Jamaica's electricity sector is dominated by non-renewable generators that use petroleum products, primarily Bunker C fuel oil and automotive diesel which generated 93% of the annual output for 2014. There is a small contribution from a few small hydroelectric plants and a couple of wind farms, one of which, Wigton Wind Farm,[1] contributes a very small amount despite being the largest wind farm in the Caribbean.

In 2005, Jamaica embarked on the preparation of a 25-year National Development Plan called "Vision 2030" which encompassed the National Energy Policy 2009–2030.[2] The policy was adopted in late 2009 and followed in 2010 by a National Renewable Energy Policy 2009–2030. According to the message from the then minister responsible for energy, "Since 2005, Jamaica has embarked upon the preparation of a 25-year National Development Plan called Vision 2030 which is expected to put the country in a path to achieve developed country status by 2030. One of the expected outcomes of the plan is the diversification of Jamaica’s energy supply to increase energy security and to contribute to the cost efficiency of the country’s energy sector."

After the National Energy Policy was approved the authorities set about creating a regulatory and technical framework for the interconnection of solar PV systems to the national grid in consultation with the grid operator. The result was the formulation of a Standard Offer Contract for the sale of electricity to the grid under a net billing arrangement.[3] Under the net billing arrangement any electricity not consumed on the premises it is produced, is delivered to the grid and is purchased by the grid operator at a price set by the Office of Utilities Regulation to be close to the avoided cost of generation by the existing suppliers. That price is available at the regulators web site. Any electricity consumed from the grid is billed at the regular retail prices and at the end of the month the difference between the delivered and consumed amounts is settled. Technical guidelines for the interconnection to the grid are also now available and the Government Electrical Inspectorate is prepared to perform inspection of installations. This is the basis on which most major installations have proceeded.

Installed Capacity

More than 20,000 Jamaican homes are expected to be powered by clean, affordable, renewable energy to be generated from the US$61 million solar electricity plant, being built in Content District, Clarendon.

Electricity produced by this 20-megawatt plant, the largest of its kind in the Caribbean, will replace approximately three million gallons of fossil fuel per year.

Construction of the state-of-the art facility will now get underway, following an official ground breaking ceremony at the site, on July 9. [4]

The following are some of the larger installations currently connected to the grid:

Notable PV projects in Jamaica
Owner Location/Parish 2012 kWp 2013 kWp 2014 kWp 2015 kWp Year ? kWp Notes
Grand Palladium Resort & Spa Hanover 1,600 Sized and set up to never feed the grid[5][6]
WISYNCO White Marl 1,000 [7]
Rainforest Seafoods Kingston 460 [8]
J. Wray & Nephew Limited Kingston 450 [9]
Jamaica Broilers Various 600 15 kW systems at about 40 chicken houses[10]
Omni Industries Limited Twickenham Park 300 [11]
Island Grill Kingston 143 [12]
Caribbean Maritime Institute Palisadoes 125 [13]
Courts Jamaica Limited Half Way Tree 113 [14][15]
May Pen Ice May Pen 103 [16]
American International School of Kingston Liguanea 100 [17]
University of Technology Papine 100 [18]
Hillel Academy Norbrook 100 [19]
Tankweld Group Seaward Drive 100 [20][21]
Tankweld Group Rio Bueno 100 [20]
Food for the Poor Spanish Town 100 [22]
Dairy Industries Jamaica Ltd. Pembroke Hall 60 [23][24]
Chas E Ramson Ltd. Kingston 60 [25]
ATL Automotive Oxford Road 58.8 [26]
Myers Fletcher and Gordon Kingston 55 Solar-wind hybrid (additional 25 kW wind)[27]
  Totals 113 878.8 2155 2381 200 5727.8

Rural Electrification

<templatestyles src="Module:Hatnote/styles.css"></templatestyles>

In June 2012 Energy Minister Phillip Paulwell disclosed that, approximately 16,000 homes in remote parts of the island which do not have electricity are to be supplied with solar or wind electricity through the Rural Electrification Programme (REP).[28] At a USAID-funded Analysis and Investigation for Low Emission (AILEG) project symposium, held at the Jamaica Pegasus Hotel, on Tuesday, July 9, 2013, Energy Minister Phillip Paulwell stated that the REP has also been mandated to complete its target of providing electricity to 100 per cent of rural areas. “Those three per cent that now remain are in areas that are so far from the grid, it is too expensive (to provide), and we are going to be deploying photovoltaic systems in these areas,” he explained.[29] In March 2015 he told a newspaper that, by 2017, "we should no longer have REP in the way we do now", adding that if the Government finds it too challenging to run power lines into communities, it will use solar."[30]

See also

References

  1. Lua error in package.lua at line 80: module 'strict' not found.
  2. http://mstem.gov.jm/sites/default/files/National%20Energy%20Policy_0.pdf
  3. http://myjpsco.com/business/net-billing/net-billing-faqs/
  4. http://jis.gov.jm/more-than-20000-homes-to-be-powered-by-new-solar-plant/
  5. Lua error in package.lua at line 80: module 'strict' not found.
  6. Lua error in package.lua at line 80: module 'strict' not found.
  7. http://jamaica-gleaner.com/article/business/20150923/wisynco-commission-solar-farm
  8. Lua error in package.lua at line 80: module 'strict' not found.
  9. Lua error in package.lua at line 80: module 'strict' not found.
  10. http://blogs.worldwatch.org/revolt/jamaican-poultry-producer-not-chicken-about-solar-investment/
  11. http://www.danishgreentech.com/index.php/dgt-blog/95-business-blog/news-updates/173-300-kwp-pv-solution-jamaica
  12. http://www.energynews.es/english/jamaican-company-island-grill-installs-zero-injection-photovoltaic-self-consumption-facility-at-headquarter-office/
  13. http://www.jamaicaobserver.com/environment/Maritime-Institute-unveils-upgraded-simulators_19076831
  14. http://conserveitja.com/index.php/about-company
  15. Lua error in package.lua at line 80: module 'strict' not found.
  16. Lua error in package.lua at line 80: module 'strict' not found.
  17. http://jamaicaobserver.com/environment/Solar-powered-learning_14466066
  18. Lua error in package.lua at line 80: module 'strict' not found.
  19. http://isratech.com/projects/item/424-hillel-academy-100kw-solar-pv-system
  20. 20.0 20.1 http://tankweld.com/?page_id=1092
  21. Lua error in package.lua at line 80: module 'strict' not found.
  22. Lua error in package.lua at line 80: module 'strict' not found.
  23. http://jamaicaobserver.com/business/Solar-boom_14077819
  24. https://mbasic.facebook.com/APSJamaica?v=info&expand=1&nearby
  25. http://www.jamaicaobserver.com/environment/Half-a-million-reasons-to-go-green-_46560
  26. http://jamaicaobserver.com/news/ATL-saves-big-with-solar_16812999
  27. Lua error in package.lua at line 80: module 'strict' not found.
  28. Lua error in package.lua at line 80: module 'strict' not found.
  29. Lua error in package.lua at line 80: module 'strict' not found.
  30. Lua error in package.lua at line 80: module 'strict' not found.