Ohio State Route 209
State Route 209 | ||||
---|---|---|---|---|
Route information | ||||
Maintained by ODOT | ||||
Length: | 16.63 mi[3] (26.76 km) | |||
Existed: | 1923[1][2] – present | |||
Major junctions | ||||
West end: | SR 83 near New Concord | |||
I-70 in Cambridge | ||||
East end: | I-77 / SR 821 in Byesville | |||
Location | ||||
Counties: | Muskingum, Guernsey | |||
Highway system | ||||
|
State Route 209 (SR 209, OH 209) is an east–west state highway in eastern Ohio, a U.S. state. The western terminus of State Route 209 is at a T-intersection with State Route 83 approximately 3.75 miles (6.04 km) north of New Concord. State Route 209's eastern terminus is concurrent with the northern terminus of State Route 821 at Interstate 77 at its exit 41 in Byesville, just 2.25 miles (3.62 km) southeast of the Interstate's interchange with Interstate 70.
Route description
State Route 209 traverses a small portion of northeastern Muskingum County and a good part of the western half of Guernsey County. No segment of this highway is included within the National Highway System, a network of routes deemed to be most important for the nation's economy, mobility and defense.[4]
History
When it was first designated in 1923, State Route 209 ran along its present alignment from its current western terminus at what was then designated State Route 76 (now State Route 83) north of New Concord to downtown Cambridge.[1][2] By 1959, with the transferring of U.S. Route 21 onto a new alignment from Byesville north that passes to the east of Cambridge along what is now the alignment of Interstate 77, State Route 209 was extended southeasterly from Cambridge to its present eastern terminus in Byesville along the former alignment of U.S. Route 21.[5][6]
Major intersections
County | Location | mi[3] | km | Destinations | Notes |
---|---|---|---|---|---|
Muskingum | Highland Township | 0.00 | 0.00 | SR 83 – New Concord, Coshocton | |
Guernsey | Adams Township | 3.86 | 6.21 | SR 662 north | Southern terminus of SR 662 |
7.19 | 11.57 | SR 658 north – Birds Run | Southern terminus of SR 658 | ||
Cambridge | 9.84 | 15.84 | US 22 west / US 40 west (Dewey Avenue) / Wheeling Avenue | Western end of US 22/US 40 concurrency | |
10.12 | 16.29 | US 22 east / US 40 east (Wheeling Avenue) | Eastern end of US 22/US 40 concurrency | ||
Cambridge Township | 12.18 | 19.60 | I-70 – Columbus, Wheeling | Exit 178 (I-70) | |
Jackson Township | 13.40 | 21.57 | SR 660 west – Claysville | Eastern terminus of SR 660 | |
Byesville | 15.91 | 25.60 | SR 821 south (Second Street) | Western end of SR 821 concurrency | |
16.63 | 26.76 | I-77 / SR 821 end – Marietta, Cleveland | Exit 41 (I-77); eastern end of SR 821 concurrency | ||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
|
References
- ↑ 1.0 1.1 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 2.0 2.1 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 3.0 3.1 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
External links
Script error: No such module "Attached KML".