Ningde Nuclear Power Plant

From Infogalactic: the planetary knowledge core
Jump to: navigation, search
Ningde Nuclear Power Plant
Ningde Nuclear Power Plant is located in China
Ningde Nuclear Power Plant
Location of Ningde Nuclear Power Plant in China
Official name 宁德核电站
Country People's Republic of China
Location Fuding, Ningde, Fujian
Coordinates Lua error in package.lua at line 80: module 'strict' not found.
Status Operational
Construction began 2008
Commission date December 2012
Construction cost US$7.6 billion (units 1–4)
Owner(s) Ningde Nuclear Power Co Ltd (NDNP)
Nuclear power station
Reactor type CPR-1000 PWR
Power generation
Units operational 3 × 1080 MW
Units under const. 1 × 1080 MW
Units planned 2 × 1080 MW

Ningde Nuclear Power Plant (simplified Chinese: 宁德核电站; traditional Chinese: 寧德核電站; pinyin: Níngdé hé diàn zhàn) is a nuclear power plant in Fujian province, China. The site is located in Beiwan village in the town of Qinyu, Fuding, Ningde, Fujian.[1] The plant will ultimately have six 1,080 megawatt (MWe) CPR-1000 pressurized water reactors (PWRs).[2] The first reactor began operation on 18 April 2013.[3]

The Ningde Nuclear Power project was approved by the National Development and Reform Commission (NDRC) in 2007.[4] The project is 51% funded by the Guangdong Nuclear Investment Company Ltd, with Datang International Power Generation Co and the Fujian Coal Group completing the shareholding. A total investment of 52 billion yuan (US$7.6 billion) should result in the completion of Ningde Phase I.[5] Including the final two units of Phase II, the total cost will exceed 70 billion yuan.[4] The four units of Phase I will generate about 30 billion kilowatt hours per year, for which the plant will charge 0.37 yuan/kW·h (11 billion yuan/year).[6]

Ningde marks a step in the development of China's domestic nuclear industry. Shu Guogang, GM of China Guangdong Nuclear Power Project said, "We built 55 percent of Ling Ao Phase 2, 70 percent of Hongyanhe, 80 percent of Ningde and 90 percent of Yangjiang Station."[7]

Site preparation at Ningde ran through 2007, with the first concrete for Ningde 1 poured in February 2008.[8] Ningde 2 followed nine months later. Construction of each unit is expected to take 58 months.[9] Ningde 1 was grid connected on 28 December 2012 and entered full commercial operation on 18 April 2013.[3][10]

Unit Type Construction start Grid connection Commercial operation Notes
Phase I
Ningde 1 CPR-1000 18 February 2008 28 December 2012 18 April 2013 [11]
Ningde 2 CPR-1000 12 November 2008 4 January 2014 4 May 2014 [12]
Ningde 3 CPR-1000 8 January 2010 21 March 2015 10 June 2015 [13][14]
Ningde 4 CPR-1000 29 September 2010 2015 [15]
Phase II
Ningde 5 CPR-1000
Ningde 6 CPR-1000

See also

References

  1. Lua error in package.lua at line 80: module 'strict' not found.
  2. Lua error in package.lua at line 80: module 'strict' not found.
  3. 3.0 3.1 Lua error in package.lua at line 80: module 'strict' not found.
  4. 4.0 4.1 Lua error in package.lua at line 80: module 'strict' not found.
  5. Lua error in package.lua at line 80: module 'strict' not found.
  6. Lua error in package.lua at line 80: module 'strict' not found.
  7. Lua error in package.lua at line 80: module 'strict' not found.
  8. Lua error in package.lua at line 80: module 'strict' not found.
  9. Lua error in package.lua at line 80: module 'strict' not found.
  10. Lua error in package.lua at line 80: module 'strict' not found.
  11. Lua error in package.lua at line 80: module 'strict' not found.
  12. Lua error in package.lua at line 80: module 'strict' not found.
  13. Lua error in package.lua at line 80: module 'strict' not found.
  14. Lua error in package.lua at line 80: module 'strict' not found.
  15. Lua error in package.lua at line 80: module 'strict' not found.

External links

  • Images:
    • Lua error in package.lua at line 80: module 'strict' not found.
    • Lua error in package.lua at line 80: module 'strict' not found.
  • Ningde Nuclear Power Plant, China