Seaport-Airport Road

From Infogalactic: the planetary knowledge core
Jump to: navigation, search
Lua error in Module:Infobox_road/map at line 16: attempt to index field 'wikibase' (a nil value).
Route information
Length: 30 km (20 mi)
Major junctions
North end: Cochin International Airport
  Kalamassery HMT,
Kakkanad,
CRL Road Junction
South end: Cochin seaport
Location
States: Kerala: 30 km (19 mi)
Primary
destinations:
Kalamassery - Kakkanad - Thripunithura - Cochin
Highway system

Seaport-Airport Road (SPAP Road) is a four-lane, 30 km (19 mi) highway from Cochin seaport to the Cochin International Airport developed to improve the transport infrastructure in the Kochi city, India. This highway passes through the Cochin Special Economic Zone and connect such major industrial units as HMT, FACT, and Kochi Refineries as also the various oil terminals at Irumpanam and also boost the flow of cargo traffic both from the port and the airport. The District Headquarters is located on this road. The IT Expressway to Infopark is starting from this road. The 13-km road constructed in the first phase acting as a by-pass to the NH 47 within the Kochi city limits. Petroleum tankers from Irumpanam oil terminals can now move north up to Kalamassery without entering the core city areas. To ensure a smooth and durable road, natural rubber modified bitumen (NRMB) is used.

Phases

Phase I

The first phase is 13 km (8.1 mi) between Kalamassery HMT (Lua error in package.lua at line 80: module 'strict' not found.) and Karingachira Church (Lua error in package.lua at line 80: module 'strict' not found.) near Tripunithura including construction of ROB (Railway Over Bridge) at Irumpanam yard (Lua error in package.lua at line 80: module 'strict' not found.) and ROB at CRL Junction. It was inaugurated in May 2003.

Phase II

Development of 17 km (11 mi) between HMT and Cochin International Airport and up to Kariyad (near Angamaly, Lua error in package.lua at line 80: module 'strict' not found.) in NH 47. Land acquisition for this phase is in progress.The tentative deadline to complete the Rs. 662-crore works is mid-2016. [1]

Phase III

Development of the entire stretch of road between NH 49 Bypass and Cochin International Airport and up to Kariyadu as a four-lane highway. The project has been proposed as a four-lane highway with a design speed of 100 km/hr. After completion of all stretches, this road is expected to ease the pressure on NH 47 especially where it takes more than an hour for a heavy vehicle from the airport to reach the Kochi port.