Keystone Pipeline

From Infogalactic: the planetary knowledge core
Jump to: navigation, search

Lua error in package.lua at line 80: module 'strict' not found.

Keystone Pipeline System
(Operational and Proposed)[1]
Keystone Pipeline Route
Keystone Pipeline Route
Location
Country Canada
United States
General information
Type Crude oil
Owner TransCanada

The Keystone Pipeline System is an oil pipeline system in Canada and the United States, commissioned in 2010. It runs from the Western Canadian Sedimentary Basin in Alberta to refineries in Illinois and Texas, and also to oil tank farms and an oil pipeline distribution center in Cushing, Oklahoma.[2]

Three phases of the project are in operation. They are:

  • The Keystone Pipeline (Phase I), delivering oil from Hardisty, Alberta, over 3,456 kilometres (2,147 mi) to the junction at Steele City, Nebraska, and on to Wood River Refinery in Roxana, Illinois, and Patoka Oil Terminal Hub (tank farm) north of Patoka, Illinois, completed in June 2010.[3]
  • The Keystone-Cushing extension (Phase II), running 468 kilometres (291 mi) from Steele City to storage and distribution facilities (tank farm) at Cushing, Oklahoma,[4] completed in February 2011.[5]
  • The Gulf Coast Extension (Phase III), running 784 kilometres (487 mi) from Cushing to refineries at Port Arthur, Texas was completed in January 2014,[6][7] and a lateral pipeline to refineries at Houston, Texas and a terminal will be completed mid-2016, going online the following year.[8]

The proposed Keystone XL Pipeline (Phase IV) would have essentially duplicated the Phase I pipeline between Hardisty, Alberta, and Steele City, Nebraska,[9] with a shorter route and a larger-diameter pipe. It would run through Baker, Montana, where American-produced light crude oil from the Williston Basin (Bakken formation) of Montana and North Dakota would be added[2] to the Keystone's current throughput of synthetic crude oil (syncrude) and diluted bitumen (dilbit) from the oil sands of Canada. However, after more than six years of review, the United States President Barack Obama announced on November 6, 2015, his administration's rejection of the fourth phase.

The first two phases have the capacity to deliver up to 590,000 barrels per day (94,000 m3/d) of oil into the Mid-West refineries.[4] Phase III has capacity to deliver up to 700,000 barrels per day (110,000 m3/d) to the Texas refineries.[10] By comparison, U.S. oil production averaged 9,400,000 barrels per day (1,490,000 m3/d) in first-half 2015, with gross exports of 500,000 barrels per day (79,000 m3/d) through July 2015.[11]

Description

The Keystone Pipeline system consists of the operational Phase I, Phase II, and Phase III, the Gulf Coast Pipeline Project, and a proposed pipeline expansion segment Phase IV, Keystone XL. Construction of Phase III, from Cushing, Oklahoma, to Nederland, Texas, in the Gulf Coast area, began in August 2012 as an independent economic utility.[notes 1][12] Phase III was opened on 22 January 2014[10] The Keystone XL Pipeline Project (Phase IV) revised proposal in 2012 consists of a new 36-inch (910 mm) pipeline from Hardisty, Alberta, through Montana and South Dakota to Steele City, Nebraska, to "transport of up to 830,000 barrels per day (132,000 m3/d) of crude oil from the Western Canadian Sedimentary Basin in Alberta, Canada, and from the Williston Basin (Bakken) region in Montana and North Dakota, primarily to refineries in the Gulf Coast area."[2] After the Keystone XL pipeline segments are completed, American crude oil would enter the XL pipelines at Baker, Montana, on their way to the storage and distribution facilities at Cushing, Oklahoma. Cushing is a major crude oil marketing/refining and pipeline hub.[13][14]

Operating since 2010, the original Keystone Pipeline System is an 3,461-kilometre (2,151 mi) pipeline delivering Canadian crude oil to U.S. Midwest markets and Cushing, Oklahoma. In Canada, the first phase of Keystone involved the conversion of approximately 864 kilometres (537 mi) of existing 36-inch (910 mm) natural gas pipeline in Saskatchewan and Manitoba to crude oil pipeline service. It also included approximately 373 kilometres (232 mi) of new 30-inch (760 mm) diameter pipeline, 16 pump stations and the Keystone Hardisty Terminal.[15]

The U.S. portion of the Keystone Pipeline included 1,744 kilometres (1,084 mi) of new, 30-inch (760 mm) diameter pipeline in North Dakota, South Dakota, Nebraska, Kansas, Missouri and Illinois.[15] The pipeline has a minimum ground cover of 4 feet (1.2 m).[16] It also involved construction of 23 pump stations and delivery facilities at Wood River and Patoka, Illinois. In 2011, the second phase of Keystone included a 480-kilometre (298 mi) extension from Steele City, Nebraska, to Cushing, Oklahoma, and 11 new pump stations to increase the capacity of the pipeline from 435,000 to 591,000 barrels per day (69,200 to 94,000 m3/d).[15]

Additional phases (III and IV) have been in construction or discussion since 2011. If completed, the Keystone XL would add 510,000 barrels per day (81,000 m3/d) increasing the total capacity up to 1.1 million barrels per day (170×10^3 m3/d).[17]

The original Keystone Pipeline cost US$5.2 billion with the Keystone XL expansion slated to cost approximately US$7 billion. The Keystone XL was expected to be completed by 2012–2013, however construction has been overtaken by events.[17]

Ownership

While the project was originally developed as a partnership between TransCanada Corporation and ConocoPhillips, TransCanada is now the sole owner of the Keystone Pipeline System, as TransCanada received regulatory approval on August 12, 2009 to purchase ConocoPhillips' interest.[18]

Certain parties who have agreed to make volume commitments to the Keystone expansion to have the option to acquire up to a combined 15% equity ownership.[17] One such company is Valero Energy Corporation.[19]

Route

Phase 1 (complete)

Keystone Pipeline
(Phase 1) (Complete)
Location
From Hardisty, Alberta
Passes through Regina, Saskatchewan
Steele City, Nebraska
To Wood River, Illinois
Patoka, Illinois (end)
General information
Type Crude oil
Construction started Q2 2008
Commissioned June 2010[3]
Technical information
Length Lua error in Module:Convert at line 1851: attempt to index local 'en_value' (a nil value).
Maximum discharge 0.86 million barrels per day (~4.3×10^7 t/a)
Diameter Lua error in Module:Convert at line 1851: attempt to index local 'en_value' (a nil value).
Number of pumping stations 39

This 3,456-kilometre-long (2,147 mi) pipeline runs from Hardisty, Alberta, to the junction at Steele City, Nebraska, and on to the Wood River Refinery in Roxana, Illinois, and Patoka Oil Terminal Hub (tank farm) north of Patoka, Illinois.[20] The Canadian section involves approximately 864 kilometres (537 mi) of pipeline converted from the Canadian Mainline natural gas pipeline and 373 kilometres (232 mi) of new pipeline, pump stations and terminal facilities at Hardisty, Alberta.[21]

The United States section is 2,219 kilometres (1,379 mi) long.[21] It runs through Buchanan, Clinton, Caldwell, Montgomery, Lincoln and St. Charles counties in Missouri, and Nemaha, Brown and Doniphan counties in Kansas before entering Madison County, Illinois.[22] Phase 1 went online in June 2010.[3]

Keystone 30 in (760 mm) pipeline (phase 1) near Swanton, Nebraska (2009)

Phase 2 (complete)

Keystone-Cushing Project
(Phase 2) (Complete)[1]
Location
From Steele City, Nebraska
To Cushing, Oklahoma
General information
Type Crude oil
Contractors WorleyParsons
Construction started 2010
Commissioned February 2011[5]
Technical information
Length Lua error in Module:Convert at line 1851: attempt to index local 'en_value' (a nil value).
Diameter Lua error in Module:Convert at line 1851: attempt to index local 'en_value' (a nil value).
Number of pumping stations 4

The Keystone-Cushing pipeline phase connected the Keystone pipeline (phase 1) in Steele City, Nebraska, south through Kansas to the oil hub and tank farm in Cushing, Oklahoma, a distance of 468-kilometre-long (291 mi). It was constructed in 2010 and went online in February 2011.[5]

Truck hauling 36 in (910 mm) pipe to build Keystone-Cushing pipeline (phase 2) southeast of Peabody, Kansas (2010)

Phase 3a (complete)

Cushing Marketlink Project
(Phase 3a) (Complete)[1]
Location
From Cushing, Oklahoma
Passes through Liberty County, Texas
To Nederland, Texas
General information
Type Crude oil
Contractors WorleyParsons
Construction started Summer 2012[6]
Commissioned January 2014[7]
Technical information
Length Lua error in Module:Convert at line 1851: attempt to index local 'en_value' (a nil value).
Maximum discharge 0.7 million barrels per day (~3.5×10^7 t/a)
Diameter Lua error in Module:Convert at line 1851: attempt to index local 'en_value' (a nil value).

The Cushing MarketLink pipeline phase started at Cushing, Oklahoma, where American-produced oil is added to the pipeline, then runs south 435 miles (700 km) to a delivery point near terminals in Nederland, Texas, to serve refineries in the Port Arthur, Texas, area. Keystone started pumping oil through this section in January 2014.[6][7][23] Oil producers in the U.S. pushed for this phase so the glut of oil can be distributed out of the large oil tank farms and distribution center in Cushing.

Phase 3b (under construction)

Houston Lateral Project
(Phase 3b)
(Under Construction)[1]
Location
From Liberty County, Texas
To Houston, Texas
General information
Type Crude oil
Contractors WorleyParsons
Construction started 2013
Expected mid-2016,[8] to be online by early 2017
Technical information
Length Lua error in Module:Convert at line 1851: attempt to index local 'en_value' (a nil value).

The Houston Lateral pipeline phase is a 47-mile (76 km) pipeline to transport crude oil from the pipeline in Liberty County, Texas, to refineries and terminal in the Houston area. This phase is currently under construction and scheduled to go online in 2017.[8]

Phase 4 (rejected)

Keystone XL Pipeline
(Phase 4) (Rejected)[24]
Location
From Hardisty, Alberta
Passes through Baker, Montana
To Steele City, Nebraska
General information
Type Crude oil
Contractors WorleyParsons
Construction started Unknown
Expected Unknown
Technical information
Length Lua error in Module:Convert at line 1851: attempt to index local 'en_value' (a nil value).
Diameter Lua error in Module:Convert at line 1851: attempt to index local 'en_value' (a nil value).

The proposed Keystone XL pipeline starts from the same area in Alberta, Canada, as the Phase 1 pipeline.[16] The Canadian section would consist of 526 kilometres (327 mi) of new pipeline.[25] It would enter the United States at Morgan, Montana, and travel through Baker, Montana, where American-produced oil would be added to the pipeline; then it would travel through South Dakota and Nebraska, where it would join the existing Keystone pipelines at Steele City, Nebraska.[1] This phase has generated the greatest controversy because of its routing over the Sandhills in Nebraska.[26][27][28]

On 6 November 2015, the project of Keystone XL was rejected by the Obama administration after more than six years of review.[29]

History

Keystone Pipeline

TransCanada Corporation proposed the project on February 9, 2005.[30] In October 2007, the Communications, Energy and Paperworkers Union of Canada asked the Canadian federal government to block regulatory approvals for the pipeline, with union president Dave Coles stating "the Keystone pipeline will exclusively serve US markets, create a permanent employment for very few Canadians, reduce our energy security, and hinder investment and job creation in the Canadian energy sector."[31]

The National Energy Board of Canada approved the construction of the Canadian section of the pipeline, including converting a portion of TransCanada's Canadian Mainline gas pipeline to crude oil pipeline, on September 21, 2007.[32] On March 17, 2008, the United States Department of State issued a Presidential Permit authorizing the construction, maintenance and operation of facilities at the United States and Canada border.[33]

On January 22, 2008, ConocoPhillips acquired a 50% stake in the project.[34] On June 17, 2009, TransCanada agreed that they would buy out ConocoPhillips' share in the project and revert to being the sole owner.[18] It took TransCanada more than two years to acquire all the necessary state and federal permits for the pipeline. Construction took another two years.[35] The pipeline, from Hardisty, Alberta, Canada, to Patoka, Illinois, United States, became operational in June 2010.[22]

Keystone XL

The Keystone XL extension was proposed in 2008.[16] The application was filed in September 2008 and the National Energy Board of Canada started hearings in September 2009.[36] On March 11, 2010 the Canadian National Energy Board approved the project.[13][25][37] The South Dakota Public Utilities Commission granted a permit to proceed on February 19, 2010.[38]

On July 21, 2010, the Environmental Protection Agency said the draft environmental impact study for Keystone XL was inadequate and should be revised, indicating that the State Department's original report was "unduly narrow" because it did not fully look at oil spill response plans, safety issues and greenhouse gas concerns.[39][40][41] The final environmental impact report was released on August 26, 2011. It stated that the pipeline would pose "no significant impacts" to most resources if environmental protection measures are followed, but it would present "significant adverse effects to certain cultural resources".[42] In September 2011, Cornell ILR Global Labor Institute released the results of the GLI KeystoneXL Report, which evaluated the pipeline's impact on employment, the environment, energy independence, the economy, and other critical areas.[37]

On November 10, 2011, the Department of State postponed a final decision due to necessity "to seek additional information regarding potential alternative routes around the Sandhills in Nebraska to inform the determination regarding whether issuing a permit for the proposed Keystone XL pipeline is in the national interest".[43] In its response, TransCanada pointed out fourteen different routes for Keystone XL were being studied, eight that impacted Nebraska. They included one potential alternative route in Nebraska that would have avoided the entire Sandhills region and Ogallala Aquifer and six alternatives that would have reduced pipeline mileage crossing the Sandhills or the aquifer.[44][45] On November 22, 2011, the Nebraska unicameral legislature passed unanimously two bills with the governor's signature that enacted a compromise agreed upon with the pipeline builder to move the route, and approved up to US$2 million in state funding for an environmental study.[46]

On November 30, 2011, a group of Republican senators introduced legislation aimed at forcing the Obama administration to make a decision within 60 days.[47] In December 2011, Congress passed a bill giving the Obama Administration a 60-day deadline to make a decision on the application to build the Keystone XL Pipeline.[43][48]

In January 2012, Obama rejected the application stating that the deadline for the decision had "prevented a full assessment of the pipeline's impact".[43][49] On September 5, 2012, TransCanada submitted an environmental report on the new route in Nebraska, which the company says is "based on extensive feedback from Nebraskans, and reflects our shared desire to minimize the disturbance of land and sensitive resources in the state".[50] In March 2012, Obama endorsed the building of the southern segment (Gulf Coast Extension or Phase III) that begins in Cushing, Oklahoma. The President said in Cushing, Oklahoma, on March 22, "Today, I'm directing my administration to cut through the red tape, break through the bureaucratic hurdles, and make this project a priority, to go ahead and get it done."[51]

In its supplemental environmental impact statement (SEIS) released in March 2013, the U.S. Department of State Bureau of Oceans and International Environmental and Scientific Affairs described changes to the original proposals including the shortening of the pipeline to 875 miles (1,408 km); its avoidance of "crossing the NDEQ-identified Sandhills Region" and "reduction of the length of pipeline crossing the Northern High Plains Aquifer system, which includes the Ogallala formation"; and stated "there would be no significant impacts to most resources along the proposed Project route."[52] In response to a Freedom of Information Act request for route information, the Department of State revealed on June 24, 2013 that "Neither Cardno ENTRIX nor TransCanada ever submitted GIS information to the Department of State, nor was either corporation required to do so."[53] In response to the Department of State's report, which recommended neither acceptance nor rejection, an editor of The New York Times recommended that Obama should reject the project, which "even by the State Department's most cautious calculations — can only add to the [climate change] problem."[54][notes 2] On March 21, Mother Jones revealed that key personnel employed by Environment Resources Management (ERM), the consulting firm responsible for generating most of the SEIS, had previously performed contract work for TransCanada corporation. In addition, When the State Department released the original proposal ERM had submitted to secure the SEIS contract, portions of the work histories of key personnel were redacted.[55]

In April 2013, the EPA challenged the U.S. State Department report's conclusion that the pipeline would not result in greater oil sand production, noting that "while informative, [it] is not based on an updated energy-economic modeling effort."[56][57] Overall, the EPA rated the SEIS with their category "EO-2" (EO for "environmental objections" and 2 for "insufficient information").[58]

In May 2013 Republicans in the House of Representatives defended the Northern Route Approval Act, which would allow for congressional approval of the pipeline, on the grounds that the pipeline created jobs and energy independence. If enacted the Northern Route Approval Act would waive the requirement for permits for a foreign company and bypass the need for President Obama's approval, and the debate in the Democrat-controlled U.S. Senate, concerned about serious environmental risks, that could result in the rejection of the pipeline.[59]

On January 22, 2014 the Gulf Coast Extension (phase III) was opened.[10]

On January 9, 2015 the U.S. House voted 266–153 in favor of the pipeline. On the same day, the Nebraska Supreme Court cleared the way for construction, after Republican Governor Dave Heineman had approved of it in 2013.[60]

A bill approving the construction of the Keystone XL Pipeline was passed by the Senate (62–36) on January 29, 2015,[61] and by the House (270–152) on February 11, 2015.[62] President Obama vetoed the bill on February 24, 2015, arguing that the decision of approval should rest with the Executive Branch.[63] The Senate was unable to override the veto by a two-thirds majority, with a 62-37 vote.[64]

Transcanada sued Nebraska landowners who refused permission allowing for pipeline easements on their properties, in order to exercise eminent domain over such use. However, on September 29, 2015, it dropped its lawsuits and acceded to the authority of the elected, five-member Nebraska Public Service Commission, which has the state constitutional authority to approve gas and oil pipelines.[65]

On November 6, 2015, the Obama government rejected the pipeline, stating that "The Keystone XL pipeline does not serve the national interests of the United States".[66]

Keystone XL controversies

The Keystone XL proposal faces criticism from environmentalists and a minority of the members of the United States Congress. In January 2012, President Barack Obama rejected the application amid protests about the pipeline's impact on Nebraska's environmentally sensitive Sandhills region.[67] TransCanada Corporation changed the original proposed route of Keystone XL to minimize "disturbance of land, water resources and special areas"; the new route was approved by Nebraska Governor Dave Heineman in January 2013.[9] On April 18, 2014, the Obama administration announced that the review of the controversial Keystone XL oil pipeline has been extended indefinitely, pending the result of a legal challenge to a Nebraska pipeline siting law that could change the route. On January 9, 2015, the Nebraska Supreme Court cleared the way for construction, and on the same day the House voted in favor of the pipeline. On January 29, 2015, the Keystone XL Pipeline was passed by the Senate 62-36.[61] On February 11, 2015, the Keystone XL Pipeline was passed by the House of Representatives with the proposed Senate Amendments 270-152.[62] The Keystone XL Pipeline bill was not officially sent to President Obama, starting the official ten-day count towards the bill becoming law without presidential signature, until February 24, 2015. Republicans delayed delivering the bill over the Presidents Day holiday weekend to ensure Congress would be in session if the president were to veto the bill. On February 24, 2015, the bill was vetoed and returned for congressional action.[68] On March 4, 2015, the Senate held a vote and failed to override President Obama’s veto of the bill; the vote was 62 to 37, and failed to reach the two-thirds majority required to override a presidential veto.[69] The review by the State Department is ongoing. On June 15, 2015 the House Oversight Committee threatened to subpoena the State Department for the latter's withholding of records relevant to the process since March 2015 and calling the process "unnecessarily secretive".[70] Despite some records being posted by consulted agencies such as the EPA, the State Department has not responded to the request. On November 2, 2015, TransCanada asked the Obama administration to suspend its permit application for the Keystone XL.[71]

Environmental issues

Different environmental groups, citizens, and politicians have raised concerns about the potential negative impacts of the Keystone XL project.[72] The main issues are the risk of oil spills along the pipeline, which would traverse highly sensitive terrain, and 17% higher greenhouse gas emissions from the extraction of oil sands compared to extraction of conventional oil.[73][74]

Potential for oil spills

A concern is that a pipeline spill would pollute air and critical water supplies and harm migratory birds and other wildlife.[39] Its original route plan crossed the Sandhills, the large wetland ecosystem in Nebraska, and the Ogallala Aquifer, one of the largest reserves of fresh water in the world.[27][75] The Ogallala Aquifer spans eight states, provides drinking water for two million people, and supports $20 billion in agriculture.[76] Critics say that a major leak could ruin drinking water and devastate the mid-western U.S. economy.[28][77] After opposition for laying the pipeline in this area, TransCanada agreed to change the route and skip the Sandhills.[26]

University of Nebraska professor Dr. John Stansbury conducted an independent analysis that provides more detail on the potential risks for the Ogallala Aquifer.[78] In his analysis, Dr. Stansbury concludes that safety assessments provided by TransCanada are misleading. According to Dr. Stansbury, "We can expect no fewer than 2 major spills per state during the 50-year projected lifetime of the pipeline. These spills could release as much as 180 thousand barrels of oil each."[79]

Other items of note in Dr. Stansbury's analysis:

  • "While TransCanada estimates that the Keystone XL will have 11 significant spills (more than 50 barrels of crude oil) over 50 years, a more realistic assessment is 91 significant spills over the pipeline’s operational lifetime. TransCanada arbitrarily and improperly adjusted spill factors to produce an estimate of one major spill on the 1,673 mi (2,692 km) of pipeline about every five years, but federal data on the actual incidence of spills on comparable pipelines indicate a more likely average of almost two major spills per year. (The existing Keystone I pipeline has had one major spill and 11 smaller spills in its first year of operation.)"
  • "Analysis of the time needed to shut down the pipeline shows that response to a leak at a river crossing could conservatively take more than ten times longer than the 11 minutes and 30 seconds that TransCanada assumes. (After the June 2010 spill of more than 800,000 US gallons (3,000,000 L) of crude oil into a tributary of the Kalamazoo River, an Enbridge tar sands pipeline – a 30-inch (760 mm) pipe compared to the 36-inch (910 mm) Keystone XL – was not completely shut down for 12 hours.)"
  • "Realistic calculations yield worst-case spill estimates of more than 180,000 barrels (7,600,000 US gal; 29,000,000 L) in the Nebraska Sandhills above the Ogallala Aquifer, more than 160,000 barrels (6,700,000 US gal; 25,000,000 L) of crude oil at the Yellowstone River crossings, more than 140,000 barrels (5,900,000 US gal; 22,000,000 L) at the Platte River crossing and more than 120,000 barrels (5,000,000 US gal; 19,000,000 L) at the Missouri River crossing."
  • "Contaminants from a release at the Missouri or Yellowstone River crossing would enter Lake Sakakawea in North Dakota where they would adversely affect drinking water intakes, aquatic wildlife, and recreation. Contaminants from a spill at the Platte River crossing would travel downstream unabated into the Missouri River for several hundred miles affecting drinking water intakes for hundreds of thousands of people (e.g., Lincoln, NE; Omaha, NE; Nebraska City, NE; St. Joseph, MO; Kansas City, MO) as well as aquatic habitats and recreational activities. In addition, other constituents from the spill would pose serious risks to humans and to aquatic species in the river."
  • "The worst-case site for such a spill is in the Sandhills region of Nebraska. The Sandhills are ancient sand dunes that have been stabilized by grasses. Because of their very permeable geology, nearly 100 percent of the annual rainfall infiltrates to a very shallow aquifer, often less than 20 feet below the surface. This aquifer is the well-known Ogallala Aquifer that is one of the most productive and important aquifers in the world."[78]

Pipeline industry spokesmen have noted that thousands of miles of existing pipelines carrying crude oil and refined liquid hydrocarbons have crossed over the Ogallala Aquifer for years, in southeast Wyoming, eastern Colorado and New Mexico, western Nebraska, Kansas, Oklahoma, and Texas.[80] The Pioneer crude oil pipeline crosses east-west across Nebraska, and the Pony Express pipeline, which crosses the Ogallala Aquifer in Colorado, Nebraska, and Kansas, was being converted as of 2013 from natural gas to crude oil, under a permit from the Federal Energy Regulatory Commission.[81]

Portions of the pipeline will also cross an active seismic zone that had a 4.3 magnitude earthquake as recently as 2002.[76] Opponents claim that TransCanada applied to the U.S. government to use thinner steel and pump at higher pressures than normal.[77] In October 2011, The New York Times questioned the impartiality of the environmental analysis of the pipeline done by Cardno Entrix, an environmental contractor based in Houston. The study found that the pipeline would have limited adverse environmental impacts, but was authored by a firm that had "previously worked on projects with TransCanada and describes the pipeline company as a 'major client' in its marketing materials".[82] However, the Department of State's Office of the Inspector General conducted an investigation of the potential conflict of interest, and its February 2012 report of that investigation states there was no conflict of interest either in the selection of the contractor or in the preparation of the environmental impact statement.[83]

According to The New York Times, legal experts questioned whether the U.S. government was "flouting the intent" of the Federal National Environmental Policy Act, which "[was] meant to ensure an impartial environmental analysis of major projects".[82] The report prompted 14 senators and congressmen to ask the State Department inspector general on October 26, 2011 "to investigate whether conflicts of interest tainted the process" for reviewing environmental impact.[84] In August 2014, a study was published that concluded the pipeline could produce up to 4 times more global warming pollution than the State Department's study indicated. The report blamed the discrepancy on a failure to take account of the increase in consumption due to the drop in the price of oil that would be spurred by the pipeline.[85]

TransCanada CEO Russ Girling has described the Keystone Pipeline as "routine", noting that TransCanada has been building similar pipelines in North America for half a century and that there are 200,000 miles (320,000 km) of similar oil pipelines in the United States today. He also stated that the Keystone Pipeline will include 57 improvements above standard requirements demanded by U.S. regulators so far, making it "the safest pipeline ever built".[86] Rep. Ed Whitfield, a member of the House Committee on Energy and Commerce concurred, saying "this is the most technologically advanced and safest pipeline ever proposed."[87] However, while TransCanada had asserted that a set of 57 conditions will ensure Keystone XL's safe operation, Anthony Swift of the Natural Resources Defense Council asserted that all but a few of these conditions simply restate current minimum standards.[88]

TransCanada claims that they will take 100% responsibility for any potential environmental problems. According to their website,"It’s our responsibility – as a good company and under law. If anything happens on the Keystone XL Pipeline, rapid response is key. That’s why our Emergency Response plans are approved by state and federal agencies, and why we practice them regularly. We conduct regular emergency exercises, and aerial surveys every two weeks. We’re ready to respond with a highly-trained response team standing by." [89]

Potential for increased carbon emissions

Environmental organizations such as the Natural Resources Defense Council (NRDC) also oppose the project due to its transportation of oil from oil sands.[73] In its March 2010 report, the NRDC stated that "the Keystone XL Pipeline undermines the U.S. commitment to a clean energy economy," instead "delivering dirty fuel at high costs".[90] On June 23, 2010, 50 Democrats in Congress in their letter to Secretary of State Hillary Clinton warned that "building this pipeline has the potential to undermine America's clean energy future and international leadership on climate change," referencing the higher input quantity of fossil fuels necessary to take the tar and turn it into a usable fuel product in comparison to other conventionally derived fossil fuels.[91][92]

NASA climate scientist James Hansen stated in 2013 that "moving to tar sands, one of the dirtiest, most carbon-intensive fuels on the planet" is a step in exactly the wrong direction, "indicating either that governments don't understand the situation or that they just don't give a damn".[93] The House Energy and Commerce Committee's chairman at the time, Representative Henry Waxman, had also urged the State Department to block Keystone XL for greenhouse gas emission reasons.[94][95]

In December 2010, the No Tar Sands Oil campaign, sponsored by action groups including Corporate Ethics International, NRDC, Sierra Club, 350.org, National Wildlife Federation, Friends of the Earth, Greenpeace, and Rainforest Action Network, was launched.[96]

In a speech to the Canadian Club in Toronto on September 23, 2011, Joe Oliver, Canada's Minister of Natural Resources, sharply criticized opponents of oil sands development and the pipeline, arguing that:[97]

  • The total area that has been affected by surface mining represents only 0.1% of Canada's boreal forest.
  • The oil sands account for about 0.1% of global greenhouse-gas emissions.
  • Electricity plants powered by coal in the U.S. generate almost 40 times more greenhouse-gas emissions than Canada's oil sands (the coal-fired electricity plants in the State of Wisconsin alone produce the equivalent of the entire GHG emissions of the oil sands).
  • California bitumen is more GHG-intensive than the oil sands.

In a February 2, 2015 letter response to the U.S. Department of State’s Final Supplemental Environmental Impact Statement (Final SEIS) for the Keystone XL Pipeline Project, U.S. the Environmental Protection Agency (EPA) stated that the pipeline will significantly increase greenhouse gas emissions because it will lead to the expansion of Alberta’s carbon intensive oilsands.[98] The letter goes on to add that that over the proposed 50-year timeline of the pipeline, this could mean releasing as much as "1.37 billion more tons of greenhouse gases into the atmosphere".[99] According to the New York Times, EPA concluded that due to the current relatively cheap cost of oil, companies might be less likely to set up their own developments in the oil sands. It would be too expensive for the companies to ship by rail. However, "the presence of the pipeline, which offers an inexpensive way to move the oil to market, could increase the likelihood that companies would extract from the oil sands even when prices are low".[100] In its letter response, the EPA suggested that the State Department should "revisit" its prior conclusions in light of the drop in oil prices.[101]

TransCanada Corporation responded with a letter of its own, in which President and CEO Russel K. Girling stated that TransCanada "rejects the EPA inference that at lower oil prices the [Keystone XL Pipeline] Project will increase the rate of oil sands production growth and accompanying greenhouse gas emissions".[102] Girling maintained that the EPA's conclusions "are not supported by the facts outlined in the Final SEIS or actual observations of the marketplace".[102]

Conflicts of interest

On May 4, 2012, the U.S. Department of State selected Environmental Resources Management (ERM) to author a Draft Supplemental Environmental Impact Statement, after the Environmental Protection Agency had found previous versions of the study, by contractor Cardno Entrix,[103] to be extremely inadequate.[104] Project opponents panned the study on its release, calling it a "deeply flawed analysis".[105] An investigation by Mother Jones magazine revealed that the State Department had redacted the biographies of the study's authors to hide their previous contract work for TransCanada and other oil companies with an economic interest in the project.[106] Based on an analysis of public documents on the State Department website, one critic asserted that "Environmental Resources Management was paid an undisclosed amount under contract to TransCanada to write the statement".[107]

Political issues

Map showing how the United States House of Representatives voted on the Keystone Pipeline, November 14, 2014.

The pipeline was a top-tier election issue for the November 4, 2014 United States elections for the United States Senate, for U.S. House of Representatives, for governors in states and territories, and for many state and local positions as well. One election-year dilemma facing the Democrats was whether or not Obama should approve the completion of the Keystone XL pipeline.[108] Tom Steyer, and other wealthy environmentalists, were committed to "make climate change a top-tier issue" in the elections with opposition to Keystone XL as "a significant part of that effort."[108]

In February 2011, environmental journalist David Sassoon of Inside Climate News reported that Koch Industries were poised to be "big winners" from the pipeline.[109] In May 2011, Congressmen Waxman and Rush wrote a letter to the Energy and Commerce Committee citing the Reuters story, and urging the Committee to request documents from Koch Industries relating to the Keystone XL pipeline.[110][111]

Landowners in the path of the pipeline have complained about threats by TransCanada to confiscate private land and lawsuits to allow the "pipeline on their property even though the controversial project has yet to receive federal approval."[112] As of October 17, 2011, TransCanada had "34 eminent domain actions against landowners in Texas" and "22 in South Dakota." Some of those landowners gave testimony for a House Energy and Commerce Committee hearing in May 2011.[112] In his book The Pipeline and the Paradigm, Samuel Avery quotes landowner David Daniel in Texas, who claims that TransCanada illegally seized his land via eminent domain by claiming to be a public utility rather than a private firm.[113]

In January 2012, Presidential candidate Sen. Bernie Sanders (I-Vt.) and Rep. Steve Cohen (D-Tenn.) requested a new report on the environmental review process.[114]

In September 2015, Presidential candidate Hillary Clinton publicly expressed her opposition on Keystone XL, citing climate change concerns.[115]

Diplomatic issues

Commentator Bill Mann has linked the Keystone postponement to the Michigan Senate's rejection of Canadian funding for the proposed Gordie Howe International Bridge and to other recent instances of "U.S. government actions (and inactions) that show little concern about Canadian concerns." Mann drew attention to a Maclean's article sub-titled "we used to be friends"[116] about U.S./Canada relations after President Obama had "insulted Canada (yet again)" over the pipeline.[117]

Canadian Ambassador Doer observes that Obama's "choice is to have it come down by a pipeline that he approves, or without his approval, it comes down on trains."[118]

During the 2014 Pacific Northwest Economic Region Summit in Whistler, B.C., Canada’s US Ambassador Gary Doer stated that there is no proof, be it environmental, economic, safety or scientific, that construction work on Keystone XL should not go ahead. Doer said that all the evidence supports a favourable decision by the US government for the controversial pipeline.[119]

In contrast, the President of the Rosebud Sioux Nation, Cyril Scott, has stated that the November 14, 2014 vote in favor of the Keystone XL pipeline in the U.S. House of Representatives is an "act of war," declaring:

"We are outraged at the lack of intergovernmental cooperation. We are a sovereign nation, and we are not being treated as such. We will close our reservation borders to Keystone XL. Authorizing Keystone XL is an act of war against our people."[120]

Geopolitical issues

Proponents for the Keystone XL pipeline argue that it would allow the U.S. to increase its energy security and reduce its dependence on foreign oil.[121][122] TransCanada CEO Russ Girling has argued that "the U.S. needs 10 million barrels a day of imported oil" and the debate over the proposed pipeline "is not a debate of oil versus alternative energy. This is a debate about whether you want to get your oil from Canada or Venezuela or Nigeria."[123] However, an independent study conducted by the Cornell ILR Global Labor Institute refers to some studies (e.g. a 2011 study by Danielle Droitsch of Pembina Institute) according to which "a good portion of the oil that will gush down the KXL will probably end up being finally consumed beyond the territorial United States". It also states that the project will increase the heavy crude oil price in the Midwestern United States by diverting oil sands oil from the Midwest refineries to the Gulf Coast and export markets.[37]

The US Gulf Coast has a large concentration of refineries designed to process very heavy crude oil. At present, the refineries are dependent on heavy crude from Venezuela, including crude from Venezuela’s own massive Orinoco oil sands. The United States is the number one buyer of crude oil exported from Venezuela.[124] The large trade relationship between the US and Venezuela has persisted despite political tensions between the two countries. However, the volume of oil imported into the US from Venezuela dropped in half from 2007 to 2014, as overall Venezuelan exports have dropped, and also as Venezuela seeks to become less dependent on US purchases of its crude oil. The Keystone pipeline is seen as a way to replace imports of heavy oil-sand crude from Venezuela with more reliable Canadian heavy oil.[125]

TransCanada's Girling has also argued that if Canadian oil doesn't reach the Gulf through an environmentally friendly buried pipeline, that the alternative is oil that will be brought in by tanker, a mode of transportation that produces higher greenhouse-gas emissions and that puts the environment at greater risk.[86] Diane Francis has argued that much of the opposition to the oil sands actually comes from foreign countries such as Nigeria, Venezuela, and Saudi Arabia, all of whom supply oil to the United States and who could be affected if the price of oil drops due to the new availability of oil from the pipeline. She cited as an example an effort by Saudi Arabia to stop pro-oil-sands television commercials.[126] TransCanada had said that development of oil sands will expand regardless of whether the crude oil is exported to the United States or alternatively to Asian markets through Enbridge Northern Gateway Pipelines or Kinder Morgan's Trans-Mountain line.[127]

Indigenous issues

Many Native Americans and Indigenous Canadians are opposed to the Keystone XL project for various reasons,[128] including possible damage to sacred sites, pollution, and water contamination, which could lead to health risks among their communities.[129]

On September 19, 2011, a number of leaders from Native American bands in the United States and First Nations bands from Canada were arrested for protesting the Keystone XL outside the White House. According to Debra White Plume, a Lakota activist, indigenous peoples "... have thousands of ancient and historical cultural resources that would be destroyed across [their] treaty lands".[129] TransCanada's Pipeline Permit Application to the South Dakota Public Utilities Commission states project impacts that include potential physical disturbance, demolition or removal of "prehistoric or historic archaeological sites, districts, buildings, structures, objects, and locations with traditional cultural value to Native Americans and other groups".[130]

Indigenous communities are also concerned with health risks posed by the extension of the Keystone pipeline.[131] Locally caught fish and untreated surface water would be at risk for contamination through oil sands extraction, and are central to the diets of many indigenous peoples.[132] Earl Hatley, an environmental activist who has worked with Native American tribes[133] has expressed concern about the environmental and public health impact on Native Americans.

TransCanada has developed an Aboriginal Relations policy in order to confront some of these conflicts. In 2004, TransCanada made a major donation to the University of Toronto "to promote education and research in the health of the Aboriginal population".[134] Another proposed solution is TransCanada's Aboriginal Human Resource Strategy, which was developed to facilitate aboriginal employment and to provide "opportunities for Aboriginal businesses to participate in both the construction of new facilities and the ongoing maintenance of existing facilities"[135]

Economic issues

Russ Girling, president and CEO of TransCanada, touted the positive impact of the project by "putting 20,000 US workers to work and spending $7 billion stimulating the US economy".[136] These numbers come from a 2010 report written by The Perryman Group, a financial analysis firm based in Texas that was hired by TransCanada to evaluate Keystone XL.[137][138] The numbers in the Perryman Group report have been disputed by an independent study conducted by the Cornell ILR Global Labor Institute, which found that while the Keystone XL would result in 2,500 to 4,650 temporary construction jobs, this impact will be reduced by higher oil prices in the Midwest, which will likely reduce national employment.[37] However, it will increase gasoline availability to the Northeast and expand the Gulf refining industry. The State Department estimates that the pipeline would create about 5,000 to 6,000 temporary jobs in the United States during the two-year construction period.[139][140]

On January 27, 2012, Greenpeace Executive Director Phil Radford appealed to the U.S. Securities and Exchange Commission to review TransCanada's claims that the Keystone Pipeline would create 20,000 jobs. Stating that the company had "consistently used public statements and information it knows are false in a concerted effort to secure permitting approval" of the pipeline, Radford argued that TransCanada had "misled investors, U.S. and Canadian officials, the media, and the public at large in order to bolster its balance sheets and share price".[141]

On July 27, 2013, President Obama stated "The most realistic estimates are this might create maybe 2,000 jobs during the construction of the pipeline, which might take a year or two, and then after that we're talking about somewhere between 50 and 100 jobs in an economy of 150 million working people." The estimate of 2,000 during construction came under heavy attack, while the long-term, permanent job estimates did not receive as much criticism.[142] The Associated Press noted that it was unclear where the president's figure of 2,000 jobs came from. The U.S. State Department's Preliminary Supplemental Environmental Impact Statement, issued in March 2013, estimated 3,900 direct jobs and 42,000 direct and indirect jobs during construction.[143] According to the Final Supplemental Environmental Impact Statement (SEIS), the Pipeline will only create 35 permanent jobs.[144]

There might be unintended economic consequences to the construction of Keystone XL. As an example, the additional north-south crude oil transport capacity brought by Keystone XL will increase the price the oil sands producers receive for their oil. These higher revenues will have a positive impact on the development of the industry in Alberta. In return, due to the Petrodollar nature of the Canadian currency these same additional revenues will strengthen the Canadian dollar versus the United States dollar. Based on historical trends, this stronger Canadian dollar will result in a reduction of the competitiveness of Canada's manufacturing industry and could lead to the loss of 50,000 to 100,000 jobs in Canada's manufacturing sector.[145][unreliable source?] Many of these jobs, such as the ones in the auto industry, would likely find their way south and have a positive impact on manufacturing employment in the U.S.[146][not in citation given]

Glen Perry, a petroleum engineer for Adira Energy, has warned that including the Alberta Clipper pipeline owned by TransCanada's competitor Enbridge, there is an extensive overcapacity of oil pipelines from Canada.[147] After completion of the Keystone XL line, oil pipelines to the U.S. may run nearly half-empty. The expected lack of volume combined with extensive construction cost overruns has prompted several petroleum refining companies to sue TransCanada. Suncor Energy hoped to recoup significant construction-related tolls, though the U.S. Energy Regulatory Commission did not rule in their favor. According to The Globe and Mail,

The refiners argue that construction overruns have raised the cost of shipping on the Canadian portion of Keystone by 145 per cent while the U.S. portion has run 92 per cent over budget. They accuse TransCanada of misleading them when they signed shipping contracts in the summer of 2007. TransCanada nearly doubled its construction estimates in October 2007, from $2.8-billion (U.S.) to $5.2-billion.[148]

Due to an exemption the state of Kansas gave TransCanada, the local authorities would lose $50 million public revenue from property taxes for a decade.[41]

In the United States, Democrats are concerned that Keystone XL would not provide petroleum products for domestic use, but simply facilitate getting Alberta oil sands products to American coastal ports on the Gulf of Mexico for export to China and other countries.[59][dead link] In January 2015, Senate Republicans blocked a vote on an amendment proposed by Senator Edward J. Markey, D-Mass., which would have banned exports from the Keystone XL pipeline and required that the pipeline be built with steel from the United States.[149][150]

Frustrated by delays in getting approval for Keystone XL (via the Gulf of Mexico), the Enbridge Northern Gateway Pipelines (via Kitimat, BC) and the expansion of the existing TransMountain line to Vancouver, Alberta has intensified exploration of two northern projects "to help the province get its oil to tidewater, making it available for export to overseas markets".[151] Canadian Prime Minister Stephen Harper, spent $9 million by May 2012 and $16.5 million by May 2013 to promote Keystone XL.[59] Until Canadian crude oil accesses international prices like LLS or Maya crude oil by "getting to tidewater" (south to the U.S. Gulf ports via Keystone XL for example, west to the BC Pacific coast via the proposed Northern Gateway line to ports at Kitimat, BC or north via the northern hamlet of Tuktoyaktuk, near the Beaufort Sea),[151] the Alberta government (and to some extent, the Canadian government) is losing from $4 – 30 billion in tax and royalty revenues as the primary product of the oil sands, Western Canadian Select (WCS), the bitumen crude oil basket, is discounted so heavily against West Texas Intermediate (WTI) while Maya crude oil, a similar product close to tidewater, is reaching peak prices.[152] Calgary-based Canada West Foundation warned in April 2013, that Alberta is "running up against a [pipeline capacity] wall around 2016, when we will have barrels of oil we can't move".[151]

Pipeline opponents warn of disruption of farms and ranches during construction,[153] and point to damage to water mains and sewage lines sustained during construction of an Enbridge crude oil pipeline in Michigan.[154] A report by the Cornell University Global Labor Institute noted of the 2010 Enbridge Tar Oil Spill along the Kalamazoo River in Michigan: "The experience of Kalamazoo residents and businesses provides an insight into some of the ways a community can be affected by a tar sands pipeline spill. Pipeline spills are not just an environmental concern. Pipeline spills can also result in significant economic and employment costs, although the systematic tracking of the social, health, and economic impacts of pipeline spills is not required by law. Leaks and spills from Keystone XL and other tar sands and conventional crude pipelines could put existing jobs at risk.."[153]

Safety issue

A USA Today editorial pointed out that the 2013 Lac-Mégantic derailment in Quebec, in which crude oil carried by rail cars exploded and killed 47 people,[155] highlights the safety of pipelines compared to truck or rail transport. The oil in the Lac-Mégantic rail cars came from the Bakken Formation in North Dakota, an area that would be served by the Keystone expansion.[156] Increased oil production in North Dakota has exceeded pipeline capacity since 2010, leading to increasing volumes of crude oil being shipped by truck or rail to refineries.[157] Canadian journalist Diana Furchtgott-Roth commented: "If this oil shipment had been carried through pipelines, instead of rail, families in Lac-Mégantic would not be grieving for lost loved ones today, and oil would not be polluting Lac Mégantic and the Chaudière River."[158] A Wall Street Journal article in March 2014 points out that the main reason oil producers from the North Dakota Bakken Shale region are using rail and trucks to transport oil is economics not pipeline capacity. The Bakken oil is of a higher quality than the Canadian sand oil and can be sold to east coast refinery at a premium that they would not get sending it to Gulf refineries.[159] The article goes on to state that there is little support remaining among these producers for the Keystone XL.

On November 6, 2015, President Obama rejected Keystone XL citing the urgency of climate change as a key reason behind his decision.[160]

Public opinion

Public opinion polls taken by independent national polling organizations have shown majority support for the proposed pipeline in the US. A September 2013 poll by the Pew Center found 65% favored the project and 30% opposed. The same poll found the pipeline favored by majorities of men (69%), women (61%), Democrats (51%), Republicans (82%), independents (64%), as well as by those in every division of age, education, economic status, and geographic region. The only group identified by the Pew poll with less than majority support for the pipeline was among those Democrats who identified themselves as liberal (41% in favor versus 54% opposed).[161]

The overall results of polls on the Keystone XL pipeline taken by independent national polling organizations are as follows:

  • Gallup (March 2012): 57% government should approve, 29% government should not approve[162]
  • Rasmussen (January 2014): 57% favor, 28% oppose (of likely voters)[163]
  • Pew Center (September 2013): 65% favor, 30% oppose[161]
  • Washington Post-ABC News (April 2014): 65% government should approve, 22% government should not approve[164]
  • USA Today (January 2014): 56% favor, 41% oppose[165]
  • CBS News – Roper (May 2014): 56% favor, 28% oppose[166]

Ongoing developments

Protests and postponements

Demonstration against the Keystone XL extension, White House, August 2011.

In 2011, environmental and global warming activist Bill McKibben took the question of the pipeline to NASA scientist James Hansen, who told McKibben the pipeline would be "game over for the planet".[167] McKibben and other activists organized opposition, which coalesced in August 2011 with over 1000 nonviolent arrests at the White House, which included environmental leaders such as Phil Radford and celebrities including Daryl Hannah.[168] They promised to continue to challenge President Obama to stand by his 2008 call to "be the generation that finally frees America from the tyranny of oil"[169] as he entered the 2012 reelection campaign. A relatively broad coalition came together, including the Republican governor Dave Heineman and senators Ben Nelson (D) and Mike Johanns (R) from Nebraska, and some Democratic funders such as Susie Tompkins Buell.[169]

On November 6, 2011, several thousand environmentalist supporters, some shouldering a long black inflatable replica of a pipeline, formed a human chain around the White House to convince Barack Obama to block the controversial Keystone XL project. Organizer Bill McKibben said, "this has become not only the biggest environmental flash point in many, many years, but maybe the issue in recent times in the Obama administration when he's been most directly confronted by people in the street. In this case, people willing, hopeful, almost dying for him to be the Barack Obama of 2008."[170]

On October 4, 2012, actress and activist Daryl Hannah and 78-year-old Texas landowner Eleanor Fairchild were arrested for criminal trespassing and other charges after they were accused of standing in front of pipeline construction equipment on Fairchild's farm in Winnsboro, a town about 100 miles (160 km) east of Dallas.[171] Fairchild has owned the land since 1983 and refused to sign any agreements with TransCanada. Her land was seized by eminent domain.

On October 31, 2012, Green Party presidential candidate Jill Stein was also arrested in Texas for criminal trespass after trying to deliver food and supplies to the Keystone XL protesters.[172][173]

An estimated crowd of 35,000–50,000 gathers near the Washington Monument on February 17, 2013 to protest the Keystone XL pipeline and support action on climate change.

On February 17, 2013, approximately 35,000 to 50,000 protestors attended a rally in Washington, D.C. organized by The Sierra Club, 350.org, and The Hip Hop Caucus, in what Bill McKibben described as "the biggest climate rally by far, by far, by far, in U.S. history".[174][175] The event featured Lennox Yearwood; Chief Jacqueline Thomas, immediate past chief of the Saik'uz First Nation; Van Jones; Crystal Lameman, of Beaver Lake Cree Nation; Michael Brune, Sen. Sheldon Whitehouse (D-RI), and others as invited speakers.[176] Simultaneous 'solidarity' protests were also organized in several other cities across the United States, Europe, and Canada.[citation needed] Protesters called on President Obama to reject the planned pipeline extension when deciding the fate of the pipeline after Secretary of State John Kerry completes a review of the project.[177]

"[B]ecause of broader market dynamics and options for crude oil transport in the North American logistics system, the upstream and downstream activities are unlikely to be substantially different whether or not the proposed Project is constructed."[178]

On March 2, 2014, approximately 1000–1200 protesters marched from Georgetown University to the White House to stage a protest against the Keystone Pipeline. 398 arrests were made of people tying themselves to the White House fence with zip-ties and lying on a black tarp in front of the fence. The tarp represented an oil spill, and many protesters dressed in white jumpsuits covered in black ink, symbolizing oil-covered HazMat suits, laid down upon the tarp.

Alternative projects

On November 16, 2011, Enbridge announced it was buying ConocoPhillips' 50% interest in the Seaway pipeline that flowed from the Gulf of Mexico to the Cushing hub. In cooperation with Enterprise Products Partners LP it is reversing the Seaway pipeline so that an oversupply of oil at Cushing can reach the Gulf.[179] This project replaced the earlier proposed alternative Wrangler pipeline project from Cushing to the Gulf Coast.[180] It began reversed operations on May 17, 2012.[181] However, according to industries, the Seaway line alone is not enough for oil transportation to the Gulf Coast.[182]

On January 19, 2012, TransCanada announced it may shorten the initial path to remove the need for federal approval.[183] TransCanada said that work on that section of the pipeline could start in June 2012[184] and be on-line by the middle to late 2013.[185]

In April 2013, it was learned that the government of Alberta was investigating, as an alternative to the pipeline south through the United States, a shorter all-Canadian pipeline north to the Arctic coast, from where the oil would be taken by tanker ships through the Arctic Ocean to markets in Asia and Europe[186] and in August, TransCanada announced a new proposal to create a longer all-Canada pipeline, called Energy East, that would extend as far east as the port city of Saint John, New Brunswick, at the same time providing feedstock to refineries in Montreal, Quebec City and Saint John.[187]

The Enbridge "Alberta Clipper" expansion of the existing cross-border Line 67 pipeline has been continuing since late 2013. When completed it will add 350,000 bpd new capacity to the existing pipeline for cumulative total of 800,000 bpd.[188] In late 2014 Enbridge announced it is awaiting final approval from the US State Department and expects to proceed with the last phase in mid-2015.[189]

Lawsuits

In September 2009, independent refiner CVR sued TransCanada for Keystone Pipeline tolls seeking $250 million damage compensation or release from transportation agreements. CVR alleged that the final tolls for the Canadian segment of the pipeline were 146% higher than initially presented, while the tolls for the U.S. segment were 92% higher.[190] In April 2010, three smaller refineries sued TransCanada to break Keystone transportation contracts, saying the new pipeline has been beset with cost overruns.[148]

In October 2009, a suit was filed by the Natural Resources Defense Council that challenged the pipeline on the grounds that its permit was based on a deficient environmental impact statement. The suit was thrown out by a federal judge on procedural grounds, ruling that the NRDC lacked the authority to bring it.[191]

In June 2012, Sierra Club, Inc., Clean Energy Future Oklahoma, and the East Texas Sub Regional Planning Commission filed a joint complaint in the United States District Court for the Western District of Oklahoma seeking injunctive relief and petitioning for a review of the U.S. Army Corps of Engineers' action in issuing Nationwide Permit 12 permits for the Cushing, Oklahoma, to the Gulf Coast portion of the pipeline. The suit alleges that, contrary to the federal Administrative Procedure Act, 5 U.S.C. § 701 et. seq., the Corps' issuance of the permits was arbitrary and capricious and an abuse of discretion.[192]

In early January 2016, TransCanada announced it would initiate an ISDS claim under NAFTA against the United States, seeking $15 billion in damages and calling the denial of a permit for Keystone XL "arbitrary and unjustified."[193]

See also

Notes

  1. It was presented to the United States State Department as a independent economic utility in February 2012, sidestepping the requirement for a Presidential Permit because it does not cross an international border (United States Department of State SEIS March 1, 2013 p. ES1).
  2. The Alberta government placed a $30,000 ad entitled "Keystone XL: The Choice of Reason" in The New York Times to counter the editorial (CBC March 17, 2013).

References

  1. 1.0 1.1 1.2 1.3 1.4 Lua error in package.lua at line 80: module 'strict' not found.
  2. 2.0 2.1 2.2 Lua error in package.lua at line 80: module 'strict' not found.
  3. 3.0 3.1 3.2 Press Release – Keystone Pipeline Starts Deliveries to U.S. Midwest; TransCanada; June 30, 2010.
  4. 4.0 4.1 Lua error in package.lua at line 80: module 'strict' not found.
  5. 5.0 5.1 5.2 Press Release – Keystone’s Cushing Extension Begins Deliveries to Oklahoma; TransCanada; February 8, 2011.
  6. 6.0 6.1 6.2 Press Release – TransCanada Receives Final Key Gulf Coast Project Permit Construction Set to Begin this Summer; TransCanada; July 7, 2012.
  7. 7.0 7.1 7.2 Press Release – Gulf Coast Project Begins Delivering Crude Oil to Nederland, Texas; TransCanada; January 22, 2014.
  8. 8.0 8.1 8.2 Houston Lateral and Terminal – Project Status; TransCanada.
  9. 9.0 9.1 Lua error in package.lua at line 80: module 'strict' not found.
  10. 10.0 10.1 10.2 , completing the pipeline path from Hardisty, Alberta to Nederland, Texas.Lua error in package.lua at line 80: module 'strict' not found.
  11. Lua error in package.lua at line 80: module 'strict' not found.
  12. Lua error in package.lua at line 80: module 'strict' not found.
  13. 13.0 13.1 Lua error in package.lua at line 80: module 'strict' not found.
  14. Lua error in package.lua at line 80: module 'strict' not found.
  15. 15.0 15.1 15.2 Lua error in package.lua at line 80: module 'strict' not found.
  16. 16.0 16.1 16.2 Lua error in package.lua at line 80: module 'strict' not found.
  17. 17.0 17.1 17.2 Lua error in package.lua at line 80: module 'strict' not found.
  18. 18.0 18.1 Lua error in package.lua at line 80: module 'strict' not found.
  19. Lua error in package.lua at line 80: module 'strict' not found.
  20. Lua error in package.lua at line 80: module 'strict' not found.
  21. 21.0 21.1 Lua error in package.lua at line 80: module 'strict' not found.
  22. 22.0 22.1 Lua error in package.lua at line 80: module 'strict' not found.
  23. Lua error in package.lua at line 80: module 'strict' not found.
  24. Lua error in package.lua at line 80: module 'strict' not found.
  25. 25.0 25.1 Lua error in package.lua at line 80: module 'strict' not found.
  26. 26.0 26.1 Lua error in package.lua at line 80: module 'strict' not found.
  27. 27.0 27.1 Lua error in package.lua at line 80: module 'strict' not found.
  28. 28.0 28.1 Lua error in package.lua at line 80: module 'strict' not found.
  29. Obama administration rejects Keystone pipeline
  30. Lua error in package.lua at line 80: module 'strict' not found.
  31. Lua error in package.lua at line 80: module 'strict' not found.
  32. Lua error in package.lua at line 80: module 'strict' not found.
  33. Lua error in package.lua at line 80: module 'strict' not found.
  34. Lua error in package.lua at line 80: module 'strict' not found.
  35. Lua error in package.lua at line 80: module 'strict' not found.
  36. Lua error in package.lua at line 80: module 'strict' not found.
  37. 37.0 37.1 37.2 37.3 Lua error in package.lua at line 80: module 'strict' not found. Cite error: Invalid <ref> tag; name "ILR_Cornell_Study" defined multiple times with different content
  38. Lua error in package.lua at line 80: module 'strict' not found.
  39. 39.0 39.1 Lua error in package.lua at line 80: module 'strict' not found.
  40. Lua error in package.lua at line 80: module 'strict' not found.
  41. 41.0 41.1 Lua error in package.lua at line 80: module 'strict' not found.
  42. Lua error in package.lua at line 80: module 'strict' not found.
  43. 43.0 43.1 43.2 Lua error in package.lua at line 80: module 'strict' not found.
  44. Lua error in package.lua at line 80: module 'strict' not found.
  45. Lua error in package.lua at line 80: module 'strict' not found.
  46. Lua error in package.lua at line 80: module 'strict' not found.
  47. Lua error in package.lua at line 80: module 'strict' not found.
  48. Lua error in package.lua at line 80: module 'strict' not found.
  49. Lua error in package.lua at line 80: module 'strict' not found.
  50. Lua error in package.lua at line 80: module 'strict' not found.
  51. Lua error in package.lua at line 80: module 'strict' not found.
  52. Cite error: Invalid <ref> tag; no text was provided for refs named U.S._StateDepartmentSEISMarch2013
  53. Lua error in package.lua at line 80: module 'strict' not found.
  54. Lua error in package.lua at line 80: module 'strict' not found.
  55. Lua error in package.lua at line 80: module 'strict' not found.
  56. Lua error in package.lua at line 80: module 'strict' not found.
  57. Lua error in package.lua at line 80: module 'strict' not found.
  58. Cynthia Jones (U.S. EPA), letter to U.S. Dept. of State concerning Keystone XL pipeline, 22 Apr, 2013.
  59. 59.0 59.1 59.2 Lua error in package.lua at line 80: module 'strict' not found.
  60. Lua error in package.lua at line 80: module 'strict' not found.
  61. 61.0 61.1 Senate Passes Keystone XL Measure, [1], accessed Jan. 2015
  62. 62.0 62.1 Lua error in package.lua at line 80: module 'strict' not found.
  63. Lua error in package.lua at line 80: module 'strict' not found.
  64. Keystone veto override fails. March 4, 2015.
  65. Keystone XL developer drops lawsuits, Associated Press, September 29, 2015. Retrieved 1 October 2015.
  66. Lua error in package.lua at line 80: module 'strict' not found.
  67. Lua error in package.lua at line 80: module 'strict' not found.
  68. Obama Vetoes Keystone XL Pipeline Bill. 24 February 2015. Retrieved 24 February 2015.
  69. Lua error in package.lua at line 80: module 'strict' not found.
  70. Lua error in package.lua at line 80: module 'strict' not found.
  71. Lua error in package.lua at line 80: module 'strict' not found.
  72. Lua error in package.lua at line 80: module 'strict' not found.Lua error in package.lua at line 80: module 'strict' not found.Lua error in package.lua at line 80: module 'strict' not found.
  73. 73.0 73.1 Lua error in package.lua at line 80: module 'strict' not found.
  74. Lua error in package.lua at line 80: module 'strict' not found.
  75. Lua error in package.lua at line 80: module 'strict' not found.
  76. 76.0 76.1 Lua error in package.lua at line 80: module 'strict' not found.
  77. 77.0 77.1 Lua error in package.lua at line 80: module 'strict' not found.
  78. 78.0 78.1 http://watercenter.unl.edu/downloads/2011-Worst-case-Keystone-spills-report.pdf
  79. Lua error in package.lua at line 80: module 'strict' not found.
  80. Larry Lakely, Map of Pipelines and the Ogallala Aquifer, 2012, 20 Jan. 2012.
  81. Paul Hammel, Smaller oil pipeline to cross Ogallala Aquifer, Omaha.com, 23 Aug. 2012.
  82. 82.0 82.1 Lua error in package.lua at line 80: module 'strict' not found.
  83. United States Department of State and the Broadcasting Board of Governors Office of Inspector General Office of Audits. February 2012. Special Review of the Keystone XL Pipeline Permit Process. Report Number AUD/SI-12-28.
  84. Tar Sands Pipeline Probe Urged Sen. Bernie Sanders October 26, 2011
  85. Lua error in package.lua at line 80: module 'strict' not found.
  86. 86.0 86.1 Lua error in package.lua at line 80: module 'strict' not found.
  87. "Keystone XL the 'safest pipeline ever'", Sun News Network, 2 December 2011.
  88. Lua error in package.lua at line 80: module 'strict' not found.
  89. http://keystone-xl.com/facts/myths-facts/
  90. Lua error in package.lua at line 80: module 'strict' not found.
  91. Lua error in package.lua at line 80: module 'strict' not found.
  92. Lua error in package.lua at line 80: module 'strict' not found.
  93. Lua error in package.lua at line 80: module 'strict' not found.
  94. Lua error in package.lua at line 80: module 'strict' not found.
  95. Lua error in package.lua at line 80: module 'strict' not found.
  96. Lua error in package.lua at line 80: module 'strict' not found.
  97. Lua error in package.lua at line 80: module 'strict' not found.
  98. Lua error in package.lua at line 80: module 'strict' not found.
  99. Lua error in package.lua at line 80: module 'strict' not found.
  100. http://www.nytimes.com/2015/02/12/us/politics/house-passes-keystone-bill.html
  101. Lua error in package.lua at line 80: module 'strict' not found.
  102. 102.0 102.1 http://keystone-xl.com/wp-content/uploads/2015/02/response-to-epa-letter.pdf
  103. Lua error in package.lua at line 80: module 'strict' not found.
  104. Lua error in package.lua at line 80: module 'strict' not found.
  105. Lua error in package.lua at line 80: module 'strict' not found.
  106. Lua error in package.lua at line 80: module 'strict' not found.
  107. Lua error in package.lua at line 80: module 'strict' not found.
  108. 108.0 108.1 Lua error in package.lua at line 80: module 'strict' not found.
  109. Lua error in package.lua at line 80: module 'strict' not found.
  110. Lua error in package.lua at line 80: module 'strict' not found.
  111. Lua error in package.lua at line 80: module 'strict' not found.
  112. 112.0 112.1 Lua error in package.lua at line 80: module 'strict' not found.
  113. Lua error in package.lua at line 80: module 'strict' not found.
  114. Lua error in package.lua at line 80: module 'strict' not found.
  115. http://edition.cnn.com/2015/09/22/politics/hillary-clinton-opposes-keystone-xl-pipeline/
  116. Mann, Bill, "Americans should be thankful for Canada", MarketWatch, November 24, 2011. Retrieved 2011-11-24.
  117. Savage, Luiza Ch., "The U.S. and Canada: we used to be friends", Maclean's, November 21, 2011 8:00 am. Retrieved 2011-11-24.
  118. Lua error in package.lua at line 80: module 'strict' not found.
  119. Lua error in package.lua at line 80: module 'strict' not found.
  120. Lua error in package.lua at line 80: module 'strict' not found.
  121. Lua error in package.lua at line 80: module 'strict' not found.
  122. Lua error in package.lua at line 80: module 'strict' not found.
  123. Lua error in package.lua at line 80: module 'strict' not found.
  124. US Energy Information Administration, Venezuela, 20 June 2014.
  125. Jorge R. Pinon, The possible loss of Venezuelan heavy crude oil imports underscores the strategic importance of the Keystone XL pipeline, Energy Issue Brief, Jackson School of Geosciences, Univ. of Texas, Aug. 2014.
  126. Lua error in package.lua at line 80: module 'strict' not found.
  127. Lua error in package.lua at line 80: module 'strict' not found.
  128. Lua error in package.lua at line 80: module 'strict' not found.
  129. 129.0 129.1 Lua error in package.lua at line 80: module 'strict' not found.
  130. Lua error in package.lua at line 80: module 'strict' not found.
  131. Lua error in package.lua at line 80: module 'strict' not found.
  132. Lua error in package.lua at line 80: module 'strict' not found.
  133. Lua error in package.lua at line 80: module 'strict' not found.
  134. Lua error in package.lua at line 80: module 'strict' not found.
  135. Lua error in package.lua at line 80: module 'strict' not found.
  136. Lua error in package.lua at line 80: module 'strict' not found.
  137. Lua error in package.lua at line 80: module 'strict' not found.
  138. Lua error in package.lua at line 80: module 'strict' not found.
  139. Lua error in package.lua at line 80: module 'strict' not found.
  140. Lua error in package.lua at line 80: module 'strict' not found.
  141. Lua error in package.lua at line 80: module 'strict' not found.
  142. Associated Press, AP: Obama Understates Keystone XL Pipeline Jobs By Thousands, 1 Aug. 2013
  143. Lua error in package.lua at line 80: module 'strict' not found.
  144. Lua error in package.lua at line 80: module 'strict' not found.
  145. Lua error in package.lua at line 80: module 'strict' not found.
  146. Lua error in package.lua at line 80: module 'strict' not found.
  147. 148.0 148.1 Lua error in package.lua at line 80: module 'strict' not found.
  148. Lua error in package.lua at line 80: module 'strict' not found.
  149. Lua error in package.lua at line 80: module 'strict' not found.
  150. 151.0 151.1 151.2 Lua error in package.lua at line 80: module 'strict' not found.
  151. Lua error in package.lua at line 80: module 'strict' not found.
  152. 153.0 153.1 http://www.ilr.cornell.edu/globallaborinstitute/research/upload/GLI_Impact-of-Tar-Sands-Pipeline-Spills.pdf
  153. Lua error in package.lua at line 80: module 'strict' not found.
  154. Lua error in package.lua at line 80: module 'strict' not found.
  155. Editorial, Canada train disaster bolsters pipeline case: Our view, USA Today, 11 July 2013.
  156. U.S. EIA, Williston Basin crude oil production and takeaway capacity are increasing
  157. Diana Furchtgott-Roth, Quebec tragedy reminds us pipelines are safest way to transport oil, The Globe and Mail, 8 July 2013.
  158. Lua error in package.lua at line 80: module 'strict' not found.
  159. Lua error in package.lua at line 80: module 'strict' not found. "IndraStra Global : Analysis, On The Dot"
  160. 161.0 161.1 Pew Center, Continued Support for Keystone XL Pipeline, 26 Sept. 2013.
  161. Lua error in package.lua at line 80: module 'strict' not found.
  162. Rasmussen Reports, 56% See Keystone XL Pipeline As Good for the Economy, 6 January 2014.
  163. Washington Post-ABC Poll, Public approves of Keystone pipeline project, 17 April 2014.
  164. USA Today, Slight majority backs Keystone pipeline, 28 January 2014.
  165. CBS News, CBS News poll database, May 2014.
  166. Lua error in package.lua at line 80: module 'strict' not found.
  167. Lua error in package.lua at line 80: module 'strict' not found.
  168. 169.0 169.1 Lua error in package.lua at line 80: module 'strict' not found.
  169. Lua error in package.lua at line 80: module 'strict' not found.
  170. Lua error in package.lua at line 80: module 'strict' not found.
  171. Lua error in package.lua at line 80: module 'strict' not found.
  172. Lua error in package.lua at line 80: module 'strict' not found.
  173. Lua error in package.lua at line 80: module 'strict' not found.
  174. Lua error in package.lua at line 80: module 'strict' not found.
  175. Lua error in package.lua at line 80: module 'strict' not found.
  176. Lua error in package.lua at line 80: module 'strict' not found.
  177. Lua error in package.lua at line 80: module 'strict' not found.
  178. Lua error in package.lua at line 80: module 'strict' not found.
  179. Lua error in package.lua at line 80: module 'strict' not found.
  180. Lua error in package.lua at line 80: module 'strict' not found.
  181. Lua error in package.lua at line 80: module 'strict' not found.
  182. Lua error in package.lua at line 80: module 'strict' not found.
  183. Lua error in package.lua at line 80: module 'strict' not found.
  184. http://www.transcanada.com/gulf-coast-pipeline-project.html
  185. Jill Burke, Alaska watches Canadians consider shipping tar sands oil across Arctic Ocean, Alaska Dispatch, 30 April 2013
  186. TransCanada, Energy East News Release, August 1, 2013
  187. Lua error in package.lua at line 80: module 'strict' not found.
  188. Lua error in package.lua at line 80: module 'strict' not found.
  189. Lua error in package.lua at line 80: module 'strict' not found.
  190. Lua error in package.lua at line 80: module 'strict' not found.
  191. Lua error in package.lua at line 80: module 'strict' not found.
  192. TransCanada to launch NAFTA claim over Keystone rejection, The Globe and Mail, January 6, 2016

External links