Samuel Beckett-class offshore patrol vessel

From Infogalactic: the planetary knowledge core
Jump to: navigation, search
Samuel Beckett under construction at Babcock Marine
Class overview
Name: Samuel Beckett class
Builders: Babcock Marine
Operators: Republic of Ireland Irish Naval Service
Preceded by: Róisín class
Cost: €71m per ship
In commission: 2014-
Building: 1
Planned: 3
Completed: 2
Active: 2
General characteristics
Type: Offshore patrol vessel
Displacement: 1,900 tonnes
Length: 90 m (300 ft)
Beam: 14 m (46 ft)
Draught: 3.8 m (12 ft)
Propulsion:

Two Wärtsilä medium speed diesel engines (5,440 kW (7,300 hp) each)

450 kW bow thruster
Speed:
  • Baseline speed 23 knots (43 km/h; 26 mph)
  • Economical speed 15 knots (28 km/h; 17 mph)
Range: 6,000 nautical miles (11,000 km; 6,900 mi) at 15 knots (28 km/h; 17 mph)[1]
Endurance: 21 days
Boats & landing
craft carried:
2 x 8 m (26 ft) RHIB
Capacity: 3 x 6.1 m (20 ft) sea container, 1 x 5 ton, 9.56 m (31.4 ft) crane aft
Complement: 44 + up to 10 trainees
Sensors and
processing systems:
Fire control: Electro Optical
Armament:
Aviation facilities: UAV only

The Samuel Beckett-class offshore patrol vessel is a class of offshore patrol vessels (OPV) ordered by the Irish Naval Service in October 2010. The first vessel is named Samuel Beckett,[2] which is also the name given to the class. Construction on this first vessel commenced in November 2011,[3] and it was commissioned in May 2014.[4][5] The second vessel was named James Joyce and delivered in 2015,[2] with the third to be named William Butler Yeats and planned for delivery in 2016.[6][7]

Background and design

Vard Marine Inc. (formerly STX Marine) designed the vessels, which have features in common with an earlier design, the Róisín class, in service with the Irish Naval Service since 1999.

The 90-metre (300 ft) OPV vessels are designated PV90 by Babock Marine and approximately 10 metres (33 ft) longer with an additional 0.6 metres (2 ft 0 in) in depth to the existing Róisín-class PV80 vessels.[citation needed] This is intended to increase both its capabilities and abilities in the rough waters of the North Atlantic. The PV90 ship is designed carry a crew of 44 and have space for up to 10 trainees. The ships' published cruising speed is 16 knots (30 km/h; 18 mph), with a top speed of 23 knots (43 km/h; 26 mph).[8]

The New Zealand Navy uses an 85-metre (279 ft) version of the Vard Marine Inc. OPV design referred to as the Protector-class offshore patrol vessel. This is a modified version of the older Irish Navy Róisín-class PV80 vessels with helideck and hangar incorporated.[9]

The new ships are designed to carry remotely operated submersibles and a decompression chamber for divers. This is intended to add enhanced capabilities to undertake search and rescue, search and recovery, under sea exploration and increased sea area surveillance. The expanded deck area would also allow the Navy to deploy unmanned surveillance planes for the first time. Features also include Dynamic Positioning systems and "Power Take In Systems" to enable fuel savings as the main engines can be shut down and power sourced from battery storage or a smaller more economical engine.[10]

The first new ship was commissioned on 17 May 2014 - to replace Emer which was decommissioned on 20 September 2013.

Planning and construction

In 2007 it was reported that the Defence Forces expected to spend in the region of €180m on a replacement for the three existing vessels of Emer class.

In July 2010 the Irish Minister for Defence, Tony Killeen, announced that the Department of Defence and Naval Service would be entering into talks with UK shipbuilder Babcock Marine on two vessels worth €50m each, with an option for a third.

In October 2010 contracts were signed, and the 'cutting of steel' for the first ship occurred on 24 November 2011.[11]

On 19 May 2012 Irish Naval Service Flag Office Commodore Mark Mellett (now Rear Admiral, DCOS Sp) attended the traditional keel-laying ceremony for the first of the 90 m OPVs. While modular construction methods don't strictly involve keel-laying, the term is still considered an important milestone as it signals the first stage of connecting each of the components together. The keel-laying ceremony took place in Babcock Marine’s Appledore Shipbuilding Yard in Devon, UK.[12]

The delivery of the first of the vessels was set for 2014 with the second in 2015.[1][3][13][14] The option on the third vessel was exercised following the commissioning of Samuel Beckett, with delivery scheduled for 2016.[6] Payment for the ships is planned to be extended over a number of years to 2017.[15] The cost of the three new ships including the main armament is €213 million.[16]

Fitting out

The fit-out of crew quarters and facilities on the two new 55 berth ships were contracted to Moss Marine of Southampton in a £4.5 million contract. Fitting out of the first ship began in March 2012 for completion in early 2014.[10][17][18]

Fit-out also included Mercury IP communication systems from Trilogy.[19] Each vessel will have two such systems, the first using VHF, UHF and HF marine radio channels on panels installed throughout the vessel.[20] The second controlling system aims to connect users in pre-configured work groups using interfaces installed at work stations around each vessel.[20]

Names

The first ships were named for Samuel Beckett and James Joyce, as disclosed in July 2013 by the Minister for Defence Alan Shatter in Dáil Eireann.[21] This decision to name the ships after literary figures, seen as controversial in some quarters,[22][23] saw a break from the tradition of naming Irish Naval vessels after women in Irish mythology.

Name Pennant number Builder Laid down Floated out Commissioned Status
Samuel Beckett P61 Babcock Marine Appledore 19 May 2012 3 November 2013[24] 17 May 2014 Active in service
James Joyce P62 5 November 2013 23 November 2014[25] 1 September 2015 Active in service
William Butler Yeats P63 26 November 2014 10 March 2016[26] Under construction

References

  1. 1.0 1.1 Lua error in package.lua at line 80: module 'strict' not found.
  2. 2.0 2.1 Lua error in package.lua at line 80: module 'strict' not found.
  3. 3.0 3.1 Lua error in package.lua at line 80: module 'strict' not found.
  4. Lua error in package.lua at line 80: module 'strict' not found.
  5. Lua error in package.lua at line 80: module 'strict' not found.
  6. 6.0 6.1 Lua error in package.lua at line 80: module 'strict' not found.
  7. Lua error in package.lua at line 80: module 'strict' not found.
  8. Lua error in package.lua at line 80: module 'strict' not found.
  9. Lua error in package.lua at line 80: module 'strict' not found.
  10. 10.0 10.1 Lua error in package.lua at line 80: module 'strict' not found.
  11. Lua error in package.lua at line 80: module 'strict' not found.
  12. Lua error in package.lua at line 80: module 'strict' not found.
  13. Lua error in package.lua at line 80: module 'strict' not found.
  14. Lua error in package.lua at line 80: module 'strict' not found.
  15. Lua error in package.lua at line 80: module 'strict' not found.
  16. http://www.defence.ie/WebSite.nsf/Release+ID/46AB2DC6A89AC21080257E8A005D2774?OpenDocument
  17. Lua error in package.lua at line 80: module 'strict' not found.
  18. Lua error in package.lua at line 80: module 'strict' not found.
  19. Lua error in package.lua at line 80: module 'strict' not found.
  20. 20.0 20.1 Lua error in package.lua at line 80: module 'strict' not found.
  21. Lua error in package.lua at line 80: module 'strict' not found.
  22. Lua error in package.lua at line 80: module 'strict' not found.
  23. Lua error in package.lua at line 80: module 'strict' not found.
  24. Lua error in package.lua at line 80: module 'strict' not found.
  25. Lua error in package.lua at line 80: module 'strict' not found.
  26. Lua error in package.lua at line 80: module 'strict' not found.