Kozhikode Light Metro

From Infogalactic: the planetary knowledge core
Jump to: navigation, search
Kozhikode Metro Rail
Overview
Native name കോഴിക്കോട് മെട്രോ റെയിൽവേ
Locale Kozhikode, Kerala, India
Transit type Mass Rapid Transit
Number of lines 1 (Phase I)
Number of stations 22 (Phase I)
Daily ridership 148,000 (2015- 16 estimate)
Operation
Operation will start
Operator(s) Malabar Metro Rail Corp.
Headway 5 minutes
Technical
System length 44 kilometres (27 mi) (Phase I)
Track gauge 1,435 mm (4 ft 8 12 in) standard gauge

Kozhikode Light Metro is a proposed mass rapid transport system (MRTS) for the city of Kozhikode (Calicut), in India. In 2010, the State government explored the possibility of implementing a metro rail project for Kozhikode city and its suburbs. The proposal was to have a corridor connecting the Karipur Airport to the Kozhikode Medical College Hospital through the heart of the city. An inception report was submitted by a Bangalore-based consultant, Wilber Smith, on the detailed feasibility study on the prospect of implementing the Mass Rapid Transport System (MRTS) and Light Rail Transit System (LRTS) in the city. However, the project has been scrapped to be replaced by Kozhikode Monorail project. The State Cabinet then decided to form a special purpose vehicle (SPV) to implement monorail projects in Kozhikode and Thiruvananthapuram, and administrative sanction was given in October 2012.[1] The state government issued orders entrusting the Thiruvananthapuram Monorail project to the KMCL on 26 November 2012. The government had handed over the Kozhikode Monorail project to the KMCL prior to that.[2] On 12 June 2013, the State Cabinet gave clearance for an agreement to be signed between KMCL and DMRC, that would make the latter the general consultant for the monorail projects in Kozhikode and Thiruvananthapuram.[3] The DMRC will receive a consultancy fee of 3.25% of the 55.81 billion ( 35.90 billion for Thiruvananthapuram and 19.91 billion for Kozhikode).[4] The agreement was signed on 19 June 2013.[5] However due to cost overrun and the cold response from the bidders the project was put on hold. Bombardier Transportation was the only bidder for the project. The project was later scraped and Light metro was proposed.[6][7][8][9]

History

The proposal

The Union Urban Development Ministry decided to consider the proposal for a Metro in Kozhikode after the success of the Delhi Metro and signed up for drawing the detailed project report (DPR) of the Rs.27.71 billion Kozhikode metro transport project with Delhi Metro Rail Corporation as a feasibility study for the introduction of suburban services in Kozhikode city. The Ministry decided to bear 50% of the cost of the preparation of the DPR for the city that comes under the population cut-off bracket. The preliminary feasibility study had been carried out by the National Transportation Planning and Research Centre (NATPAC) in association with the Kerala Road Fund Board in December 2008. Based on this feasibility report, the Board entrusted Wilber Smith to conduct the study in June 2009. Already, the NATPAC has submitted a metro rail project covering a total distance of 32.6 km from Karipur to the Calicut Medical College. The cost of the project was estimated at Rs. 27.71 billion and was expected be completed within five years. The monorail project which replaced the metro rail project was estimated to cost Rs 1,991 crore has received a bid from the lone bidder Bombardier consortium, and was almost double of the estimate. The project was scrapped and the Light Metro has been approved.[6][7][8][9]

Proposed route

As per the proposal for Metro, it would start from Karipur Airport, touching Ramanattukara, Meenchanda, Mini- Bypass, Arayadathupalam and culminate at the Medical College. . An estimated 2083,000 people would get the benefits of the new transportation system by 2031. The project, which can be partly finished within three years, will be economically and technically feasible. However the detailed project report prepared by Delhi Metro Rail Corporation, the alignment for Kozhikode Monorail is retained for the Light metro poject.

The funding

The Union government was in favour of implementing the project with private participation, ruling out its own financial involvement. The Ministry of Urban Development and the Planning Commission were also against government investment in the project, and refused to accept it as a project in line with the Delhi Metro and Chennai Metro. The political rivalry between the earlier Left Front government in Kerala and the UPA government at the Centre was a major reason for such developments and the slow down in the project. The change in government in Kerala changed that scenario, making the Kozhikode Metro one of the top priorities of the UDF government. But later, not to affect the Kochi Metro project The Kerala cabinet under the Chief Ministership of Oommen Chandy decided to give clearance only for the Kozhikode Monorail project, replacing the Metro rail project.

The newly proposed Light Metro is proposed to be implemented as government initiative expecting a viability gap funding from the central and state government. Remaining fund is expected to be sourced internally and externally form competent agencies.[9]

Proposes plan

The project was proposed to cover a distance of 14.2 km with 15 stations, from Medical College Hostel to Meenchanda.[10] The car depot was proposed to be located about 500 metres east of the Medical College Hostel station on 5.20 hectares of vacant land owned by the government.[11]

The monorail was proposed to be built in two phases. The first from Medical College to Mananchira and the second from Mananchira to Meenchantha.[10] Approximately 10.65 hectares of land was to be required for the project,[12] of which 80% is government owned land.[13]

Phase Terminals Length (km) Stations Opening date
Phase I Medical College Mananchira
Phase II Mananchira Meenchanda
Total Medical College Meenchanda 14.20 15
Error creating thumbnail: File with dimensions greater than 25 MP

Stations

Kozhikode monorail was proposed to have a total of 15 stations.[14]

# Station Name Opening Connections
1 Medical College Hostel None
2 Medical College None
3 Chevayur None
4 Thondayad None
5 Kottuli None
6 New Bus Stand Private inter-city buses
7 KSRTC KSRTC buses
8 Mananchira None
9 Palayam Private intra-city buses
10 Railway Station Indian Railways
11 Pushpa None
15 Kallayi None
13 Panniyankara None
14 Vattakkinar None
15 Meenchanda None

Planned future expansion

The government had planned to extend the monorail to Civil Station and West Hill. It would have required 600 crore (US$89 million) for the 6 km stretch connecting Malaparamba and Civil Station.[15]

References

  1. Lua error in package.lua at line 80: module 'strict' not found.
  2. Lua error in package.lua at line 80: module 'strict' not found.
  3. Lua error in package.lua at line 80: module 'strict' not found.
  4. Lua error in package.lua at line 80: module 'strict' not found.
  5. Kerala Monorail, Delhi Metro ink consultancy agreement | Business Line
  6. 6.0 6.1 Lua error in package.lua at line 80: module 'strict' not found.
  7. 7.0 7.1 Lua error in package.lua at line 80: module 'strict' not found.
  8. 8.0 8.1 Lua error in package.lua at line 80: module 'strict' not found.
  9. 9.0 9.1 9.2 Lua error in package.lua at line 80: module 'strict' not found.
  10. 10.0 10.1 Lua error in package.lua at line 80: module 'strict' not found.
  11. Cite error: Invalid <ref> tag; no text was provided for refs named EOI1
  12. Lua error in package.lua at line 80: module 'strict' not found.
  13. Cite error: Invalid <ref> tag; no text was provided for refs named autogenerated1
  14. Lua error in package.lua at line 80: module 'strict' not found.
  15. Lua error in package.lua at line 80: module 'strict' not found.

External links