Kochi LNG Terminal

From Infogalactic: the planetary knowledge core
Jump to: navigation, search
Kochi LNG Terminal
Other names(s) Kochi LNG
General information
Location Puthuvype, Kochi
Status Under construction
Coordinates Lua error in package.lua at line 80: module 'strict' not found.
Developer Petronet LNG Ltd
Construction start 2007
Commission August, 2013
Land area 33.4 ha for storage and re-gasification terminal
23 ha for marine facilities
Technical details
Capacity 5 MMTPA
Length 300 m
Draft 12 m
Website Petronet LNG Limited

Kochi LNG is a liquefied natural gas (LNG) regasification terminal in Puthuvype, Kochi, India. The LNG terminal has been constructed and commissioned in August, 2013 at a cost of Rs.4,200 crores.[1][2][3]

General Information

The terminal has been developed by Petronet LNG having the capacity to store and distribute 5-million tonnes per annum. The terminal is currently operating at 8 percent capacity. The present customers are Fertilisers and Chemicals Travancore (FACT),BPC0L and Nitta Gelatin India Ltd. So far, two vessels carrying LNG had berthed at the terminal and had unloaded them. [1][4][5]Petronet LNG gets the supply of 14.4 lakh tons of LNG per year for the Kochi terminal from the Gorgon project in Australia for a 20-year period as per the deal signed in August 2009. [5][6]

Location

The terminal is located in Puthuvype near the city of Kochi.

Facilities

  • Marine Terminal to receive vessels up to 2,16,000 m3 capacity
  • Facilities for storage, re-gasification and dispatch of gas.

References

  1. 1.0 1.1 Lua error in package.lua at line 80: module 'strict' not found.
  2. Lua error in package.lua at line 80: module 'strict' not found.
  3. Lua error in package.lua at line 80: module 'strict' not found.
  4. Lua error in package.lua at line 80: module 'strict' not found.
  5. 5.0 5.1 Lua error in package.lua at line 80: module 'strict' not found.
  6. Lua error in package.lua at line 80: module 'strict' not found.

See also