Construction began 1979
Opening date 1985
Dam and spillways
Type of dam Rock-fill dam
Impounds Drini River
Height 130 m (427 ft)
Length 275 m (902 ft)
Reservoir
Creates Koman Reservoir
Total capacity 16,000,000,000 m3 (5.7×1011 cu ft)
Surface area 12 km2 (5 sq mi)
Max. water depth 96 m (315 ft)
Power station
Turbines 4 × 150 MW
Installed capacity 600 MW

The Koman Hydroelectric Power Station is a large hydroelectric power station, for which a dam on the Drin River was built. The dam is near the settlement of Koman, northern Albania. It is the second of three dams on the Drin River; the Fierza Hydroelectric Power Station upstream, and the Vau i Dejës Hydroelectric Power Station downstream. The dam, 130m tall, was completed in 1985 and the reservoir was filled with water at full capacity in 1986.[1]

Completed in 1986, the power station consists of four turbines of French origin with a nominal capacity of 150 MW each, totalling the installed capacity to 600 MW.[2]

See also

External links

  1. Lua error in package.lua at line 80: module 'strict' not found.
  2. Komani Hydro Power Plant


<templatestyles src="Asbox/styles.css"></templatestyles>

<templatestyles src="Asbox/styles.css"></templatestyles>