Illinois Route 255

From Infogalactic: the planetary knowledge core
Jump to: navigation, search

Illinois Route 255 marker

Illinois Route 255
Lua error in Module:Infobox_road/map at line 16: attempt to index field 'wikibase' (a nil value).
Route information
Maintained by IDOT
Length: 23.3 mi[2] (37.5 km)
Existed: October 1998[1] – present
Major junctions
South end: I-255 / I-270 in Pontoon Beach
North end: US 67 in Godfrey
Location
Counties: Madison
Highway system
I-255 IL 267

Illinois Route 255 (IL 255), also referred to as the Alton Bypass, is a northwesterly extension of Interstate 255 (I-255) in southwestern Illinois. IL 255 starts at I-270 in Pontoon Beach and ends at U.S. Route 67 (US 67) north of Godfrey near its junction with IL 267 and IL 111, at a total length of approximately 23.3 miles (37.5 km).

Route description

IL 255 is a four-lane, limited-access freeway for its entire length. It serves as an important circumferential artery for the northeastern portion of the St. Louis, Missouri, metropolitan area. The final segment was completed on November 23, 2012, and runs 4.3 miles (6.9 km) from Seminary Road to US 67 north of Godfrey near its junction with IL 267 and IL 111. The highway passes just to the west of the St. Louis Regional Airport.

Although IL 255 was designed to federal Interstate Highway standards, it was built by the Illinois Department of Transportation (IDOT) using state-provided funds.

History

Described as "the Road to Prosperity" by business leaders and government officials who initially proposed it in the late 1970s, IL 255 was part of a region-wide effort to create a high-speed alternative to US 67 over the Clark Bridge through the city-center of Alton, and to two congested local routes (IL 3 and IL 111) that roughly parallel the IL 255 corridor. Although it was part of the much larger Corridor 413 plan,[3] the local politicians focused mostly on the segment from I-270 to what was then IL 267 north of the Godfrey "Y" intersection. At that time, the Berm Highway, the Beltline extension, and the Madison Avenue connector were not built and both IL 3 and IL 111 were over capacity between Alton and I-270. In 1975, a six-month detour related with the closing of the Old Clark Bridge exposed the need for the Alton Bypass along with the other three routes. However, until 1985, the Alton Bypass was a low priority,[4] as other local road projects in the area were considered more important.

The first 6.5-mile (10.5 km) segment of IL 255, from I-270 to IL 143, was completed in October 1998 at the cost of $40 million (excluding land acquisition).[5]

The second segment, a 7.2-mile (11.6 km) extension from IL 143 in Roxana to Fosterburg Road, was opened on October 20, 2006, approximately one year behind schedule, owing to the 2005 collapse of the Wisconsin-based construction company that held the contracts for that portion of the roadway. The second segment was completed at a cost of approximately $78.1 million.[6]

The third segment of IL 255 from Fosterburg Road to Seminary Road in rural northeast Alton opened on August 22, 2008. Construction costs for this portion of the roadway totaled $25.1 million.[7]

The fourth and penultimate segment of the highway from Seminary Road in Alton to Humbert Road in Godfrey opened on October 26, 2012.[8]

The fifth and final segment of the highway runs 4.3 miles (6.9 km) from Seminary Road to US 67 north of Godfrey near its junction with IL 267 and IL 111 at a cost of $22 million.[9]

Future

Now complete, the IL 255 route may or may not be redesignated as an Interstate Highway. If the corridor were to be signed as an extension of the current I-255 bypass, all exits north of I-270 would have to be renumbered. As a standalone spur route, IL 255 numbered as I-255 would violate the American Association of State Highway and Transportation Officials scheme for Interstate numbering that requires an odd-number first digit (although as part of the larger I-255 bypass the route is not technically a spur even though it extends past the segment of I-55 that it bypasses). The entire corridor from Godfrey to Mehlville, Missouri, comprising both I-255 and IL 255 could also carry secondary signage as US 67 Bypass, since it would be a true bypass of US 67, which passes through the St. Louis urban agglomeration, actually connecting with US 67 at both endpoints.

Construction of a new expressway route for US 67 between Jacksonville and Alton is planned to follow the corridor through White Hall, Carrollton, and Jerseyville. It will end in Godfrey near the IL 255 extension.

Exit list

The entire route is in Madison County.

Location mi[2] km Exit Destinations Notes
Pontoon Beach 0.00 0.00 30 I-255 south – Memphis
I-270 – Kansas City, Indianapolis
Southern terminus; I-255 continues south
Poag 1.10 1.77 2 Gateway Commerce Center Drive East
2.98 4.80 3 New Poag Road
South Roxana 5.23 8.42 5 Madison Avenue
Roxana 6.50 10.46 6 IL 143 – Edwardsville, Wood River
Wood River 8.04 12.94 8 IL 111 (Vaughn Road, Bellwood Drive) Control cities change in the southbound direction
Bethalto 10.31 16.59 10 IL 111 / IL 140 (MacArthur Drive) SPUI interchange
Fosterburg 13.49 21.71 13 Fosterburg Road
Alton 16.41 26.41 16 Seminary Road
Godfrey 19 North Humbert Road
20 IL 111 / IL 267 (Montclaire Avenue)
21 US 67 Northbound exit and southbound entrance
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

Pictures

See also

References

  1. Lua error in package.lua at line 80: module 'strict' not found.[self-published source]
  2. 2.0 2.1 Lua error in package.lua at line 80: module 'strict' not found.
  3. Lua error in package.lua at line 80: module 'strict' not found.
  4. Lua error in package.lua at line 80: module 'strict' not found.[page needed]
  5. Lua error in package.lua at line 80: module 'strict' not found.[self-published source]
  6. Lua error in package.lua at line 80: module 'strict' not found.
  7. Lua error in package.lua at line 80: module 'strict' not found.
  8. Lua error in package.lua at line 80: module 'strict' not found.
  9. Lua error in package.lua at line 80: module 'strict' not found.