Nyagak III Hydroelectric Power Station

From Infogalactic: the planetary knowledge core
(Redirected from Nyagak III Power Station)
Jump to: navigation, search
Nyagak III Power Station
Nyagak III Hydroelectric Power Station is located in Uganda
Nyagak III Hydroelectric Power Station
Map of Uganda showing the location of
Nyagak III Power Station
Country Uganda
Location Paidha
Coordinates Lua error in package.lua at line 80: module 'strict' not found.
Status Proposed
Dam and spillways
Impounds Nyagak River
Reservoir
Normal elevation 1,380 m (4,530 ft)
Tidal range Directions
Power station
Name Nyagak III Hydroelectric Power Station
Coordinates Lua error in package.lua at line 80: module 'strict' not found.
Commission date 2018 (expected)
Type Run-of-the-river
Turbines 2
Installed capacity (planned) 5.5 MW (7,400 hp)

Nyagak III Power Station is a 5.5 megawatts (7,400 hp) proposed mini hydroelectric power project in Uganda, the third-largest economy in the East African Community.[1]

Location

The power station will be located across the Nyagak River in Nyapea Sub County, Okoro County, Zombo District, in the West Nile sub-region of the Northern Region of Uganda. This is approximately 7 kilometres (4 mi) north of the town of Paidha, close to the border with the Democratic Republic of the Congo, in close proximity to, but downstream of, the existing Nyagak I Power Station.[1]

Overview

In September 2010, an Environmental Impact Assessment (EIA) was concluded by Lahmeyer International GmbH, a German consulting engineering firm.[2] The Uganda Electricity Generation Company Limited (UEGCL) would develop Nyagak III through a Public Private Partnership (PPP). In 2013, the International Finance Corporation assisted UEGCL to identify and select an investor from the private sector, who would invest equity and arrange further debt and equity financing for the project. That investor would then design, develop, and operate the development under a PPP agreement with UEGCL. This selection process was expected to last approximately one year, beginning in July 2013.[3] The selected private investor is a consortium consisting of Hydromax Limited and Dott Services Limited. UEGCL and the consortium then formed a special purpose vehicle, Genmax Nyagak Limited, that would build, operate, and manage the power station.[1]

Construction timetable

It was anticipated that the selection process for the core investor would last until 2014. Construction would then begin in 2015 and last three years, with commissioning anticipated in 2018.[4][5]

Construction costs

In 2011, the construction of Nyagak III Power Station was anticipated to cost approximately US$14 million.[6] The power generated would be evacuated via the existing 33 kilovolt transmission power lines linking the towns of Paidha, Nebbi, Bondo, Okollo, and Arua, constructed at an estimated cost of UGX:44.2 billion (€13 million) between 2013 and 2015 following the development of the Nyagak Power Station.[7]

See also

References

  1. 1.0 1.1 1.2 Lua error in package.lua at line 80: module 'strict' not found.
  2. Lua error in package.lua at line 80: module 'strict' not found.
  3. Lua error in package.lua at line 80: module 'strict' not found.
  4. Lua error in package.lua at line 80: module 'strict' not found.
  5. Lua error in package.lua at line 80: module 'strict' not found.
  6. Lua error in package.lua at line 80: module 'strict' not found.
  7. Lua error in package.lua at line 80: module 'strict' not found.

External links