Lagos Rail Mass Transit

From Infogalactic: the planetary knowledge core
Jump to: navigation, search
Lagos Rail Mass Transit
Overview
Owner Lagos State Managed by Eko Rail under a Concession Agreement
Locale Lagos, Nigeria
Transit type Rapid Transit
Number of lines 1 under construction (Blue Line)
6 more planned (Red, Green, Yellow, Purple, Brown and Orange)
Operation
Operation will start 2017
Operator(s) Lagos Metropolitan Area Transport Authority (LAMATA)
Technical
System length 35 km (22 mi) (planned)
Track gauge 1,435 mm (4 ft 8 12 in) Standard Gauge

Blue & Red Lines
Agbado
Iju
Agege
Ikeja
Shogunle
AirportMurtala Muhammed International Airport
Hafoluku
Ajao Estate
Oshodi
Mushin
Jibowu
Yaba
Ebute Metta
Depot
Okokomaiko
LASU
Volkswagen
Trade Fair
Alakija
Festac
Mile 2
Alaba
Iganmu
National Theatre
Lagos Harbour
Iddo Mainline rail interchange
Ebute Ero
Marina

Lagos Rail Mass Transit is a system being developed and under construction[1] in Lagos, Nigeria. The system is being sponsored by the Lagos Metropolitan Area Transport Authority (LAMATA) and is envisioned to consist eventually of seven lines.[1] The railway equipment including electric power, signalling, rolling stock, and fare collection equipment will be provided by the private sector under a Concession Contract. LAMATA is responsible for policy direction, regulation, and infrastructure for the network.[2] The concessionaire will generate its own dedicated electricity.[3] The first section of the network (Phase I of the Blue Line) was originally scheduled to enter revenue service by the first quarter of 2014.[1] But as of 2015, details of the project were still being worked out, and the system may not enter service before 2018–19.[4]

Timeline

2008 – A metro is proposed for Lagos, allegedly with a completion date of 2011.
2009 – Construction commences on the Blue Line.[1]
2010 – Lagos Rail Mass Transit to proceed.[citation needed]
2017 – Phase I (the Blue Line from Marina to Mile 2) set to open in 2017.[5]

History

The idea of developing rapid transit in Lagos dates from the 1980s with the Lagos Metroline network conceived by the Alhaji Lateef Jakande during the Second Nigerian Republic.[6] The initial Metroline project was scrapped in 1985 by Muhammadu Buhari at a loss of over $78 million to the Lagos tax payers.[7] The idea of developing a light rail network for Lagos was revived by Governor Bola Tinubu in the early 2000s with a formal announcement of its construction in December 2003.[8] This initial $135 million proposal was part of the greater Lagos Urban Transportation Project to be implemented by the newly formed Lagos Metropolitan Area Transport Authority (LAMATA).[8] LAMATA initially concentrated on developing a Bus Rapid Transit system, running from Mile 12 to Lagos Island. In 2008, LAMATA began also to make progress with the rail project, focusing initially on the Blue Line and the Red Line.

Rolling stock

In September 2011, LAMATA announced that it would acquire some H5-series subway trains formerly used by the Toronto Transit Commission (TTC). The cars are being refurbished in the United States and converted to standard gauge before being imported and put into service on the Blue and Red lines. The same contract also included an option for some H6-series subway cars from the TTC, however this has since been cancelled.[9][10][11][12] The trains were built as two-unit married pairs[13] with a driver's cab in the front right corner of each car.[14]

In January 2015, LAMATA has opted for Chinese-built trains instead, ordering 15 electric multiple units with an option for 14 more.[15] About 76 H5 cars that had been taken for refurbishment to Buffalo, New York, have been scrapped by August 2015.[16]

Routes

Okokomaiko-Marina Blue Line

In April 2008, the Lagos State Government approved 70 billion for construction of the Okokomaiko-Iddo-Marina Line, with an estimated completion date of 2011.[2] Advisory services are being provided by CPCS Transcom Limited, an Infrastructure Development consulting firm based in Ottawa, Canada. Construction actually commenced in January 2010, and completion is now expected in 2015.[17] The Blue Line is now being built by China Civil Engineering Construction Corporation. The Blue Line will run 27.5 km from Marina to Okokomaiko, with 13 stations. End-to-end journey time will be approximately 35 minutes. It is being built as a high capacity, electrically powered rail mass transit system. Most of the route will be on the surface, running east-west, in the central reservation of the rebuilt Badagry Expressway between Igbo-Elerin Road (Okokomaiko) and Iganmu. The line will run on elevated structure from Iganmu along the south side of the expressway passing the junction with Eric Moore Road, crossing just south of the National Theatre to Iddo, then south to Lagos Island with a terminal at Marina. Construction is underway between National Theatre and Mile 2. A Maintenance and Storage Facility (MSF) will be constructed at Okokomaiko, with a track connection from the Blue Line to the depot. The entire Blue Line will operate over a secure and exclusive right-of-way, with no level crossings and no uncontrolled access by pedestrians or vehicles. Lagos State is financing construction of the Blue Line from its own resources. A concession contract is being awarded to finance, supply and operate the railway equipment, including electric power, signalling, trains, and fare collection.

Agbado-Marina Red Line

The second line, the Red Line, will run from Marina to Agbado.[17] The line will share the existing 30 metre wide Nigerian Railway Corporation (NRC) right-of-way.[1]

Other lines

LAMATA has long term plans to build up to seven lines.[17]

See also

References

  1. 1.0 1.1 1.2 1.3 1.4 Lua error in package.lua at line 80: module 'strict' not found.
  2. 2.0 2.1 Lua error in package.lua at line 80: module 'strict' not found.
  3. Lua error in package.lua at line 80: module 'strict' not found.
  4. Lua error in package.lua at line 80: module 'strict' not found.
  5. https://businessdayonline.com/2015/10/lagos-light-rail-now-to-be-completed-2017/
  6. Lua error in package.lua at line 80: module 'strict' not found.
  7. Lua error in package.lua at line 80: module 'strict' not found.
  8. 8.0 8.1 Lua error in package.lua at line 80: module 'strict' not found.
  9. Lua error in package.lua at line 80: module 'strict' not found.
  10. Lua error in package.lua at line 80: module 'strict' not found.
  11. Lua error in package.lua at line 80: module 'strict' not found.
  12. Lua error in package.lua at line 80: module 'strict' not found.
  13. Lua error in package.lua at line 80: module 'strict' not found.
  14. Lua error in package.lua at line 80: module 'strict' not found.
  15. Lua error in package.lua at line 80: module 'strict' not found.
  16. Lua error in package.lua at line 80: module 'strict' not found.
  17. 17.0 17.1 17.2 Lua error in package.lua at line 80: module 'strict' not found.
  • Lua error in package.lua at line 80: module 'strict' not found.
  • Lua error in package.lua at line 80: module 'strict' not found.
  • Lua error in package.lua at line 80: module 'strict' not found.
  • Lua error in package.lua at line 80: module 'strict' not found.

External links