GWR 4073 Class

From Infogalactic: the planetary knowledge core
Jump to: navigation, search
GWR 4073 Castle class
300px
5034 Corfe Castle fresh from Swindon Works, 1954.
Type and origin
Power type Steam
Designer Charles Collett
Builder GWR / BR Swindon Works
Build date 1923–1950
Total produced 171
Specifications
Configuration 4-6-0
UIC class 2'Ch4
Gauge 4 ft 8 12 in (1,435 mm) standard gauge
Leading dia 3 ft 2 in (0.965 m)
Driver diameter Lua error in Module:Convert at line 452: attempt to index field 'titles' (a nil value).
Minimum curve 8 chains (530 ft; 160 m) normal,
7 chains (460 ft; 140 m) slow
Length 65 ft 2 in (19.86 m) over buffers
Width 8 ft 11 in (2.72 m)
Height Lua error in Module:Convert at line 452: attempt to index field 'titles' (a nil value).
Axle load 19 long tons 14 cwt (44,100 lb or 20 t)
19 long tons 14 hundredweight (20.0 t; 22.1 short tons) full
Adhesive weight 58 long tons 17 cwt (131,800 lb or 59.8 t)
58 long tons 17 hundredweight (59.8 t; 65.9 short tons) full
Loco weight 79 long tons 17 cwt (178,900 lb or 81.1 t)
79 long tons 17 hundredweight (81.1 t; 89.4 short tons) full
Tender weight 47 long tons 6 cwt (106,000 lb or 48.1 t)
47 long tons 6 hundredweight (48.1 t; 53.0 short tons) full
Fuel type Coal
Fuel capacity 6 long tons 0 cwt (13,400 lb or 6.1 t)
6 long tons 0 hundredweight (6.10 t; 6.72 short tons)
Water cap 3,500 imp gal (16,000 L; 4,200 US gal) - 4,000 imp gal (18,000 L; 4,800 US gal)
Boiler pressure 225 lbf/in2 (1.55 MPa)
Firegrate area 29.36 sq ft (2.728 m2)
Heating surface:
 • Tubes
1,857.7 sq ft (172.59 m2) (Collett)
1,799.5 sq ft (167.18 m2) (Hawksworth)
 • Firebox 162.7 sq ft (15.12 m2) (Collett)
163.5 sq ft (15.19 m2) (Hawksworth)
Superheater 14-element "Swindon" (Collett)
21-element (Hawksworth)
 • Heating area 262.6 sq ft (24.40 m2) (Collett)
295.0 sq ft (27.41 m2) (Hawksworth)
Cylinders Four (two inside, two outside)
Cylinder size 16 in × 26 in (406 mm × 660 mm)
Valve gear Inside cylinders: Walschaerts
Outside cylinders: derived from inside cylinders via rocking bars.
Valve type Piston valves
Performance figures
Tractive effort 31,625 lbf (140.68 kN)
Career
Operators Great Western Railway
British Railways
Power class GWR: D
BR: 7P
Numbers 4073–4099; 5000–5099; 7000–7037.
Axle load class GWR: Red
Withdrawn May 1950 to December 1965
Disposition Eight preserved, remainder scrapped

The 4073 Class or Castle class were 4-6-0 steam locomotives of the Great Western Railway design built between 1923 and 1950.[1] They were designed by the railway's Chief Mechanical Engineer, Charles Collett, for working the company's express passenger trains.

Background

The origins of this highly successful design date back to the Star Class of 1907 which introduced the basic 4-cylinder 4-6-0 layout with long-travel valves and Belpaire firebox that was to become synonymous with GWR express passenger locomotives. The Star class were designed to take the top express trains on the GWR with 61 in service by 1914, but after World War 1 there was a need for an improved design. To meet this need Chief Mechanical Engineer GJ Churchward had in mind an enlarged Star class design with a standard No.7 boiler, as fitted to his GWR 4700 Class express freight 2-8-0 design.[2] However, this combination would have taken the axle load of such a design over the 20 ton limit then set by the civil engineers, and in the end nothing came of the idea.

Design

C. B. Collett succeeded Churchward as Chief Mechanical Engineer of the GWR in 1922 and immediately set about meeting the needs for a new locomotive design that would both supplement the Stars and replace them on the heaviest expresses. Collett's solution was to take the basic layout of the Star with an extended frame and add a newly designed No.8 boiler which was both larger and lighter.[3] The increased amount of steam that this produced allowing an increase in the cylinder diameter from 15 in × 26 in (381 mm × 660 mm) to 16 in × 26 in (406 mm × 660 mm). The extended frame allowed for a side window cab and an increased grate area. The result was an increase in tractive effort to 31,625 lb, and a locomotive that looked attractive and well proportioned while remaining within the 20 ton axle limit.

Production

Unlike the Star class, there was no prototype. Collett was sufficiently confident of the design to place an order with Swindon railway works (Lot 224) for ten locomotives in 1923 although there was a four-month delay between the appearance of the first example, in August 1923 and the second in the December to allow for the correction of any teething problems.[4] Thereafter the remaining eight locomotives came out at regular intervals until April 1924. They were 4073-4082; the number series continuing unbroken from the Star class. The last 12 Star class locomotives, which were built in 1922-23, had been given names of Abbeys in the western area served by the GWR. The new locomotives were named after castles also in the west beginning with 'Caerphilly Castle'. Over the twenty-seven years from August 1923 to August 1950 155 Castles were built new at Swindon Works and a further sixteen were converted from other classes.

New builds

All the new builds were as follows.[5]

Great Western Railway

  • Lot 224: Nos. 4073 - 4082 delivered August 1923 - April 1924.
  • Lot 232: Nos. 4083 - 4092 delivered May to August 1925.
  • Lot 234: Nos. 4093-4099 and 5000 to 5012 delivered May 1926 - July 1927.
  • Lot 280: Nos. 5013-22 delivered June - August 1932.
  • Lot 295: Nos. 5023-32 delivered June - August 1932.
  • Lot 296: Nos. 5033-42 delivered May - July 1933.
  • Lot 303: Nos. 5043-67 delivered March 1936 - July 1937. (Nos. 5043 - 5063 were originally named after Castles, but were renamed in 1937 after Earls)
  • Lot 310: Nos. 5068-82 delivered June 1938 - June 1939. (Nos. 5069 and 5070 were named after Isambard Kingdom Brunel and Sir Daniel Gooch; In 1941 5071-5082 were renamed after war planes used by the Royal Air Force)
  • Lot 324: Nos. 5093-97 delivered June - July 1939.
  • Lot 357: Nos. 5098-99, 7000-7 delivered May - July 1946.

British Railways (Western Region)

  • Lot 367: Nos. 7008-27 delivered May 1948 - August 1949.
  • Lot 375: Nos. 7028-37 delivered May 1950 - August 1950.

These locomotives were built with minimal changes to the dimensions. However, from 5013 Abergavenny Castle there was an alteration to the shape of the front-end casing over the inside cylinders, and from 5043 Earl of Mount Edgcumbe a shorter chimney was fitted.[6] Those built before 1926 were fitted with a standard 3,500 imp gal (16,000 L; 4,200 US gal) tender but thereafter 4,000 imp gal (18,000 L; 4,800 US gal) became standard for the class.

Rebuilds

Between January and September 1924 the only Great Western 4-6-2, No.111 The Great Bear, was officially rebuilt into a member of the Castle Class, although only the 'front portion of the original frames and the number plates were used again but probably little else'. The new locomotive was renamed Viscount Churchill and survived until withdrawal in July 1953.[2]

In April 1925 Star class No. 4009 Shooting Star was likewise rebuilt as a Castle by extending the frames and fitting a new Castle Class boiler and cab. It was renumbered and renamed, 100 A1 Lloyds and was withdrawn in 1950.[7]

In October 1925 a second Star class, No. 4016 The Somerset Light Infantry (Prince Albert's), was similarly converted to a Castle although in this case it retained its name and number.[2] Two further conversions of Stars were undertaken in 1926; Nos. 4032 Queen Alexandra and 4037 The South Wales Borderers retaining their names and numbers and surviving until 1951 and 1962 respectively.

Between 1937 and 1940 a further twelve members of the 'Abbey series' of the Star class (Nos. 4061-72) were rebuilt as Castles, They were allocated new numbers 5083 to 5092 but retained their original names and were withdrawn between 1958 and 1964.

Publicity and Trials

File:GWR 4079 Pendennis Castle at Chester General.jpg
GWR 4079 Pendennis Castle at Chester General station before hauling the return Birkenhead Flyer to Birmingham, 4 March 1967

When introduced they were heralded as Britain’s most powerful express passenger locomotive, being some 10% more powerful than the Stars. The first, No. 4073 Caerphilly Castle, made its debut at Paddington station on 23 August 1923. The choice of 4082 as Windsor Castle proved fortuitous as this locomotive was used to haul the royal train when King George V and Queen Mary visited Swindon Works in 1924, and much publicity was gained when the king was permitted to drive the engine back from the works to the station before the return journey, with the Queen and several high-ranking GWR officers also on the footplate.[6]

During 1924 4073 Caerphilly Castle was exhibited at the British Empire Exhibition at Wembley, alongside Sir Nigel Gresley’s Flying Scotsman. The Great Western declared their engine to be more powerful than its bigger LNER rival, and in terms of tractive effort alone they were entitled to do so. As a result of this GWR General Manager Sir Felix Pole proposed to LNER Southern Area General Manager Alexander Wilson that a trial of the two types should take place via an exchange arrangement.[8] The resulting trials commenced in April 1925 with 4079 Pendennis Castle representing the GWR on the Great Northern main line and 4474 Victor Wild representing the LNER on Great Western tracks. On the first morning Pendennis Castle was to work a 480-ton train from King's Cross to Doncaster, and LNER officials fully expected the smaller, lighter engine to encounter problems climbing Holloway Bank. However railway writer Cecil J. Allen records that the GWR locomotive made a faster start from King's Cross to Finsbury Park than any LNER pacific he had recorded up to that time[8] and over the trial Pendennis Castle kept well within the scheduled time and used less coal, considerably denting LNER pride. For the LNER Victor Wild was compared on the Cornish Riviera Express to 4074 Caldicot Castle and although it kept to time the longer wheelbase of the pacific proved unsuited to the many curves on the Route. Again the GWR took the honours with Caldicot Castle burning less fuel and always ahead of time, this being illustrated on the last 2 days of the trial by gaining 15 minutes on the schedule in both directions.[8]

In 1926, number 5000 Launceston Castle was loaned to the London, Midland and Scottish Railway where it ran trials between London and Carlisle. The locomotive fulfilled the LMS requirements so well that the latter first requested the GWR to build a batch of Castles for use on the West Coast Main Line, and, failing that, a full set of construction drawings. Both proposals were rejected by the GWR Board of Directors. The LMS eventually succeeded in gaining access to the design by recruiting William Stanier, the GWR's Works Manager at their main Swindon railway works to become the new Chief Mechanical Engineer for the LMS.[9]

File:Steaming through Dorchester West.ogv
Nunney Castle steam special passing through Dorchester West on its return from Weymouth to Bath 14 August 2011

Performance

The Castles handled all but the heaviest loads, these being entrusted to the 30-strong King Class, themselves a development of the Castles with an even larger boiler and smaller wheels (6'6" diameter) for both increased tractive effort and to allow for loading gauge clearance.

The Castle class was noted for superb performance overall, and notably on the Cheltenham Flyer during the 1930s: for example, on 6 June 1932 the train, pulled by 5006 Tregenna Castle, covered the 77.25 miles from Swindon to Paddington at an average speed of 81.68 mph start-to-stop (124.3 km at an average speed of 131.4 km/h). This world record for steam traction was widely regarded as an astonishing feat.[6]

Subsequent modification

In 1946 Frederick Hawksworth, Collett’s successor, introduced a higher degree of superheat to the Castle boiler with resulting increased economy in water consumption. From 1956 the fitting of double chimneys to selected engines, combined with larger superheaters, further enhanced their capacity for sustained high-speed performance. In 1958 No. 7018 Drysllwyn Castle, fitted with a double chimney and a four-row superheater, hauled ‘The Bristolian’ express at 100 mph at Little Somerford.

Accidents and incidents

  • On 12 November 1958, a freight train overran signals and was derailed at Highworth Junction, Swindon, Wiltshire. Locomotive No. 5009 Shrewsbury Castle was hauling a newspaper train which collided with the wreckage.[10]

The lowest mileage of a Castle was the 580,346 miles run by 7035 Ogmore Castle between August 1950 and June 1964, the highest mileage of any Castle class was run by 4080 Powderham Castle which totalled 1,974,461 miles in 40 years and 5 months.

Withdrawal

Withdrawal started in the 1950s, with the first 100 A1 Lloyds withdrawn from Old Oak Common in March 1950. The first "new build" Castle, number 4091 Dudley Castle was withdrawn from Old Oak Common, nearly 10 years later in January 1959.

The last three castles to be withdrawn were all allocated to Gloucester shed,[11] with 5042 Winchester Castle and 7022 Hereford Castle withdrawn in June 1965. The last to be withdrawn was Clun Castle in December 1965, which worked the last steam train out of Paddington on 27 November 1965.[12]

List of locomotives

See List of GWR 4073 Class locomotives

Preservation

On 4 March 1967, Nos. 7029 Clun Castle and 4079 Pendennis Castle hauled specials from Banbury and Oxford respectively to Chester, to mark the end of through trains between Paddington and Birkenhead. Eight Castles survive in preservation.

Of the eight Castles to be preserved, six have operated on the main line: nos. 4079 Pendennis Castle, 5029 Nunney Castle, 5043 Earl of Mount Edgcumbe, 5051 Earl Bathurst, 5080 Defiant and 7029 Clun Castle. No. 4073 Caerphilly Castle was given directly to the National Collection upon withdrawal, and no. 7027 Thornbury Castle is currently in ex-Barry Scrapyard condition.

4079 did a small number of railtours on the mainline in her early preservation years before departing for Australia, she was a popular engine on the mainline in both countries and also double headed with 4472 Flying Scotsman during her visit to Australia for the Aus Steam 88 celebrations. She was returned to the UK in 2000 and is currently undergoing restoration at the Didcot Railway Centre.

As of 2016, only 5043 has a valid main line certificate. 7029 and 5029 are due to return to main line traffic in 2016.

Image Number Name Built Renamed Withdrawn Owner Current location Current status
120px
4073
Caerphilly Castle
August 1923
-
May 1960
National Railway Museum
Swindon Steam Railway Museum
On static display
Dscn4066-pendennis-dark-in-shed crop 1200x600.jpg
4079
Pendennis Castle
February 1924
-
May 1964
Great Western Society
Didcot Railway Centre
Undergoing mainline standard overhaul
5029 Nunney Castle Didcot old slide.jpg
5029
Nunney Castle
May 1934
-
December 1963
Jeremy Hosking
Crewe
Undergoing mainline standard overhaul
120px
5043
Earl of Mount Edgcumbe
(Barbury Castle)
March 1936
September 1937
December 1963
Birmingham Railway Museum
Tyseley Locomotive Works
Operational, main line certified
DSCN2101-earl-bathurst crop 1200x600.JPG
5051
Earl Bathurst
(Drysllwyn Castle)
May 1936
August 1937
May 1963
Great Western Society
Didcot Railway Centre
On static display
GWR Castle Class 5080 Defiant.jpg
5080
Defiant
(Ogmore Castle)
May 1939
January 1941
April 1963
Birmingham Railway Museum
Buckinghamshire Railway Centre
On static display
120px
7027
Thornbury Castle
August 1950
-
December 1963
Pete Waterman
Crewe Heritage Centre
Stored awaiting restoration
120px
7029
Clun Castle
May 1950
-
December 1965
Birmingham Railway Museum
Tyseley Locomotive Works
Undergoing mainline standard overhaul

There is now a Haynes Owner's Workshop Manual available.

Models

Hornby Railways currently manufacture a model of the 4073 in OO gauge. The Hornby Dublo brand, then owned by Meccano Ltd, also built "Bristol Castle" (released 1957) for their three-rail system and "Cardiff Castle" for the two-rail system two years later; Wrenn continued the Hornby Dublo model when they took over the range. Airfix/GMR (and later Dapol) also produced an OO model; Tri-ang released a TT gauge model; and Graham Farish (later Bachmann) released N gauge models. Many different prototype examples have been depicted by the various manufacturers.

References

  1. Nock 1980, p. 11
  2. 2.0 2.1 2.2 le Fleming 1953, p. H13
  3. Nock 1980, p. 92
  4. le Fleming 1953, p. H17
  5. le Fleming 1953, p. H17-18
  6. 6.0 6.1 6.2 Lua error in package.lua at line 80: module 'strict' not found.
  7. le Fleming 1953, p. H17-19
  8. 8.0 8.1 8.2 Lua error in package.lua at line 80: module 'strict' not found.
  9. Lua error in package.lua at line 80: module 'strict' not found.
  10. Lua error in package.lua at line 80: module 'strict' not found.
  11. Lua error in package.lua at line 80: module 'strict' not found.
  12. Lua error in package.lua at line 80: module 'strict' not found.
  • Lua error in package.lua at line 80: module 'strict' not found.
  • Lua error in package.lua at line 80: module 'strict' not found.
  • Lua error in package.lua at line 80: module 'strict' not found.
  • Lua error in package.lua at line 80: module 'strict' not found.
  • Lua error in package.lua at line 80: module 'strict' not found.
  • Lua error in package.lua at line 80: module 'strict' not found.

Literature

External links