Grafton and Upton Railroad

From Infogalactic: the planetary knowledge core
(Redirected from Grafton & Upton Railroad)
Jump to: navigation, search
Grafton and Upton Railroad
GraftonUpton EMD GP9 1750.JPG
Grafton and Upton 1750 in North Grafton, MA.
Reporting mark GU
Locale Worcester County, Massachusetts
Dates of operation 1873–present
Track gauge 4 ft 8 12 in (1,435 mm) standard gauge
Previous gauge
originally 3 ft (914 mm) gauge
Headquarters Marlborough, Massachusetts

The Grafton and Upton Railroad (reporting mark GU) is a Class III short line railroad in east-central Massachusetts. This 16.5 mile line connects runs from Grafton to Milford and connects to CSX Transportation lines at both ends. Following a period of decline and neglect, maintenance and repairs began on the line in 2008 in order to return the line to operable condition.[1]

History

The Grafton Centre Railroad was chartered October 22, 1873 and opened August 20, 1874 as a 3 ft (914 mm) narrow gauge[2] connection from Grafton to a junction with the Boston and Albany Railroad at North Grafton. The last narrow gauge train ran on July 9, 1887. The line was converted to 4 ft 8 12 in (1,435 mm) standard gauge on September 1, 1887.

On February 17, 1888, the name was changed to the Grafton and Upton Railroad by an act of the state legislature. An extension to West Upton opened on March 12, 1889, and an extension to Milford opened on May 17, 1890, connecting to the Milford and Woonsocket Railroad, later a line of the New Haven Railroad.

The Upton Street Railway was absorbed in 1902 and named the 'Electric Loop' or 'Upton Loop'. Passenger service on this loop and the main line was provided by cars leased from the Milford and Uxbridge Street Railway.

In November 1894 William F. Draper of the Draper Company was appointed to the Board of Directors. The Draper Company eventually purchased the G&U and operated it as a subsidiary.

Electric operations typically took place during the daytime, while steam locomotives used the tracks during the nighttime hours. The G&U ceased passenger service on August 31, 1928. U.S. Mail service along with Railway Express service ceased in 1952. Electric operations ceased on July 3, 1946 and the railroad dieselized during the 1950s. It was at this time that the whole line was upgraded to a heavier grade of track, the first overhaul since the narrow gauge was replaced in 1887.

The Draper Company sold the G&U in 1967 to Rockwell International. Rockwell sold the G&U to a trucking company, Torco, Inc. of Worcester on January 29, 1979. Traffic has fluctuated over the years of Torco ownership.

The last train to Hopedale was in 1988 and for the next 5 years activity was localized solely to the Grafton yard. In 1993 the G&U bought their current engine, the St. Louis Union Station 212 and began hauling salt to Upton once again. This activity lasted until the late 90s.

Torco, Inc. eventually sold the G&U to the Lucy Family. In 2008 the G&U passed hands once again to Jon Delli Priscoli. Delli Priscoli has made clear his intentions to revitalize the railroad in its entirety from Grafton to Milford, and work began in earnest in early 2008.[3]

2000s renovation

In 2004 a test run was made on the track from North Grafton to West Upton. The track was determined to be in usable condition, however track beyond this point was so deteriorated that it would have been dangerous to operate a train.

In March 2008, 50% of the largely dormant G&U was sold, with the option to purchase the rest. Some in the town of Upton opposed any re-opening or increased use of the railroad line but were unable to have any influence. "We can't stop the railroad," said Selectmen Chairwoman Marsha Paul, "It is going to open. It will be about two years. It's something we'll have to monitor and watch."[4] The new owner, Delli Priscoli, claims that "Railroads are coming back."[5]

In October 2008 the North Grafton depot was expanded to accommodate two cars instead of one.

As of December 2009, the following is in progress or complete:

  • The Milford yard, as well as the ROW up through West Upton has been completely cleared of trees.
  • The Hopedale yard has been completely cleared and the land has been prepared for future development. The old engine house, scale, freight depot, and most of the yard's track have been removed.
  • The line from West Upton to North Grafton has received major upgrades with new ties, relayed stone ballast and extensive ditch work.
  • The West Upton yard had its switches and track refurbished with fresh ties and new stone ballast. Two new spurs were also built

On December 31, 2009, a test run was conducted, and it was announced that the portion of the line from North Grafton to West Upton was operable.[6] This is the largest rehabilitation the line has seen since the 1950s.

Several local residents in both Grafton and Upton have expressed concern regarding the railroad's ecological impact on air quality, as well as water integrity as a result of intensive development.

An article in the Milford Daily News dated September 11, 2012, stated: "State and local officials drove a ceremonial spike into a South Main Street railroad crossing Monday, signifying the start of reconstruction of the Milford and Hopedale portion of the Grafton and Upton Railroad... Work on the Milford and Hopedale stretch is part of the second phase of getting the railroad back in shape... The first phase of the work was the stretch of track from Grafton to West Upton... [Railroad spokesman Doug Pizzi ] said that he expects crossing construction in Milford will begin within the next month and hopes the entire track will be completed by the end of the year." [7]

Locomotive Fleet

References

  1. Lua error in package.lua at line 80: module 'strict' not found.
  2. Sixth Annual Report of the Massachusetts Board of Railroad Commissioners, January, 1875, p. 53
  3. Lua error in package.lua at line 80: module 'strict' not found.
  4. Lua error in package.lua at line 80: module 'strict' not found.
  5. Lua error in package.lua at line 80: module 'strict' not found.
  6. Lua error in package.lua at line 80: module 'strict' not found.
  7. http://www.milforddailynews.com/news/x1803413865/Grafton-and-Upton-Railroad-expansion-officially-under-way?img=2

External links