Park Row (BMT station)

From Infogalactic: the planetary knowledge core
Jump to: navigation, search
Park Row
Former New York City Subway rapid transit station
275px
Park Row station, circa 1905
Station statistics
Address Lua error in package.lua at line 80: module 'strict' not found.
Borough Manhattan
Locale Park Row
Services BMT Fulton Street Line
BMT Myrtle Avenue Line
BMT Lexington Avenue Line
BMT Fifth Avenue Line
Structure Elevated
Platforms 3 island platforms (2 main terminal, 1 west end)
4 side platforms (2 main terminal, 2 west end)
Spanish solution (west end)
Tracks 6 (4 main terminal, 2 west end)
Other information
Opened 1883; 141 years ago (1883)
Closed 1950; 74 years ago (1950)
Station succession
Next north (Terminus)
Next south Sands Street

Park Row was a major elevated railway terminal constructed over the New York end of the Brooklyn Bridge, across from New York City Hall in Manhattan that served as the terminal for BMT services operating over the Brooklyn Bridge Elevated Line from the BMT Fulton Street Line, BMT Myrtle Avenue Line and their feeders. Until the opening of the nearby Williamsburg Bridge to elevated train traffic in 1913, it was the only Manhattan station available for elevated trains from Brooklyn, and the only elevated station in Manhattan to be owned by a company other than the IRT or its predecessors.

Early history (1883-1913)

For the first decade-and-a-half of its existence, it was used exclusively by trains of the New York and Brooklyn Bridge Railway, a cable-hauled line that spanned the length of the bridge between Park Row and another terminal at the Brooklyn end of the bridge.

On June 18, 1898, elevated trains of predecessor companies of the BMT began using the station during off-peak hours, while the cable-hauled shuttle continued to run at rush hours. On January 27, 1908 the shuttle was eliminated and elevated trains began running to Park Row at all times.[1]

At its height, Park Row terminal had four platforms on four tracks in the main part of the terminal, and another three platforms on two tracks beyond (west of) the main train shed. This resulted in very complex scheduling and track shifting, so that most trains discharged their passengers at dedicated exit platforms and then were transferred to tracks on other platforms for loading of outgoing passengers. From the turn of the 20th century until 1913, the following lines were hosted at least part-time at Park Row:

From Fulton Street Line (Kings County Elevated Railway)

From Myrtle Avenue Line (Brooklyn Union Elevated Railway)

Gradual decline (1913-1940)

Circa 1911 view of City Hall Park, with the terminal at right

As new bridges and new subways took the pressure off the Brooklyn Bridge services, ridership at Park Row gradually declined.

Services withdrawn from terminal

  • October 27, 1913: Last day of Sea Beach elevated service, in preparation for the new grade-separated line that began to use the Fourth Avenue subway on June 22, 1915
  • June 23, 1916: West End trains began using the Fourth Avenue subway exclusively
  • August 1, 1920: Brighton Beach trains began using a new connection to the BMT Broadway Line subway, severing its connection with the Fulton Street Line
  • May 30, 1931: Some Culver trains were rerouted to the Fourth Avenue subway and the BMT Nassau Street Line when the latter line opened
  • 1936: Park Row was reconfigured to two tracks total (the two southern main shed tracks) in recognition of its declining use and to simplify operations
  • May 31, 1940: In preparation for New York City takeover of the BMT system, the Fifth Avenue and Bay Ridge lines and services were abandoned, which also ended remaining Culver elevated service via those lines. The main line of the Fulton Street line was abandoned at the same time and, on June 1, a new service, Fulton-Lex, was introduced, bringing trains from the surviving outer portion of the Fulton Street Line to Park Row over the Broadway, Lexington and Myrtle Avenue Lines.

Final operations (1940-1950)

  • March 5, 1944, all remaining elevated lines stopped using Park Row, and the Myrtle Avenue, Lexington Avenue, and Fulton-Lex services were cut back to the Bridge Street station in downtown Brooklyn.

Brooklyn Bridge streetcars were shifted to the elevated tracks and used them until 1950, when all transit was removed from the bridge. The streetcars did not use the Park Row terminal, but continued to use the trolley loops beneath the train shed, which was torn down.

References

  1. Cudahy p168