Norwood Junction rail accident

From Infogalactic: the planetary knowledge core
Jump to: navigation, search

Lua error in package.lua at line 80: module 'strict' not found.

Norwood Junction rail accident
Date 1 May 1891
Location Norwood Junction railway station
Country England
Rail line Brighton Main Line
Operator London, Brighton and South Coast Railway
Cause Bridge collapse
Statistics
Trains 1
Passengers ~200
Deaths 0
Injuries 1
List of UK rail accidents by year

The Norwood Junction railway crash occurred on 1 May 1891, when a cast iron underbridge over Portland Road, 60 yards north east of Norwood Junction railway station, fractured under an express train from Brighton to London Bridge.

The locomotive crossed the bridge safely with most of its carriages, but the brake van fell into the gap on the bridge. There were no serious casualties: a passenger suffered a dislocated ankle; four further passengers were slightly injured and the guard in the foremost brake van received head and arm injuries.[1] The accident drew attention to the weakness of cast iron structures in underbridges, especially as many had been installed in the 1830s and 1840s when locomotives and carriages were much lighter.

Causes

The bridge belonged to the London Brighton and South Coast Railway and had been reconstructed in 1859. The Board of Trade investigation was carried out by General Hutchinson, who had investigated a similar bridge failure at Carlisle in 1875. He found that the single girder that cracked was seriously flawed with a very large hidden casting defect in the flange and web. Even if perfect, the girder design did not meet current Board of Trade requirements for safety margins on cast-iron girder underbridges, and this was already known from a previous accident.

"The attention of the Brighton Company was drawn by the Board of Trade to this deficiency of strength after ... the accident on this bridge in December 1876 when two identical girders at a different part of the same bridge were broken by an engine getting off the rails, and they were then recommended to substitute stronger girders in their place, a recommendation to which unfortunately no attention was paid, or the present serious accident would have been prevented; the Brighton Company is therefore, in my opinion, deserving of much blame for having omitted to substitute stronger girders for the existing ones after attention had been thus specially directed to the weakness of the latter"

A cast-iron rail bridge girder had fractured under a passing train at Inverythan in Scotland in 1882, with five passengers killed and many more injured. The accident report commented on the problem of latent defects, but had concentrated attention in the first instance on composite girders, bolted together mid-span, and those of over 25 ft span. The Portland Road bridge did not use composite girders, and its span was 25 ft. (The failed girder in the Carlisle incident was non-composite, with a 25-ft span and had a major hidden casting defect. It had been built before the 1847 Dee bridge disaster[2] and the consequent specification by the Board of Trade of required wide safety margins on cast-iron structures; even if perfect it would have not have met them. The bridge had been rebuilt with wrought-iron girders and the failure had not triggered any wider survey of cast-iron bridges.)

General Hutchinson recommended that all cast-iron girder bridges on the LB&SCR network be inspected. The task fell to Sir John Fowler, who recommended that many be replaced by wrought iron (or preferably steel) structures, commenting that

"the result of my investigation does not indicate any peculiar weakness in the Brighton bridges which are neither better nor worse in that respect than those on similar lines of railway at home or abroad"

The accident led the Board of Trade to issue a circular requesting details of all cast-iron underbridges on the UK network. There were thousands of them, and most were gradually replaced, but as of 2007 Network Rail stated that there are still many hundreds of cast-iron beam overbridges remaining, many with very low weight restrictions.[citation needed]

References

  1. Hutchinson, pp 3; 6
  2. Hutchinson said it was built in 1826, but it was on the westmost section of the Newcastle and Carlisle Railway, built in 1836
  • Lua error in package.lua at line 80: module 'strict' not found.
  • Lua error in package.lua at line 80: module 'strict' not found.
  • Lua error in package.lua at line 80: module 'strict' not found.