Markham GO Station
Markham
|
|||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Location | 214 Main Street North Markham, Ontario Canada |
||||||||||
Coordinates | Lua error in package.lua at line 80: module 'strict' not found. | ||||||||||
Platforms | 1 side platform | ||||||||||
Tracks | 1 | ||||||||||
Connections | Lua error in package.lua at line 80: module 'strict' not found. Lua error in package.lua at line 80: module 'strict' not found. Lua error in package.lua at line 80: module 'strict' not found. | ||||||||||
Construction | |||||||||||
Structure type | Station building with public washroom and waiting room | ||||||||||
Parking | 413 spaces | ||||||||||
Bicycle facilities | yes | ||||||||||
Disabled access | Yes | ||||||||||
Other information | |||||||||||
Station code | GO Transit: MKGO | ||||||||||
Fare zone | 72 | ||||||||||
History | |||||||||||
Opened | 1871 T&NR 1982 GO Transit |
||||||||||
Services | |||||||||||
|
|||||||||||
Designated | 1992 | ||||||||||
Reference no. | 6762 |
Markham GO Station is a railway station in the GO Transit[1] network located on Markham Main Street North in Markham, Ontario in Canada. It is a stop on the Stouffville line, which only has peak hour train service. Off-peak and contra-peak service is provided by buses stopping on-street adjacent to the station. Busses on GO bus route 54 (Markham-York University) on the 407 East Corridor also stop here
Contents
History
The station was built in 1871 by the Toronto and Nipissing Railway,[2] which was taken over by the Grand Trunk Railway, which ultimately became part of the Canadian National Railway in 1923. It has been designated as a heritage railway station[3] by the Historic Sites and Monuments Board of Canada.
The station design is based on classic Canadian Railway Style with elements of the Vernacular-Carpenter Gothic architecture of the mid-19th Century Ontario.[citation needed]
The city of Markham purchased the building as a Millennium project and are undertaking its restoration[4] in conjunction with the Markham Village Conservancy, which manages the station.[5] In addition to facilities for GO Transit, the building is used as community centre, with two rooms with a capacity of either 100 or 30 people, available for rental.[6]
Connecting services
GO Transit
- The Stouffville line weekday train service consists of six trains southbound to Union Station in the morning and six trains northbound to Lincolnville in the afternoon. Service at other times and in other directions is provided by buses.
- Route 54 (Hwy 407 East GO Bus), operates between Mount Joy and York University Main Campus.
York Region Transit
- Route 41 Markham Local
- Route 201 Markham GO Shuttle
Toronto Transit Commission
- 102D Markham Road northbound to Major Mackenzie Drive and southbound Warden Subway Station (second longest bus route after 54 Lawrence East[7]).
This route is operated by the TTC on behalf of the YRT
See also
References
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ CNR in Ontario; Railway Station Reports - Report RSR-137, Markham
- ↑ List of Designated Heritage Railway Stations in Ontario
- ↑ Markham Train Station Restoration Project
- ↑ Markham Village Conservancy
- ↑ Community Information and Volunteer Centre - York Region: Markham Village Train Station
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
External links
- Media related to Lua error in package.lua at line 80: module 'strict' not found. at Wikimedia Commons
- GO Transit station page for Markham GO Station
- Pages with broken file links
- Articles with unsourced statements from February 2015
- GO Transit railway stations
- Transport in Markham, Ontario
- Buildings and structures in Markham, Ontario
- Railway stations in York Region
- Railway stations opened in 1871
- Canadian National Railway stations in Ontario
- Designated Heritage Railway Stations in Ontario
- 1871 establishments in Ontario