This is a good article. Click here for more information.

GO Transit

From Infogalactic: the planetary knowledge core
(Redirected from GO train)
Jump to: navigation, search

<templatestyles src="Module:Hatnote/styles.css"></templatestyles>

GO Transit
GO Transit logo.svg
350px
Overview
Owner Government of Ontario (through Metrolinx)
Locale Golden Horseshoe
Transit type Commuter rail
Intercity bus service
Number of lines 7
Number of stations 68 rail
15 bus + numerous stops[1]
Daily ridership 276,500 (all modes)[1]
  • 215,500 (train)
  • 61,000 (bus)
Annual ridership 71.7 million (2018)[2]
Chief executive Phil Verster, President & CEO, Metrolinx[3]
Ian Smith, Chief Operating Officer[3]
Headquarters Toronto, Ontario, Canada[4]
Website www.gotransit.com
Operation
Began operation May 23, 1967; 56 years ago (1967-05-23)[1]
Operator(s) Alstom
Reporting marks GOT
Host railroads Canadian National Railway
Canadian Pacific Railway
Metrolinx
Number of vehicles 80 locomotives
949 passenger coaches
517 buses[2]
Technical
System length 526 kilometres (327 mi) (rail)
2,776 kilometres (1,725 mi) (bus)[1]
Track gauge 1,435 mm (4 ft 8 12 in) standard gauge
System map

320px Note: Bloomington, Stratford, St. Marys, and London is not shown on the map.

GO Transit is a regional public transit system serving the Greater Golden Horseshoe region of Ontario, Canada. With its hub at Union Station in Toronto, GO Transit's distinctive green and white commuter rail trains and coach-style buses serve a population of more than seven million across an area over 11,000 square kilometres (4,200 sq mi) stretching from London in the west to Peterborough in the east, and from Barrie in the north to Niagara Falls in the south. GO Transit carried 71.7 million passengers in 2018, and its ridership continues to grow.[5][2] GO Transit operates diesel-powered double-decker trains and coach buses, on routes that connect with all local and some long-distance inter-city transit services in its service area.[1]

Canada's first regional public transit system, GO Transit began regular passenger service on May 23, 1967, as a part of the Ontario Ministry of Transportation. Since then, it has grown from a single train line to seven, and expanded to include complementary bus service.[1] GO Transit has been constituted in a variety of public-sector configurations, today existing as an operating division of Metrolinx, a provincial Crown agency with overall responsibility for integrative transportation planning within the Greater Toronto and Hamilton Area.[6]

<templatestyles src="Template:TOC limit/styles.css" />

History

<templatestyles src="Module:Hatnote/styles.css"></templatestyles>

Early days

Cities in and around the Greater Toronto and Hamilton Area (GTHA) expanded greatly during the 1950s, influenced by growth in immigration and industrialization. Much of the existing commuter service was provided by the Canadian National Railway, which faced mounting pressure to expand its service beyond Lakeshore trains it ran between Hamilton in the west and Danforth in the east, to Toronto; however, CN lacked the financial and physical capital to do this. Real improved commuter service was not considered until the 1962 Metropolitan Toronto and Region Transportation Study, which examined land use and traffic in the newly created Metropolitan Toronto. The idea of GO Transit was created out of fear of becoming lost in years of planning; it was "approached as a test, but recognized to be a permanent service."[7] In May 1965, the Government of Ontario granted permission to proceed with the launch of Canada's first specially-designed commuter rail service, at a cost of $9.2 million ($69.4 million in 2021 dollars).[8]

Creation, growth and recession

GO Transit trains in the 1960s and 1970s, prior to the predominance of the Bombardier BiLevel Coach.

Government of Ontario Transit (later shortened to "GO Transit") started as a three-year long experiment on May 23, 1967, running single-deck trains powered by diesel locomotives in push-pull configuration on a single rail line along Lake Ontario's shoreline.[9][10] GO Train service ran throughout the day from Oakville to Pickering with limited rush hour train service to Hamilton. The experiment proved to be extremely popular; GO Transit carried its first million riders during its first four months, and averaged 15,000 per day soon after. This line, now divided as the Lakeshore East and Lakeshore West lines, is the keystone corridor of GO Transit.[9] Expansion of rail service continued in the 1970s and 1980s, aimed at developing ridership in with the introduction of the Georgetown (now Kitchener) line in 1974 and the Richmond Hill line in 1978.[11][12] The Milton GO Train line opened in 1981, followed by the Bradford (now Barrie) and Stouffville lines a year later, establishing GO Transit's present-day service of seven rail corridors.[12]

Older cab control car of a GO Train with a view of the CN Tower in the background

Other than establishing new rail corridors, GO Transit introduced the Bi-Level coaches in 1979, in order to increase the number of passengers carried per train. These unique rail cars were developed in partnership with Bombardier Transportation.[13] In that same year, the former Bay Street GO concourse at Union Station was built to accommodate these additional passengers. GO Bus service also started on September 8, 1970, extending the original Lakeshore line to Hamilton and Oshawa, as well as providing service north to Newmarket and Barrie. It eventually became a full-fledged network in its own right after 1989, feeding rail service and serving communities beyond the reach of existing trains.[14]

Near the end of 1982, Ontario Minister of Transportation and Communications James W. Snow announced the launching of GO-ALRT (Advanced Light Rail Transit), an interregional light rail transit program providing $2.6 billion (1980 dollars) of infrastructure.[15] Although this plan did not come to fruition, certain key objectives from it were established in other ways: additional stations were built, all-day service to Whitby and Burlington was established and networks of buses and trains interconnected the network.[15]

GO extended limited rush hour train service on the Bradford, Georgetown and both Lakeshore lines and began offering off-peak service on the Milton line in 1990. Train service was also extended to Burlington on the Lakeshore West line in 1992.[9][11][16] In a series of cost-cutting measures, then-Ontario Premier Bob Rae announced a "temporary" reduction in spending on services, causing all of the expansions of the 1990s to be reduced or eliminated.[16]

Reconfiguration and revival

All day train service was restored from Burlington to Whitby, and peak service was finally brought to Oshawa in 2000, but this would be only one indicator of things to come. A large initiative to expand the GO Transit network in the mid-2000s under the GO Transit Rail Improvement Plan, or GO TRIP. $1 billion was invested in multiple rail and bus projects, making it the largest commuter rail project in Canadian history.[17][18] This was later dwarfed by a further slate of new GO infrastructure proposed in MoveOntario 2020, the provincial transit plan announced by Premier Dalton McGuinty in the leadup to the 2007 provincial election. With significant re-investment in regional transit, GO experienced significant growth in its train network: all day service was restored to Oshawa in 2006 and Aldershot in 2007; service was expanded to Barrie South in 2007, to Lincolnville in 2008 and to Kitchener in 2011;[19] and an excursion train now operates on summer weekends to Niagara Falls. This service was later expanded to all year round.[20]

GO Transit also went through three major reconfigurations. In January 1997, the province announced it would transfer funding responsibility for GO Transit to GTHA municipalities. The Greater Toronto Services Board, composed of regional municipality chairs, city mayors and municipal councillors, was created as a municipal agency in January 1999, and GO Transit was transferred as an arm of this agency in August 1999. However, then-Premier Mike Harris announced the province would re-assume funding responsibility for GO Transit two years later, and this was completed with the abolition of the Greater Toronto Services Board on January 1, 2002.[21][22][23] The Greater Toronto Transportation Authority was created in 2006, with the responsibilities of co-ordinating, planning, financing and developing integrated transit in the GTHA. This agency would then become merged with GO Transit in 2009 under the name Metrolinx. GO Transit would continue as an operating division alongside two other major initiatives: the Union Pearson Express and Presto card.

The 'Georgetown South' project involves expanding tracks shared by trains on the Barrie, Georgetown and Milton lines, as well as the Union Pearson Express.

Future

As part of the 2011 provincial election, Premier Dalton McGuinty made a campaign pledge to provide two-way, full-day train service on all corridors.[24] Metrolinx is continuing to move forward with planning for this service expansion, which is now known as Regional Express Rail, in likeness to the service of a similar name in France.[25] Part of Metrolinx's Big Move regional transportation plan, it is estimated to cost $4.9 billion and serve 30 million additional riders by 2031.[26] Other possible future rail service extensions identified in GO Transit's 2020 plan include Niagara Region, Bolton, Brantford, Peterborough and Uxbridge.[27] Metrolinx also announced plans in January 2011 to electrify the Lakeshore West, Lakeshore East and Kitchener rail lines, as well as the Union Pearson Express.[28]

In 2021, Metrolinx announced a pilot service to London, Ontario, with one train towards Toronto in the morning, and one train returning to London in the evening.[29]

Improvements are being made to Union Station, which is the busiest passenger transportation facility in Canada, and is expected to have its current passenger traffic double in the next 10 to 15 years.[30] Improvements currently underway include a new roof and glass atrium covering the platforms and railway tracks, new passenger concourses, additional staircases and vertical access points and general visual improvements to the station.[31][32] Other longer term options such as a second downtown station and/or connections to a future Relief Subway Line are also being studied to meet future demand.[33]

Service

Service area

Approximate service area of GO Transit in the Golden Horseshoe region of Southern Ontario

GO Transit primarily serves the Greater Toronto and Hamilton Area–the cities of Toronto and Hamilton and the surrounding regions of Halton, Peel, York and Durham. GO Transit's lines extend into the nearby Niagara and Waterloo Regions, the cities of Brantford and Peterborough, and Simcoe, Dufferin and Wellington Counties–[1] an area largely coextensive with the Greater Golden Horseshoe. Under the provincial charter, GO Transit is permitted to serve cities elsewhere in Ontario, but has no plans of doing so.

In total, GO trains and buses serve a population of 7 million in a 11,000 square kilometres (4,200 sq mi) area radiating in places more than 140 kilometres (87 mi) from downtown Toronto. Present extrema are Brantford and Kitchener to the west; Orangeville, Barrie and Beaverton to the north; Peterborough and Newcastle to the east; and Niagara Falls to the south.[1]

The GO system map shows seven train lines (or corridors), all departing from Toronto's Union Station and mostly named respectively after the outer terminus of train service. Although colours are assigned in a consistent fashion to each line in all official media, in colloquial parlance lines are only ever referred to by their names. Buses are numbered in blocks of 10, corresponding to the nearest train line, with the 40s and 50s reserved for express services along the 407 ETR corridor which does not have a corresponding train line.

File:Hamilton GO train.jpg
A GO train stationed at the Hamilton GO centre on the Lakeshore West line, during off peak hours.
GO Lakeshore West logo.svg Lakeshore West (to Hamilton and Niagara Falls, with buses to Brantford)
GO Milton logo.svg Milton (to Milton)
GO Kitchener logo.svg Kitchener (pilot service to London starting October 18, 2021)
GO Barrie logo.svg Barrie
GO Richmond Hill logo.svg Richmond Hill (to Oak Ridges)
GO Stouffville logo.svg Stouffville (to Lincolnville, with buses to Uxbridge)
GO Lakeshore East logo.svg Lakeshore East (to Oshawa, with buses to Newcastle and Peterborough)

Operations

Rail

<templatestyles src="Module:Hatnote/styles.css"></templatestyles>

A GO Train along the Lakeshore West line.

GO Transit's commuter rail services (reporting mark GOT) carry the large majority of its overall ridership. Until 2012, five GO Train lines operated only during weekday rush hour periods in the peak direction (inbound towards Union Station in the morning and outbound in the afternoons and early evenings), with off-peak service on these routes being provided solely by buses. Since then, partial off-peak train service has been added to three of these lines. The present off-peak service is as follows:

  • the Lakeshore West and Lakeshore East lines operate half-hourly trains on weekdays off-peak hours and weekends, with weekend service on Lakeshore West extending as far as Niagara Falls. Nearly all trains on the two lines are through-routed, making it possible to travel between Aldershot (or Niagara Falls) and Oshawa without having to change trains at Union Station. They are to date the only lines with all-day train service 7 days a week.
  • the Kitchener line provides hourly, two-way midday and late evening service as far as Mount Pleasant station in Brampton on weekdays only, with two off-peak weekday trains going all the way to Kitchener. There is also one daily round trip to London, Ontario. There is no weekend service.
  • the Barrie line has all-day weekday and weekend train services along the entire line, although most of them only go as far as Aurora
  • the Stouffville has hourly midday and late evening service as far as Mount Joy on weekdays only and hourly weekend service in both directions

The Richmond Hill and Milton lines continue to operate during rush hours only, although there has been an increasing number of trips on these lines in recent years. As part of the Regional Express Rail plan, there are plans to eventually offer two-way, all-day 15-minute service on the central sections of the remaining five lines.[34] Nevertheless, rush-hour service accounts for over 90 per cent of GO Train ridership.[1]

Rolling stock

GO Transit's rolling stock uses push-pull equipment. Its passenger car fleet is composed entirely of Bombardier BiLevel Coaches built in Thunder Bay, Ontario.[35] These double-decker coaches, easily identifiable by their elongated-octagon shape, were designed in the mid-1970s for GO Transit by Hawker Siddeley Canada as a more efficient replacement for GO's original single-deck coaches, built by the same company. Later coaches were manufactured by Can-Car/UTDC and the most recent coaches are produced by Bombardier Transportation, who now owns the designs and manufacturing facilities. GO Transit owns approximately 700 BiLevel Coaches, which are also used by a number of other commuter railways across North America. They have a seating capacity of 162 people per coach, or 1,944 per train.[36] All upper levels of the coaches on rush hour trains are designated "Quiet Zones".[37]

An MP40PH-3C locomotive.

The coaches are primarily hauled by MPI MPXpress series locomotives. The current model, the 4000-horsepower MP40PH-3C, is more powerful than their predecessors, the EMD F59PH. They are capable of pulling or pushing trains of 12 coaches instead of 10.[36] More than 60 of these locomotives have been ordered since their introduction in 2006, with a further 16 types of an even more powerful model, the 5400-horsepower MP54AC, to enter service in coming years. Opposite the locomotive, trains are bookended by cab cars, which are coaches with driver controls incorporated into them. While most of them closely resemble ordinary coaches, GO Transit began upgrading their rail fleet with newly designed, more crashworthy cab cars in the summer of 2015, incorporating an improved visibility, safety features and comfort for train crews.[38]

Rolling stock is maintained at the Willowbrook Rail Maintenance Facility, located west of Mimico station in Toronto and also at the newer Whitby Rail Maintenance Facility. The Willowbrook facility occupies the Willowbrook Yard, a historical freight yard established by Grand Trunk Railway in 1910. GO Transit acquired the Willowbrook Yard from Canadian National sometime after its inception, and built and expanded the Willowbrook facility onsite to maintain the expanding fleet.[39] GO Transit built a second maintenance facility covering 500,000 square feet (4.6 hectares) in Whitby to accommodate additional trains for its upcoming Regional Express Rail project, and was completed by the end of 2017.[40]

Ownership and crews

GO has always owned its locomotives and coaches, but its trackage used to be owned entirely by Canada's two major commercial railways: the large majority by the Canadian National Railway (CN) and the remainder (the current Milton line) by Canadian Pacific Railway (CP). In 1988, as part of expanding service east of Pickering, GO built its first section of self-owned purpose-built trackage.[41] From 1998 until 2009, GO owned only six per cent of the railway trackage on which it operated. Starting in 2009, Metrolinx incrementally acquired further trackage from the two commercial railways in order to improve GO service. As of 2014, Metrolinx has complete ownership of the Barrie, Stouffville and Lakeshore East lines, and a majority of the Lakeshore West, Richmond Hill, and Kitchener lines. CP still owns most of the Milton line. This puts Metrolinx ownership at 69 per cent of GO Transit's trackage.[42]

File:GO CSA points at Rouge Hill.jpg
A Customer Service Ambassador points at the doors after closing them at Rouge Hill Station for safety.

Each train runs with a three-person crew: two operators control the train from the cab at the front end of the train and handle related operations, while a third crew member is the Customer Service Ambassador. Stationed in a designated car in the middle of each train, the Customer Service Ambassador operates the doors and wheelchair ramp, makes station stop announcements, and is dedicated to assisting customers on board.[43] Alstom Transport is responsible for providing train operations, taking over from Bombardier Transportation in 2021.[44] GO trains achieve on-time performance of approximately 95 per cent,[45] and a refund will be provided if a train is more than 15 minutes late, with some conditions.[46]

Bus

<templatestyles src="Module:Hatnote/styles.css"></templatestyles>

Thousands of passengers move between GO and TTC service at Union Station on Toronto's Front Street

GO Bus service consists of a combination of routes, many of which stand in for train service when it is not operating and/or which extend the reach of train service to communities beyond their terminal. Other GO buses are independent of rail services, such as the Highway 407 series of routes, which provides an orbital-type service that encircles Toronto proper and makes connections between all train lines. There are also routes that serve Pearson International Airport, seasonal destinations such as several colleges and universities. The vast majority of GO train stations have connecting GO bus service, of which almost all the exceptions are situated within Toronto proper. There are also 16 bus terminals served by GO buses, many of which provide local transit connections, as well as intermediate stops and ticket agencies.[1][47]

The first buses operated by GO Transit, a suburban variant of the GM New Look bus, were unveiled at Queen's Park on August 11, 1970, about a month before commencing operations on its expanded services east, west and north of Toronto.[48] Operated by Gray Coach,[49] a pilot program to test them was conducted in Pickering before they entered service on 8 September 1970.[50] Later buses included a combination of single-door, suburban-type transit buses built by Orion Bus Industries and New Flyer, and single-level highway coaches built by Prevost Car and Motor Coach Industries (MCI, now a subsidiary of New Flyer).

Today, GO Transit operates a combination of single-level coach buses and commuter-type double-decker buses. All buses are equipped with bike racks and are wheelchair accessible. Most of the older buses in the fleet are 45-foot (13.72 m), single-level D4500CT coach buses built by Motor Coach Industries, which can seat 57 people and features a wheelchair lift for disabled users. The first models of this type entered service in 2001 and orders have continued until 2015. In April 2008, GO began operating 43-foot (13.11 m) Enviro 500 double-decker buses built by British manufacturer Alexander Dennis in the United Kingdom.[51] These buses come in three different designs differing mainly in their size and height. All double deckers have a low-floor design and a wheelchair ramp at the front door.

The first two batches of double deckers have a height of Lua error in Module:Convert at line 1851: attempt to index local 'en_value' (a nil value)., too tall to meet many height standards set by the provincial Ministry of Transportation. Thus, they are restricted to routes which avoid low bridges and underpasses. In particular, they are found exclusively on routes on the Highway 407 and Highway 403 corridors, providing service between Peel and York Regions.[52][1]

In 2012, GO ordered new Enviro500 double-decker units for its fleet. Designated as "Go-Anywhere" models, they have a redesigned front end, based on the Enviro400 (and which would later form the basis for the global Enviro500 MMC refreshed design), and a height of Lua error in Module:Convert at line 1851: attempt to index local 'en_value' (a nil value)., Lua error in Module:Convert at line 1851: attempt to index local 'en_value' (a nil value). lower than the previous models. The lower height allows these buses to meet many more clearance standards as a result and are used on a wider variety of routes, including those that travel on Highway 401.[53] Three additional batches of "Go-Anywhere" Enviro500s were ordered until 2015.

Despite the lower height, these buses are still too high to fit in a number of GO terminals, namely Hamilton, Yorkdale, York Mills, and Union Station. Beginning in 2016, GO Transit began placing further orders of Enviro500 double-deckers. These buses, designed specifically for the GO Transit network and designated as "Super-Lo", have an even lower height of Lua error in Module:Convert at line 1851: attempt to index local 'en_value' (a nil value)., low enough to operate on virtually the entire GO bus network.[54] They also have a longer length than previous orders, being 45-foot (13.72 m) long (the same as its coach buses), and dedicated space for luggage at the rear. The chassis for these vehicles are being locally assembled at a newly established facility in Vaughan, creating up to 30 new full-time jobs.[54]

Stations and connections

<templatestyles src="Module:Hatnote/styles.css"></templatestyles>

GO Transit stations are designed to provide seamless and barrier-free connections between its trains and buses. They include amenities such as elevators, washrooms, parking, pay phones, ticket vending machines, ticket sale kiosks and automated teller machines. All GO stations have Presto card readers. Most bus terminals are also served with a ticket sales booth or vending machine. As of 2016, the capital costs of building a GO Transit train station is about $50 to $75 million.[55]

Most GO stations include large commuter parking lots, some of which have recently included large parking structures, and also include onsite bus loops for buses making timed connections to GO Buses.

Some GO train stations are shared with Union Pearson Express (commuter train services from Toronto Union Station to Pearson Airport), Via Rail (Canada's national passenger rail services) and Amtrak (which offers passenger train service to the United States). GO also connects with fifteen other municipal transit providers, such as the Toronto Transit Commission (TTC) and York Region Transit (YRT), as well as several long-distance intercity bus services, such as Ontario Northland, Megabus, TOK Coachlines and United States-bound Greyhound services. Metrolinx calls many of these transfer points between services mobility hubs, and it has made them a priority as it moves forward with The Big Move regional transportation plan.

Ridership

GO Transit Annual Ridership (2017)[1][56]
Corridor Riders  %
Lakeshore West 17.7 million 25.8% <div style="background:#Lua error in package.lua at line 80: module 'strict' not found.; width:116px; color:white; text-align:center; font-weight:bold; overflow:hidden; display:inline-block;">  <div style="background:#Lua error in package.lua at line 80: module 'strict' not found.; width:61px; color:white; text-align:center; font-weight:bold; overflow:hidden; display:inline-block;">  
Lakeshore East 13.7 million 20.0% <div style="background:#Lua error in package.lua at line 80: module 'strict' not found.; width:90px; color:white; text-align:center; font-weight:bold; overflow:hidden; display:inline-block;">  <div style="background:#Lua error in package.lua at line 80: module 'strict' not found.; width:47px; color:white; text-align:center; font-weight:bold; overflow:hidden; display:inline-block;">  
Kitchener 8 million 11.7% <div style="background:#Lua error in package.lua at line 80: module 'strict' not found.; width:51px; color:white; text-align:center; font-weight:bold; overflow:hidden; display:inline-block;">  <div style="background:#Lua error in package.lua at line 80: module 'strict' not found.; width:29px; color:white; text-align:center; font-weight:bold; overflow:hidden; display:inline-block;">  
Milton 7 million 10.2% <div style="background:#Lua error in package.lua at line 80: module 'strict' not found.; width:70px; color:white; text-align:center; font-weight:bold; overflow:hidden; display:inline-block;">  
Barrie 4.6 million 6.7% <div style="background:#Lua error in package.lua at line 80: module 'strict' not found.; width:45px; color:white; text-align:center; font-weight:bold; overflow:hidden; display:inline-block;">  <div style="background:#Lua error in package.lua at line 80: module 'strict' not found.; width:1px; color:white; text-align:center; font-weight:bold; overflow:hidden; display:inline-block;">  
Stouffville 3.9 million 5.7% <div style="background:#Lua error in package.lua at line 80: module 'strict' not found.; width:32px; color:white; text-align:center; font-weight:bold; overflow:hidden; display:inline-block;">  <div style="background:#Lua error in package.lua at line 80: module 'strict' not found.; width:7px; color:white; text-align:center; font-weight:bold; overflow:hidden; display:inline-block;">  
Richmond Hill 2.5 million 3.6% <div style="background:#Lua error in package.lua at line 80: module 'strict' not found.; width:25px; color:white; text-align:center; font-weight:bold; overflow:hidden; display:inline-block;">  
Total - GO Rail System 57.4 million
Bus 11.1 million 16.2% <div style="background:#Lua error in package.lua at line 80: module 'strict' not found.; width:111px; color:white; text-align:center; font-weight:bold; overflow:hidden; display:inline-block;">  
Total 68.5 million

On an average weekday, GO runs 322 train trips carrying 206,167 riders, and 2,386 bus trips carrying 48,477 passengers. This adds up to 254,644 passengers throughout the entire system.[1] In 2017, GO Transit ridership totalled 68.5 million, and if expansion plans are realized, is projected to total over 200 million by 2055.[1][56]

At least 91 per cent of the train ridership is to and from Union Station in downtown Toronto, while about 70% of all bus passengers travel to and from the City of Toronto.[1] The average trip taken by a passenger is 33.5 kilometres (20.8 mi) long. The majority of GO Transit commuters have a private vehicle available to them for their commute, but choose to use GO Transit instead. About 80% of train commuters, and 60% of bus commuters choose GO Transit over driving.[27] Over half of GO's ridership occurs on the Lakeshore West and East lines, which can be attributed to the almost continuous development along their corridors, as well as being the only two lines with two way, all day service since their inception. This is followed by the Milton line, carrying almost 14% of all ridership. Other corridors carry 4–11% of riders each.[57]

Fares

A train information board at Long Branch GO Station

<templatestyles src="Module:Hatnote/styles.css"></templatestyles>

Fares on the network are based on a zone tariff set between two specified points by GO Transit, and the type of passenger using the ticket.[58] Passenger categories exist for adults, students, seniors and groups. Tickets are also sold for single trip, or passes for one day or one month.[59] Tickets can be used on a GO train, bus, or a combination of both. They can be purchased at train stations, bus terminals, ticket agencies, or on GO buses.[58] As of March 9, 2019, passengers under the age of 12 can ride GO Transit for free.[60]

The Presto card, available on all GO trains and buses,[61] is a unified smart card-based payment system used throughout the Greater Toronto and Hamilton Area. Presto is a sister operating division of Metrolinx and the card can also be used on numerous local transit agencies in the GTHA.[62] Discounted fares are available for passengers who use local transit to connect with a GO bus or train.[58]

The Presto system allows passengers to load a reloadable card with any amount starting at $10, up to $1,000. Passengers pay their fare by "tapping" on and off on busses and trains. With each tap, the system calculates the fare for the ride, and it is deducted from the balance of the card. The card can also be linked to a credit card and set on autoload, so that it automatically adds a certain amount of money as soon as the balance decreases past a certain level (e.g., setting it to add $100 every time the balance decreases to less than $25).[63]

GO Trains use a "proof-of-payment" policy where the fare system is run on an "honour system" and passengers are expected to carry a paper ticket or Presto card to prove that they paid for their fares. To increase compliance, passengers may be subject to random fare inspections at any time during travel. This system is designed to reduce costs and improve efficiency. Enforcement of this system is carried out via Metrolinx's By-law No. 2 that, by reference to the Provincial Offences Act, imposes a $100 fine for fare evasion.[64][65]

The GO logo and colours were adjusted in 2013.

The GO Transit logo has remained largely unchanged since the agency was founded. The design was created by Gagnon/Valkus, a Montreal-based design firm that was also responsible for the corporate identities of Canadian National and Hydro-Québec.[66][67] The firm's team wanted to create a unified logo using the initials of the Government of Ontario ("GO"), via two circles with a T incorporated into it. Lead designer Frank Fox described the creation of the logo as "a happy accident. More or less, we had this feeling among us that this couldn't be true. We went off trying many other solutions, but nothing else was good enough."[8][66]

The logo has since become woven into the cityscape of Toronto, and is a prominent identifier of the agency. As one graphic design expert stated, it achieved "an enviable goal that most graphic designers strive to accomplish with any logo they design". Only one minor revision was made after the original version was unveiled: while the G and O used to touch each other, a gap now exists with a bolder white T to enhance them.[66] The primary corporate colour was known as "GO Green", matched the green on Ontario Highway signs, and was used on all vehicles, signage, and printed material. In 2013, GO introduced a two-tone colour scheme that changed the primary colour to a darker green, and added a second lighter apple green. The changes were made to better harmonize with the branding of Metrolinx and its other operating divisions, as well as to improve its display digitally.[68][69][70]

Safety and security

By-law No. 2

GO Transit By-law No. 2 is a document of rules and regulations governing actions of passengers and employees while on GO Transit property, which includes land, facilities, trains, buses and other structures. Besides issues relating to fares, the by-law specifies permissible and prohibited actions such as staying in designated safe areas, commercial or distribution activities, parking and other personal actions that promote or endanger the safety of passengers. It covers items like paying fares, parking, general behaviour, fines and rule enforcement. These rules can be enforced by a "proper authority" which is defined as "an employee or agent of GO Transit wearing a GO Transit uniform [or] carrying an identification card issued by GO Transit, a GO Transit Special Constable, or a municipal police officer." Any contravention of the by-law can result in a fine under the Provincial Offences Act.[64]

Enforcement

Shoulder flashes for GO Transit Safety Officers.

GO Transit employs Transit Safety Officers, who are designated special constables that patrol Metrolinx properties, and are responsible for ensuring passenger safety and protection, enforcing relevant laws or by-laws, offering customer assistance and supporting local police, fire and ambulance, and promoting railway safety.[71] Under the Police Services Act, Transit Safety Officers are appointed by the Commissioner of the Ontario Provincial Police, with approval from the Minister of Community Safety and Correctional Services.[72] In addition to By-law No. 2, they have the authority to enforce other certain federal and provincial laws.[71]

GO Transit also employs Provincial Offences Officers, known as Revenue Protection Officers, to enforce the proof-of-payment system.[73] GO Transit operates a 24-hour Transit Safety Communications centre operated by Communications Operators. They are mainly responsible for taking calls from the public with regards to actionable complaints, dispatching special constables or relevant emergency services to all areas serviced by Metrolinx.[71]

Incidents

On December 12, 1975, a westbound GO train collided with a Toronto Transit Commission (TTC) bus that was stalled on a crossing at St. Clair and Midland Avenue. Nine passengers on the bus were killed and 20 others were injured. This was the worst accident in terms of loss of life in the history of the TTC and GO Transit systems. The level crossing was replaced by an overpass a few years later.[74]

On November 17, 1997, an empty train collided with another train waiting to depart Union Station with over 800 passengers on board. The empty train's locomotive engineer was at the opposite end of the train, and the conductor at the leading end failed in his attempts to relay the situation to the engineer or apply the emergency brake. The two trains then collided at a speed of 19 km/h (12 mph), causing a partial derailment and minor injuries to fifty-four passengers and two crew members. The subsequent Transportation Safety Board report made recommendations, including making emergency brakes more accessible and that the locomotive engineer must always control the train from the leading end in the Union Station Rail Corridor.[75]

On July 8, 2013, a Richmond Hill-bound GO train encountered flash flooding in the Don Valley when a record-breaking 123 mm rain storm fell over a few hours in Toronto area. As the crew worked to reverse the direction of the train back to Union Station, flood waters continued to rise and submerged the entire track and the train itself began to flood. Approximately 1,400 passengers on board had to be rescued by boat.[76]

On January 14, 2015, a GO bus on Highway 407 near Weston Road hit a guard rail and rolled into a ditch. One passenger was ejected and crushed to death, and another two in addition to the bus driver were injured.[77] On March 2, 2015, the GO Transit driver was charged with careless driving causing death.[78]

See also

References

  1. 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13 1.14 Lua error in package.lua at line 80: module 'strict' not found.
  2. 2.0 2.1 2.2 Lua error in package.lua at line 80: module 'strict' not found.
  3. 3.0 3.1 Lua error in package.lua at line 80: module 'strict' not found.
  4. Lua error in package.lua at line 80: module 'strict' not found.
  5. Lua error in package.lua at line 80: module 'strict' not found.
  6. Lua error in package.lua at line 80: module 'strict' not found.
  7. Sergeant (2004),  Ch.2: Setting the Scene..
  8. 8.0 8.1 Lua error in package.lua at line 80: module 'strict' not found.
  9. 9.0 9.1 9.2 Garcia et al.: Lakeshore corridor
  10. Sergeant (2004),  Ch.4: Buying the trains..
  11. 11.0 11.1 Garcia et al.: Georgetown corridor
  12. 12.0 12.1 Garcia et al.: Regional Transit Routes
  13. Lua error in package.lua at line 80: module 'strict' not found.
  14. Lua error in package.lua at line 80: module 'strict' not found.
  15. 15.0 15.1 Garcia et al.: GO ALRT
  16. 16.0 16.1 Garcia et al.: Bradford corridor
  17. Lua error in package.lua at line 80: module 'strict' not found.
  18. Lua error in package.lua at line 80: module 'strict' not found.
  19. Lua error in package.lua at line 80: module 'strict' not found.
  20. Lua error in package.lua at line 80: module 'strict' not found.
  21. Lua error in package.lua at line 80: module 'strict' not found.
  22. Lua error in package.lua at line 80: module 'strict' not found.
  23. Lua error in package.lua at line 80: module 'strict' not found.
  24. Lua error in package.lua at line 80: module 'strict' not found.
  25. Lua error in package.lua at line 80: module 'strict' not found.
  26. Lua error in package.lua at line 80: module 'strict' not found.
  27. 27.0 27.1 Lua error in package.lua at line 80: module 'strict' not found.
  28. Lua error in package.lua at line 80: module 'strict' not found.
  29. Lua error in package.lua at line 80: module 'strict' not found.
  30. Lua error in package.lua at line 80: module 'strict' not found.
  31. Lua error in package.lua at line 80: module 'strict' not found.
  32. Lua error in package.lua at line 80: module 'strict' not found.
  33. Lua error in package.lua at line 80: module 'strict' not found.
  34. Lua error in package.lua at line 80: module 'strict' not found.
  35. Lua error in package.lua at line 80: module 'strict' not found.
  36. 36.0 36.1 Lua error in package.lua at line 80: module 'strict' not found.
  37. Lua error in package.lua at line 80: module 'strict' not found.
  38. Lua error in package.lua at line 80: module 'strict' not found.
  39. Lua error in package.lua at line 80: module 'strict' not found.
  40. Lua error in package.lua at line 80: module 'strict' not found.
  41. Lua error in package.lua at line 80: module 'strict' not found.
  42. Lua error in package.lua at line 80: module 'strict' not found.
  43. Lua error in package.lua at line 80: module 'strict' not found.
  44. Lua error in package.lua at line 80: module 'strict' not found.
  45. Lua error in package.lua at line 80: module 'strict' not found.
  46. Lua error in package.lua at line 80: module 'strict' not found.
  47. Lua error in package.lua at line 80: module 'strict' not found.
  48. Lua error in package.lua at line 80: module 'strict' not found.
  49. Lua error in package.lua at line 80: module 'strict' not found.
  50. Lua error in package.lua at line 80: module 'strict' not found.
  51. Lua error in package.lua at line 80: module 'strict' not found.
  52. Lua error in package.lua at line 80: module 'strict' not found.
  53. Lua error in package.lua at line 80: module 'strict' not found.
  54. 54.0 54.1 Lua error in package.lua at line 80: module 'strict' not found.
  55. Lua error in package.lua at line 80: module 'strict' not found.
  56. 56.0 56.1 Lua error in package.lua at line 80: module 'strict' not found.
  57. Lua error in package.lua at line 80: module 'strict' not found.
  58. 58.0 58.1 58.2 Lua error in package.lua at line 80: module 'strict' not found.
  59. Lua error in package.lua at line 80: module 'strict' not found.
  60. Lua error in package.lua at line 80: module 'strict' not found.
  61. Lua error in package.lua at line 80: module 'strict' not found.
  62. Lua error in package.lua at line 80: module 'strict' not found.
  63. Lua error in package.lua at line 80: module 'strict' not found.
  64. 64.0 64.1 Lua error in package.lua at line 80: module 'strict' not found.
  65. Lua error in package.lua at line 80: module 'strict' not found.
  66. 66.0 66.1 66.2 Lua error in package.lua at line 80: module 'strict' not found.
  67. Lua error in package.lua at line 80: module 'strict' not found.
  68. Lua error in package.lua at line 80: module 'strict' not found.
  69. Lua error in package.lua at line 80: module 'strict' not found.
  70. Lua error in package.lua at line 80: module 'strict' not found.
  71. 71.0 71.1 71.2 Lua error in package.lua at line 80: module 'strict' not found.
  72. Lua error in package.lua at line 80: module 'strict' not found.
  73. Lua error in package.lua at line 80: module 'strict' not found.
  74. Lua error in package.lua at line 80: module 'strict' not found.
  75. Lua error in package.lua at line 80: module 'strict' not found.
  76. Lua error in package.lua at line 80: module 'strict' not found.
  77. Lua error in package.lua at line 80: module 'strict' not found.
  78. Lua error in package.lua at line 80: module 'strict' not found.

General references

Bibliography

  • Lua error in package.lua at line 80: module 'strict' not found.

External links