New Ulaanbaatar International Airport
New Ulaanbaatar International Airport Хөшигийн хөндийн нисэх буудал |
|||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
File:NewUlaanbaatarAirport.png
Project logo
|
|||||||||||
250px
Rendering of the proposed look
|
|||||||||||
IATA: none – ICAO: none | |||||||||||
Summary | |||||||||||
Airport type | Public | ||||||||||
Owner | Government of Mongolia | ||||||||||
Operator | Civil Aviation Authority of Mongolia | ||||||||||
Location | Ulaanbaatar, Mongolia | ||||||||||
Elevation AMSL | 1,366 m / 4,481 ft | ||||||||||
Coordinates | Lua error in package.lua at line 80: module 'strict' not found. | ||||||||||
Website | www.nubia.mn | ||||||||||
Map | |||||||||||
Location within Mongolia | |||||||||||
Runways | |||||||||||
|
The New Ulaanbaatar International Airport, or the Khöshig Valley Airport (Mongolian: Хөшигийн хөндийн нисэх буудал[1]) is a new international airport presently under construction[2] in 52 km south of Ulaanbaatar city center in Sergelen sum, Töv Province, Mongolia. It will serve Ulaanbaatar and its metropolitan area.[3][4][5][6][7][8]Also aim for an airline hub which connect Europe and East Asia, North America and South East Asia(through Polar route).
Overview
The airport is designed with the capacity of up to three million passengers per year,[9] and has ability and space for a possible future expansion of up to twelve million passengers yearly. It will also be equipped with 24-hour all-weather air traffic control system.[10] It is assumed that on average, the airport will take roughly 2.5 million passengers annually. In comparison,the current airport, Chinggis Khaan International Airport, the largest airport in Mongolia, serves about 900,000 passengers per year (2011 figures). Cargo capacity is set to increase 10-fold.[11]
There will be 2 runways, road and rail terminal, next - a city with a population of about 100 thousand people. Design capacity - 1,100 passengers per hour.[3][4]
Development
In May 2008, a ¥28.8 billion (US$385 million) 40-year soft loan agreement at 0.2% interest was signed between the Government of Mongolia and the Japan Bank for International Cooperation to build a new international airport.[5][6] The loan requires that the project is to be carried out by Japanese Consultants and Contractors however the materials and equipment the Contractors use can be up to 70% from any country. Between 2009 and 2011, Azusa Sekkei and Oriental Consultants Joint Venture made the design and bid documentation for the airport. In 2011, a call for bids was announced for the construction of the airport, with the Mitsubishi-Chiyoda Joint Venture (MCJV) successful in the Technical Bidding. An extended Price review and Contract negotiation was completed on the 10 May 2013 when the main construction contract was signed between MCJV and the Civil Aviation Authority of Mongolia .[7][8]
Construction
The project was begun with a ground breaking ceremony. Taking place on 22 April 2012,[12][13] the first work started was a site flood protection scheme. Other works under way were the construction of the electric power line from Nalaikh.
Construction was started in May 2013, and is expected to finish December 2016. The New Ulaanbaatar International Airport Construction Project Steering Committee visited the project construction work site on 11 September 2013 to see the progress of construction work.[14] The concrete pouring work of control tower started on 13 September 2013.[15]
On 29 January 2013, the airport's electric substation construction was completed and connected to the Mongolian central grid.[16]
Name
The construction project name for the airport is:
Alternative names:
- Khöshig Valley International Airport
- Khöshig International Airport
- Ulaanbaatar Khöshig International Airport
See also
References
- ↑ Temporary names
- ↑ Progress being made in Khushigt Valley international airport construction
- ↑ 3.0 3.1 АВИА Порт
- ↑ 4.0 4.1 Новости
- ↑ 5.0 5.1 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 6.0 6.1 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 7.0 7.1 gogo.mn Хөшигийн нисэх буудлыг "Мицубиши Чиёодо" барина
- ↑ 8.0 8.1 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Ulaanbaatar airport
- ↑ [1] Contract for new international standard airport signed
- ↑ Ulaanbaatar to Have New International Airport
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ The New Ulaanbaatar International Airport Construction Project Government Steering Committee Site Visit
- ↑ Control Tower First Structural Concrete Pour
- ↑ Төвийн эрчим хүчний системээс байнгын эрчим хүчтэй холбогдлоо
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.