Newburyport/Rockport Line

From Infogalactic: the planetary knowledge core
Jump to: navigation, search
NEWBURYPORT/
ROCKPORT LINE
300px
An outbound train crosses the Mystic River
Overview
Type Commuter Rail
Locale Greater Boston
Termini North Station
Newburyport or Rockport
Stations 12 (Newburyport Line)
14 (Rockport Line)
(7 serve both lines)
Services 2
Operation
Owner Massachusetts Bay Transportation Authority
Operator(s) Keolis North America
Technical
Track gauge 4 ft 8 12 in (1,435 mm)
Route map
former route to Portland, Maine
Portsmouth(closed 1965)
North Hampton(closed 1965)
Hampton(closed 1965)
New Hampshire
Massachusetts
Newburyport
Rowley
Ipswich
Hamilton/Wenham
North Beverly
Rockport
Gloucester
Gloucester Draw
over Annisquam River
Harbor(closed 1985)
West Gloucester
Manchester
Manchester Draw
over Manchester Harbor
Beverly Farms
Prides Crossing
Montserrat
Beverly Depot
Beverly Draw
over Danvers River
Salem
Peabody Branch
(freight only)
Salem Tunnel
Salem(moved 1987)
South Salem (proposed)
Swampscott
Lynn
Saugus Branch
River Works
GE employees only
Saugus Draw
over Saugus River
Chelsea
Silver Line SL6 (opening 2017)
Chelsea(opening 2017)
Saugus Branch
Mystic River
Haverhill Line
Boston Engine Terminal
MBTA employees only
Fitchburg and Lowell Lines
Charles River Bridge
North Station

The Newburyport/Rockport Line is a branch of the MBTA Commuter Rail system, running northeast from downtown Boston, Massachusetts towards Cape Ann and the Merrimack Valley, serving the North Shore. The first leg serves Chelsea, Lynn, Swampscott, Salem, and Beverly. From there, a northern branch of the line serves Hamilton, Ipswich, Rowley, and Newburyport. The line also branches east from Beverly, serving Manchester, Gloucester, and Rockport. A bicycle coach is offered on the Rockport branch during the summer.[1]

History

<templatestyles src="Module:Hatnote/styles.css"></templatestyles>

After 22 years terminating at Ipswich, the line was restored to Newburyport in 1998

The Eastern Route main line between Boston and Portsmouth, New Hampshire opened in 1836 as the Eastern Railroad. Ferries were used to transport passengers between the East Boston terminal and Boston proper. The line was extended to Portland, Maine, in 1842 under a track-sharing agreement with the Boston and Maine Railroad.[2] The Gloucester Branch was constructed in 1847, but despite local support, it was not extended to Rockport until November 1861.[3] In 1854, with the opening of the Grand Junction Railroad, the Eastern Railroad acquired direct access to downtown Boston.[2] This access was more convenient than its previous access, which required using the Saugus Branch or the South Reading Branch Railroad.

The Boston & Maine leased the Eastern Railroad in 1884, and in 1893 the new North Union Station became the terminus of the B&M, its subsidiaries the Eastern Railroad and Boston & Lowell Railroad, and the Fitchburg Railroad.

In the 1970s, the B&M passenger service - which by that time was almost exclusively commuter service - began to become financially unviable until the MBTA subsidized, and then acquired, the services. The line beyond Newburyport was abandoned in 1982; however, commuter service had been cut back from Newburyport to Ipswich in 1976.[2] In 1998, service was restored to Newburyport.

In the late 1980s, the MBTA planned to construct a park and ride relief station off Route 107 in Saugus. A $400,000 planning study was funded in February 1988; the proposed $11 million station would have had 1,000 parking spaces and opened in late 1991.[4] The station was not built; instead, a high-level platform and parking garage opened at Lynn in January 1992.[5]

Movable bridges and replacements

Draw Number 7 shortly before replacement

Owing to its position along the North Shore coastline, the Newburyport/Rockport Line has a large number of river crossings, including movable bridges over the Saugus River and Danvers River on the mainline as well as Days Creek and the Annisquam River on the Rockport Branch. Draw Number 7 over the Mystic River between Somerville and Everett, built in 1877, was the oldest jackknife drawbridge in the country until it was replaced by a fixed high-level concrete span on August 26, 1989. The new $34.2 million bridge, which was completed nine months ahead of schedule, eliminated the 5 miles per hour (8.0 km/h) speed restriction on the old bridge.[6][7]

Two other bridges are in planning for major modification. The Beverly Drawbridge spanning the Danvers River will undergo a multi-year reconstruction process. The abutments of the approach spans will be repaired, followed by a 21-day service shutdown in April 2017 for the complete replacement of the swing bridge section.[8] The MBTA Board approved the $16.2 million contract in February 2016; work will last from March 2016 to December 2017.[9]

The Gloucester Drawbridge over the Annisquam River consists of a steel drawbridge and western approach span with a timber trestle for the eastern approach. It was built in 1911, modified in 1932, and substantially repaired in 1984-85. It will be completely replaced with a modern box beam bridge on steel piles.[10] As of February 2016, bidding is planned to begin by June for the $34 million project, though funding has not been allotted. Construction will take four years.[11]

South Salem

In February 2001, the MBTA began two parallel planning processes for the North Shore region: a Draft Environment Impact Statement for the Blue Line Extension (DEIS), and a Major Investment Study (MIS) for other projects primarily north of Salem. The MIS, released in 2004, identified a number of possible improvements to the Newburyport/Rockport Line, including upgrades to current stations, grade crossing eliminations, signal system improvements, increased frequencies, a second Salem tunnel, a branch line to Danvers, and new stations at Revere and South Salem.[12] A South Salem station would Salem State University, the North Shore Medical Center, and residential areas south of downtown Salem - some of which were served by the pre-1987 station but only by the 455 and 459 buses thereafter. The station was estimated to cost $12.2 to $13.8 million with a single island platform serving the line's two tracks, and would draw about 600 daily riders.[12] Two possible locations were considered: one with access from Laurel Street and the platform running to the north, and one with access from Ocean Avenue and the platform running to the south.[13][14]

None of the projects in the DEIS or MIS was actually built due to lack of funding, except for parking structures at Salem and Beverly which were mandated as Big Dig mitigation. In January 2015, Salem mayor Kim Driscoll indicated her support for a South Salem station in her State of the City address.[15] A feasibility study, released in March 2016, analyzed four possible station locations, including three sites near the MIS locations plus one at Jefferson Avenue to the south. The station would have two side platforms and cost between $15 million and $20 million depending on the site.[16] The study received mixed reactions from Salem residents, including concerns about construction, lights, and trains idling near a residential area but also hope for improved transit accessibility and higher property values.[17][18]

Station listing

State Milepost[19] City Station Connections and notes
MA 0.0 Boston Handicapped/disabled access North Station Downeaster
MBTA Bus: 4
MBTA Commuter Rail: Fitchburg Line, Lowell Line, Haverhill Line
MBTA Subway: Orange Line, Green Line
4.6 Chelsea Chelsea MBTA Bus: 112, 114
Station will be moved and made accessible in 2016.
9.9 Lynn River Works No weekend service; for River Works employees only
11.5 Handicapped/disabled access Central Square - Lynn MBTA Bus: 426, 426W, 429, 431, 435, 436, 439, 441, 442, 455, 456, 459
12.8 Swampscott Handicapped/disabled access Swampscott MBTA Bus: 441, 442, 455, 459
16.8 Salem Handicapped/disabled access Salem MBTA Bus: 450, 450W, 451, 455, 456, 459, 465
18.3 Beverly Handicapped/disabled access Beverly Depot CATA: Beverly Shuttle
MBTA Bus: 451

Newburyport Branch

State Milepost[19] City Station Connections and notes
MA 20.8 Beverly Handicapped/disabled access North Beverly MBTA Bus: 451
22.7 Hamilton Handicapped/disabled access Hamilton/Wenham
27.6 Ipswich Handicapped/disabled access Ipswich CATA: Purple Line (seasonal)
31.2 Rowley Handicapped/disabled access Rowley
36.2 Newburyport Handicapped/disabled access Newburyport MVRTA: 54

Rockport Branch

State Milepost[19] City Station Connections and notes
MA 19.8 Beverly Handicapped/disabled access Montserrat
22.2 Prides Crossing
22.9 Handicapped/disabled access Beverly Farms
25.4 Manchester Handicapped/disabled access Manchester
29.6 Gloucester Handicapped/disabled access West Gloucester CATA: Purple Line
30.6 Harbor Closed station; was open from 1977 to 1985
31.6 Handicapped/disabled access Gloucester CATA: Red Line, Orange Line, Yellow Line, Green Line, Blue Line, Purple Line
35.3 Rockport Handicapped/disabled access Rockport CATA: Red Line, Green Line, Blue Line

Gallery

References

  1. Lua error in package.lua at line 80: module 'strict' not found.
  2. 2.0 2.1 2.2 Lua error in package.lua at line 80: module 'strict' not found.
  3. Lua error in package.lua at line 80: module 'strict' not found.
  4. Lua error in package.lua at line 80: module 'strict' not found.
  5. Lua error in package.lua at line 80: module 'strict' not found.
  6. Lua error in package.lua at line 80: module 'strict' not found.
  7. Lua error in package.lua at line 80: module 'strict' not found.
  8. Lua error in package.lua at line 80: module 'strict' not found.
  9. Lua error in package.lua at line 80: module 'strict' not found.
  10. Lua error in package.lua at line 80: module 'strict' not found.
  11. Lua error in package.lua at line 80: module 'strict' not found.
  12. 12.0 12.1 Lua error in package.lua at line 80: module 'strict' not found.
  13. Lua error in package.lua at line 80: module 'strict' not found.
  14. Lua error in package.lua at line 80: module 'strict' not found.
  15. Lua error in package.lua at line 80: module 'strict' not found.
  16. Lua error in package.lua at line 80: module 'strict' not found.
  17. Lua error in package.lua at line 80: module 'strict' not found.
  18. Lua error in package.lua at line 80: module 'strict' not found.
  19. 19.0 19.1 19.2 Cite error: Invalid <ref> tag; no text was provided for refs named bluebook

External links

Script error: No such module "Attached KML".