Lafarge Lake–Douglas station

From Infogalactic: the planetary knowledge core
Jump to: navigation, search
Lafarge Lake–Douglas
Translinkevergreen.png
SkyTrain station
Coordinates Lua error in package.lua at line 80: module 'strict' not found.
Owned by TransLink
Platforms Centre platform
Tracks 2
Construction
Structure type Elevated
Disabled access Yes
Other information
Fare zone 3
History
Opened 2017 (planned)
Services
Preceding station   TransLink   Following station
toward VCC–Clark
Evergreen Extension Terminus

Lafarge Lake–Douglas will be the SkyTrain terminus station of the planned Evergreen Extension of the Millennium Line to Coquitlam, in Metro Vancouver, Canada. It will be located just northeast of the Pinetree Way / Guildford Way intersection, and will serve the David Lam campus of Douglas College and Coquitlam Town Centre. Work to prepare for the construction of Lafarge Lake–Douglas Station began in early July with on-going construction today.[1]

Timeline

As of January 2014, the whole area of the future station has been fenced off and has been a construction site since August 2013. Work is advancing with utility work and foundations for the support structures of the guideway for the line under construction.

As of mid-April, two support structures for the station have been constructed.

Other Details

Construction of the Evergreen Extension began in the summer of 2012. The extension is expected to open for service in early 2017.

References

  1. Lua error in package.lua at line 80: module 'strict' not found.

<templatestyles src="Asbox/styles.css"></templatestyles>

<templatestyles src="Asbox/styles.css"></templatestyles>