with the carré, the flashing red, the semaphore, and with a signal which is accidentally not working or a buffer stop.

AvertissementM.PNG
JCli A BAL F.gif Flashing yellow (one flashing yellow light): proceed, expect stop at short distance from next Distant signal.

Flashing yellow warns of an obstruction at a reduced distance from the signal, i.e. less than the usual braking distance.

not used
VL R BAPR BM.svgVL A BAL F.svg Block free (one green light): proceed.

The green aspect indicates that the driver may proceed normally, if there is no reason not to do so.

not used
R30 F BAL F.svg Slow 30 (two horizontal yellow lights): proceed, expect points to pass at reduced speed.

Slow 30 is a distant signal that indicates points in diverging position to be passed at a maximum speed of 30 km/h. It is always followed by a Slow 30/60 reminder.

Slow 30 can be combined with the Flashing yellow signal.

R30+JCli BAL F.gif
Ralentissement30M.PNG
R60 F BAL F.gif Slow 60 (two horizontal flashing yellow lights): proceed, expect points to pass at reduced speed.

Slow 60 is a distant signal that indicates points in diverging position to be passed at a maximum speed of 60 km/h. It is always followed by a Slow 60 reminder.

Slow 60 can be combined with the Flashing yellow signal.

R60+JCli BAL F.gif
not used
RR30 H BAL.svg Slow 30 reminder (two vertical yellow lights): proceed at reduced speed until the train has cleared the points.

Slow 30 reminder signals are used just before one or more points in diverging position to be passed at a maximum speed of 30 km/h.

Slow 30 reminder can be combined with the Distant or Flashing yellow signals.

RappelDeRalentissement30M.PNG
RR60 H BAL.gif Slow 60 reminder (two vertical, flashing yellow lights): proceed at reduced speed until the train has cleared the points.

Slow 60 reminder signals are used just before one or more points in diverging position to be passed at a maximum speed of 60 km/h.

Slow 60 reminder can be combined with the Distant or Flashing yellow signals.

not used
Disque BAPR BM.svg Disk (one yellow light and one red light, both aligned horizontally): slow down and advance carefully to the next signal.

The disk is a delayed halt instruction, i.e. the driver may pass the signal with caution at a speed which allows the train to stop at any obstruction, but must stop at the next platform or points (even if the signal aspect would allow him to proceed). The driver can continue after receiving a verbal instruction.

DisqueM.PNG
Signals mainly used on sidings
CV A BAL.svgCV Sol.svg Violet carré (one violet light): stop.

Equivalent to the carré, it is used on sidings, to control access to the main line.

CarreVioletM.PNG
M A BAL.svgM Sol.svg White (one white light): proceed at reduced speed for shunting.

The white aspect indicates that the driver is allowed to proceed for shunting, keeping to 30 km/h over points.

not used
MM A BAL.gif Flashing white (one flashing white light): proceed at reduced speed for shunting over a short distance.

The flashing white aspect indicates that the driver is allowed to proceed for shunting over a short distance. It does not allow the train to depart on the main line.

not used
GuidonArret.PNG Guidon d'arrêt (stop bar)

The guidon d'arrêt is used to protect certain manoeuvres, instead of hand signals. This signal is an order to halt.

GuidonArretM.PNG
Special signals
PermCancelled H BAL.svg Signal permanently cancelled (saltire in front of the signal): disregard the signal.

The white cross indicates that the signal is permanently cancelled and must not be taken into account.

not used
TmpCancelled H BAL.svg Signal temporarily cancelled (saltire): disregard the signal.

On Paris' RER A, wayside signals may be disabled at some places when trains are equipped with in-cab signalling.

not used

Speed limits

Sign
Meaning
TIVD80.PNG or TIVDCro40.PNG
Speed limit.

The lozenge indicates that the signal is equipped with an in-cab repeater.

Schéma de signalisation ferroviaire- Pancarte "Z".png
Start of a Zone with a speed limit.
R(panneau).PNG
End of a zone with a speed limit. (Reprise de vitesse).

Shunting

Sign
Meaning
Schéma de signalisation ferroviaire- Pancarte "G".png
The train is being directed to a siding (voie de Garage).
Schéma de signalisation ferroviaire- Pancarte "D".png
The train is being directed to a Dépôt.
Imp.PNG
The train is being directed to a dead end Impasse.
LM in white letters on black background.png
Point not to be passed during shunting (Limite de Manœuvre).

Stopping points in stations

Sign
Meaning
Schéma de signalisation ferroviaire, Pancarte "TT".png
Stopping point for the front of the train (Tête de Train), however many carriages are in the train.
XV.PNG
Stopping point for trains made up of the number of carriages indicated on the sign (here 12 cars).
TGVx.PNG
Stopping point for TGVs.

The number indicates the number of rakes.
single rake = 1 ; double rake = 2

Indications for electric locomotives

Sign
Meaning
Sectionnement.PNG
Change of electrical section (change of voltage).
DebCC.PNG
Beginning of a neutral zone (without electric power); electric locomotives must pass with the main circuit breaker open and pantograph lowered.
FinCC.PNG
End of a neutral zone; electric locomotives can close the main circuit breaker open and raise the pantograph.
FinCatenaire.PNG
End of the catenary: beyond this sign, the line is no longer electrified and only non-electric locos can continue.

Other signs

Sign
Meaning
Schéma de signalisation ferroviaire- Pancarte "S".png
Drivers must use the whistle or horn (Sifflet ou klaxon). Used before level crossings without automatic signals or zones with limited visibility.
Annonce.PNG
Stop ahead.
Gabarit.PNG
Zone with reduced loading gauge (bridge, tunnel).

Cab signalling

<templatestyles src="Module:Hatnote/styles.css"></templatestyles>

With the arrival of the TGV, and its operating speeds well over 200 km/h, trackside signalling had to be abandoned in favour of cab-signalling, using track to cab communication.

ETCS

<templatestyles src="Module:Hatnote/styles.css"></templatestyles>

This system is intended to replace the different national signalling systems.

Bibliography

  • Lua error in package.lua at line 80: module 'strict' not found.
  • Lua error in package.lua at line 80: module 'strict' not found.
  • Lua error in package.lua at line 80: module 'strict' not found.
  • Lua error in package.lua at line 80: module 'strict' not found.

External links