Richmond railway line

From Infogalactic: the planetary knowledge core
Jump to: navigation, search
Richmond Line
Riverstone railway station platform 1.JPG
View of the duplicated Richmond line as it runs through Riverstone.
Overview
Termini Blacktown
Richmond
Stations 11
Services T1 North Shore, Northern & Western Line
Operation
Opened 1 December 1864 (1864-12-01)
Owner RailCorp
Operator(s) Sydney Trains
Depot(s) Flemington, Eveleigh
Rolling stock S & T sets
Technical
Track gauge 1,435 mm (4 ft 8 12 in) standard gauge
Route map
Kurrajong railway line to Kurrajong
60.68 km Richmond
Bourke Street
60.00 km East Richmond
Racecourse Road
57.21 km Clarendon
Rickabys Creek
54.98 km Windsor
Fairey Road
South Creek
Mulgrave Road
Mulgrave Tank closed 1891
52.59 km Mulgrave
Level Crossing Road
Bandon Road
49.23 km Vineyard
Meatworks
45.96 km Riverstone
Garfield Road
43.75 km Schofields
40.09 km Quakers Hill
37.41 km Marayong
Breakfast Creek
34.87 km Blacktown
from Main Western railway line

The Richmond railway line is a railway line in the western suburbs of Sydney, New South Wales, Australia. It is a branch of the Main Western line. Sydney Trains operates electric passenger train services over the line and markets these as part of the North Shore, Northern & Western Line. The section between Blacktown and Schofields is also served by the Cumberland Line. The line is owned by Sydney Trains.

Description of route

The railway commences between Seven Hills and Blacktown station on the western line in Sydney's western suburbs. This section of the western line consists of four tracks- two "up" tracks (meaning the direction towards Sydney) and two "down" tracks (meaning the direction away from Sydney). A flyover branches off the two "down western" line tracks and passes over the top of the two "up western" tracks to form the "down Richmond line". The "up Richmond track" connects to the two "up Western tracks" at the same point. The line then parallels the Main Western line to Blacktown station.

The line branches off in a northerly direction from the Main Western Line at Blacktown station, and Blacktown platforms 1 and 2 (an island platform) serve the Richmond Line tracks. The line then heads north as a double track electrified line, passing the Blacktown Control Box and Blacktown train sidings to Marayong station, which has an island platform. The line continues north to Quakers Hill (island platform). Two sets of points at Quakers Hill allows trains to terminate on either platform. The line continues north-west through Schofields (island platform) where the double track currently ends. Two sets of points at Schofields allows trains to terminate on either platform.

Continuing to the north-west, the line next reaches Riverstone where a passing loop and two side platforms are provided. Riverstone was the extent of electrification until the early 1990s when electrification was extended to Richmond. The line continues north as a single track through Vineyard station, Mulgrave station (where another passing loop and island platform are provided), Windsor station (single side platform) to Clarendon station. At Clarendon, another passing loop and island platform are located. From Clarendon the line heads north as a single track on its final leg through East Richmond (single side platform) to its terminus at Richmond station. At Richmond, 2 platforms (as a single island) are provided. There is an adjacent storage siding.

History

Schofields station was rebuilt in 2011. As Sydney expands, the Richmond line is being redeveloped to cope with the population influx in the area.

The line opened to Richmond in 1864 under the stewardship of engineer James Moore. In 1926, an extension was opened to Kurrajong, closing in 1952.[1] Electrification from Riverstone to Richmond commenced in 1987 but was suspended in 1988 due to lack of funds, restarting in 1990 and opening in August 1991.[2] Initially electric trains operated as 2-car shuttles between Riverstone to Richmond until the electric power supply was upgraded to allow through running to and from Sydney in 1992.

In 2002 the track between Marayong and Quakers Hill was duplicated.[3] Two further duplications were announced as part of the Rail Clearways Program - from Quakers Hill to Schofields and from Schofields to Vineyard. These provide extra capacity to support increased patronage, as the line passes through the middle of Sydney's "North West Growth Centre". Duplication of the Quakers Hill to Schofields section commenced in 2009 and was completed in October 2011. The extension of the duplication to Vineyard has been deferred.

Richmond Line stations

Notes and references

  1. Lua error in package.lua at line 80: module 'strict' not found.
  2. Lua error in package.lua at line 80: module 'strict' not found.
  3. The history of Marayong, Blacktown City Council

Further reading