Tiangong program

From Infogalactic: the planetary knowledge core
(Redirected from Project 921-2)
Jump to: navigation, search

<templatestyles src="Module:Hatnote/styles.css"></templatestyles>

Diagram of Tiangong-1

Tiangong (Chinese: ; pinyin: Tiāngōng; literally: "Heavenly Palace") is a space station program of the People's Republic of China, with the goal of creating a third generation space station, comparable to Mir. This program is autonomous and unconnected to any other international space-active countries.[1] The program began in 1992 as Project 921-2. As of January 2013, China moved forward on a large multiphase construction program that will lead to a large space station around 2020.[2]

China launched its first space laboratory, Tiangong 1, on September 29, 2011. Following Tiangong 1, a more advanced space laboratory complete with cargo ship, dubbed Tiangong 2, will be built. Tiangong 3 will continue to develop these technologies. The project will culminate with a large orbital station, which will consist of a 20-ton core module, 2 smaller research modules, and cargo transport craft.[3] It will support three astronauts for long-term habitation[2] and is scheduled to be completed just as the International Space Station is currently scheduled to be retired.[4]

Project history

In 1999, Project 921-2 was finally given official authorization. Two versions of the station were studied: an 8-metric ton "space laboratory" and 20-metric ton "space station".[citation needed]

In 2000, the first model of the planned space station was unveiled at Expo 2000 in Hanover, Germany. This was made up of modules derived from the orbital module of the Shenzhou spacecraft. Overall length of the station would be around 20 m, with a total mass of under 40 metric tons, with possibility of expansion through addition of further modules.[citation needed]

In 2001, Chinese engineers described a three-step process toward the realization of Project 921. The original target date for the fulfillment of the project was 2010.[citation needed]

  • First, crewed flight itself (Phase 1); this successfully occurred in 2003.
  • Second, the orbiting of a space laboratory (Phase 2, a scaled back version of the initial model) that would only be crewed on a short-term basis and left in an automated mode between visits.
  • The third phase would involve the launch of a larger space laboratory, which would be permanently crewed and be China's first true space station (Phase 3).

Originally, China planned to simply dock Shenzhou 8 and Shenzhou 9 together to form a simple space laboratory. However, it was decided to abandon that plan and launch a small space laboratory instead. In 2007, plans for an 8-metric ton "space laboratory" being launched in 2010 under the designation of Tiangong 1 were made public. This would be an eight-ton space laboratory module with two docking ports. Subsequent flights (Shenzhou 9 and Shenzhou 10) will dock with the laboratory.[5]

On September 29, 2008, Zhang Jianqi (张建启), Vice Director of China crewed space engineering, declared in an interview of China Central Television [6] it is Tiangong 1 (i.e. not Shenzhou 8) that will be the 8-ton "target vehicle", and Shenzhou 8, Shenzhou 9, and Shenzhou 10 will all be spaceships to dock with Tiangong 1 in turn.

On 1 Oct. 2008, Shanghai Space Administration, which participated in the development of Shenzhou 8, stated [7] that they succeeded in the simulated experiments for the docking of Tiangong 1 and Shenzhou 8.

On 16 June 2012, Shenzhou 9 was launched from Jiuquan Satellite Launch Center in Inner Mongolia, China, carrying a crew of three. The Shenzhou craft successfully docked with the Tiangong-1 laboratory on 18 June 2012, at 06:07 UTC, marking China's first manned spacecraft docking.[8]

On 11 June 2013, China launched Shenzhou 10 with a crew of three headed for the Tiangong-1.[9]

The full 60-metric ton "space station" has been delayed to ~2020-2022, and will support three astronauts for long-term habitation.[2]

Details

Space laboratory phase

Chinese efforts to develop LEO space station capabilities will begin with a space laboratory phase, with the launch of three Tiangong space modules.[2]

Tiangong 1 "target vehicle"

Drawing of Shenzhou docked to Tiangong 1

<templatestyles src="Module:Hatnote/styles.css"></templatestyles>

The Chinese docking target consists of a propulsion (resource) module and a pressurized module for experiments, with a docking mechanism at either end. The docking port of the experiment section supports automated docking.[10] Its length is 10.5 metres (34 ft), diameter is 3.4 metres (11 ft),[2] with a mass of 8,000 kilograms (18,000 lb). Launched on September 29, 2011, it is intended for short stays of a crew of three.

Tiangong 2 "space laboratory"

Shenzhou docked to Tiangong 2

<templatestyles src="Module:Hatnote/styles.css"></templatestyles>

As of September 2014, the Chinese Space Lab will be launched in 2016.[11][12]

Configuration is as follows:

  • Crew Size: 3, with 20 days of life support resources.[2]
  • Length: 14.4 metres (47 ft)[1]
  • Maximum Diameter: 4.2 metres (14 ft)[1]
  • Mass: 20,000 kilograms (44,000 lb)[1]
  • Two docking ports[citation needed]

Tiangong 3 "space station"

<templatestyles src="Module:Hatnote/styles.css"></templatestyles>

As of September 2014, the Chinese Space Lab is planned to be launched in the 2020 timeframe,[11] around 2022.[12]

  • 40 days of living conditions for three astronauts[2]
  • Evaluate regenerative life-support technology, and verify orbital replenishment of propellant and air.[2]

Large orbital station

<templatestyles src="Module:Hatnote/styles.css"></templatestyles>

Chinese space station
(Project 921 Phase 3)
20-metric ton "space station"
Chinese large orbital station.png
Drawing of Shenzhou and Cargo ship docked to the large orbital station
Station statistics
Crew 2-3
Launch ~2020-2022
Mass 66,000 kg
Length ~ 20.00 m
Diameter ~ 3.00 m

China plans to build the world's third multi-module space station, to follow Mir and the ISS.[1] This is dependent upon the Tiangong 3 launch date, and the date of OPSEK's separation from the ISS. The previous separate components will be integrated into a space station, arranged as:[2]

  • Core Cabin Module (CCM) - based on the Tiangong 3 "space station" and analogous to the Mir Core Module. The 18.1-meter-long core module, with a maximum diameter of 4.2 meters and a launch weight of 20 to 22 tons, will be launched first.[13]
  • Laboratory Cabin Module I (LCM-1) and Laboratory Cabin Module II (LCM-2) - based on Tiangong 2 "space laboratory". Each laboratory module is 14.4 meters long, with the same maximum diameter and launch weight of the core module.[13]
  • Shenzhou - crewed vessel
  • Tianzhou or "Heavenly Vessel", a cargo craft based on Tiangong-1 that will have a maximum diameter of 3.35 meters and a launch weight less than 13 tons, to transport supplies and lab facilities to the space station. The craft will have three versions, pressurized, unpressurized, and a combination of the two. It is designed to be launched on the new Long March 7 rocket. Both are expected to be launch ready in 2016[13][14][15][16]

The larger station will be assembled in 2020-2022 and have a design lifetime of ten years. The complex will weigh approximately 60,000 kilograms (130,000 lb) and will support three astronauts for long-term habitation.[2] The public is being asked to submit suggestions for names and symbols to adorn the space station and cargo ship. "Considering past achievements and the bright future, we feel that the crewed space program should have a more vivid symbol and that the future space station should carry a resounding and encouraging name," Wang Wenbao, director of the office, said at the news conference. "We now feel that the public should be involved in the names and symbols as this major project will enhance national prestige, and strengthen the national sense of cohesion and pride," Wang said.[13]

International co-operation

After the success of China's crewed space launch, a Chinese official expressed interest in joining the International Space Station program.[17] In 2010, ESA Director-General Jean-Jacques Dordain stated that his agency was ready to propose to the other 4 partners that China, India, and South Korea be invited to join the ISS partnership.[18] China has indicated a willingness to cooperate further with other countries on manned exploration.[19]

See also

References

  1. 1.0 1.1 1.2 1.3 1.4 Lua error in package.lua at line 80: module 'strict' not found.
  2. 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 2.9 Lua error in package.lua at line 80: module 'strict' not found.
  3. Lua error in package.lua at line 80: module 'strict' not found.
  4. Lua error in package.lua at line 80: module 'strict' not found.
  5. Lua error in package.lua at line 80: module 'strict' not found.
  6. Lua error in package.lua at line 80: module 'strict' not found.
  7. Lua error in package.lua at line 80: module 'strict' not found.
  8. Lua error in package.lua at line 80: module 'strict' not found.
  9. China launches fifth manned space mission
  10. Lua error in package.lua at line 80: module 'strict' not found.
  11. 11.0 11.1 Lua error in package.lua at line 80: module 'strict' not found.
  12. 12.0 12.1 Lua error in package.lua at line 80: module 'strict' not found.
  13. 13.0 13.1 13.2 13.3 Lua error in package.lua at line 80: module 'strict' not found.
  14. http://www.spacedaily.com/reports/Space_Odyssey_Chinas_aspiration_in_future_space_exploration_999.html
  15. Lua error in package.lua at line 80: module 'strict' not found.
  16. http://www.spacedaily.com/reports/The_Next_Tiangong_999.html
  17. Lua error in package.lua at line 80: module 'strict' not found.
  18. Lua error in package.lua at line 80: module 'strict' not found.
  19. Lua error in package.lua at line 80: module 'strict' not found.

External links