Southern Integrated Gateway

From Infogalactic: the planetary knowledge core
Jump to: navigation, search
Sultan Iskandar Complex Customs, Immigration and Quarantine Complex

Lua error in package.lua at line 80: module 'strict' not found.

The Southern Integrated Gateway (Malay: Gerbang Selatan Bersepadu) refers to a complex in Johor Bahru, Malaysia incorporating the city's main railway station, JB Sentral, and a customs, immigration, and quarantine complex (CIQ), the Sultan Iskandar Building (Malay: Bangunan Sultan Iskandar), named after Sultan Iskandar of Johor.

The station and complex are the main transportation hub of Johor Bahru and southern Peninsular Malaysia. The Malaysian Public Works Department was responsible for the design and construction of the project; Gerbang Perdana Sdn Bhd was the main contractor. This project is part of the Iskandar Malaysia development corridor project.

The CIQ complex was opened to vehicular traffic on 16 December 2008. As of October 2010, the JB Sentral railway station entered operation and service to the old Johor Bahru railway station ceased.

Benefits of the project

The project sought to improve the traffic flow within Johor Bahru Central Business District. The regional road network was enhanced by the linking of the CIQ complex to the North-South Expressway via the Johor Bahru Inner Ring Road. The project also improved the transportation links between Johor Bahru and Singapore.[1]

The project was intended to also attract Singaporean tourists to Johor Bahru and the rest of Johor because of the improved transportation link, which increases convenience and decreases travelling time.

History

Events

Construction of the road leading to highway
Bangunan Sultan Iskandar–Customs, Immigration and Quarantine centre under construction in 2006
Start End Event
End of 2002 The new CIQ complex is proposed.
Early 2003 The Lumba Kuda flats and other structures including Kampung Ungku Mohsin and Bukit Cagar recreational park are demolished.
14 February 2003 The Southern Integrated Gateway is officially launched by Tun Dr Mahathir Mohammad, then Prime Minister of Malaysia.
2 December 2003 Construction of CIQ complex begins.
10 March 2006 The pilings for the new scenic bridge are completed.
12 April 2006 The construction of the new Tanjung Puteri road bridge replacing Malaysian side of causeway was cancelled.
26 April 2006 The 250-million-Ringgit eight-lane straight elevated permanent link from Causeway to the new CIQ complex in Bukit Chagar was proposed by the Ministry of Works and Gerbang Perdana.
30 July 2006 The Johor state government announces plans to build a new Johor Bahru Maglev monorail transit system. It will connect JB Sentral to Tebrau City in the east and JB Sentral to Skudai in the west.
18 January 2007 The construction of the short-term-access temporary road begins.
1 June 2007 30 June 2007 Beam launching works for Tanjung Puteri Bridge as part of the short-term access.
1 July 2007 The new Custom, Immigration and Quarantine Complex building is occupied by the user departments.
Mid-2008 The Bukit Cagar flats are demolished.
1 December 2008 The new Custom, Immigration and Quarantine (CIQ) Complex building is officially named the "Sultan Iskandar Complex" by the Sultan of Johor. The customs complex was opened to cars and motorcycles entering Johor Bahru on the same day.[2]
16 December 2008 The Sultan Iskandar Complex is opened to all road traffic.
21 October 2010 JB Sentral opens for railway operations.
12 November 2011 New 8 lane straight road opened to all road traffic

Main components

Sultan Iskandar Building

Immigration checkpoint to enter Johor Bahru
See also Sultan Iskandar Building

JB Sentral transportation hub

See also JB Sentral
Entrance to JB Sentral, lit at night.

JB Sentral is the transport hub for Johor Bahru, similar to KL Sentral in Kuala Lumpur. The total area of JB Sentral is 79,000 square metres (850,000 sq ft), almost two times larger than KL Sentral (42,000 m2 or 450,000 sq ft). The hub has a KTM railway station (opened on 21 October 2010) and a bus station, which occupies an area of 9,500 square metres (102,000 sq ft). The bus station is expected to handle approximately 15,000 bus passengers per hour, reducing traffic congestion at the 20-year-old Larkin Terminal Station. There are 2,000 parking spaces allocated at JB Sentral.

The trains operate in a north-south orientation. The site's western boundary is constrained by the Caltex petrol station abutting the rail track fencing; Jalan Jim Quee to the east has a platform level up to 8 metres (26 ft) higher, which slopes to the rail tracks.

The terminal is designed to operate six rail lines and four island platforms (530 m × 8 m or 1,739 ft × 26 ft) on a straight alignment. The JB Sentral building is designed to fit this narrow site by placing the passenger hall and ticketing offices directly above the rail tracks, with escalators and lifts providing access to the rail platforms below.

A pedestrian bridge connects JB Sentral to Johor Bahru City Square the Tun Abdul Razak Complex.

Transportation chief advisor Dato Ong Seng Yon (Masai) announced that a new metro system, similar to Shenzhen Metro system will be constructed beginning around 2015 to include JB Sentral as its main terminal. The project is expected to complete by end of 2020. The system would be known as RAPID JB (Rangkaian Pengangkutan Integrasi Deras Johor Bahru).[citation needed][needs update]

A new MRT station which is Singapore MRT will be built at Tanjung Puteri by 2020.

Links to other roads

Bangunan Sultan Iskandar, seen from car heading towards Jalan Lingkaran Dalam

The 250-million-Ringgit, eight-lane, straight elevated permanent link on the originally planned flyover bridge is a main road from the Johor-Singapore Causeway to the new CIQ complex. The old checkpoint for light vehicles, the Tanjung Puteri Customs Complex for heavy vehicles, and the old checkpoint bridge were demolished starting in May 2009.

There is a flyover connecting this project to the Johor Bahru Inner Ring Road and a new highway, the JB Eastern Dispersal Link, which links the Southern Integrated Gateway to the interchange of the North-South Expressway Southern Route near Pandan.

The construction of the new Permas Jaya second bridge commenced in 2008.

Critical reception

On its opening day on 16 December 2008, motorists entering Malaysia from Singapore were greeted by a plague of problems such as long queues and traffic confusion. Public transport was also badly affected; some commuters said that crossing the causeway took them almost two hours, rather than 15 minutes as it had with the old checkpoint.[3] (Although the new checkpoint boasts 76 lanes for cars, these 76 lanes split from only one lane that enters the complex. This is because there are only two lanes entering the complex. Of these, one is for cars, and one is for buses and other vehicles.) There was also reportedly a lack of signs and policemen, causing many motorists to get lost within the complex.[4]

In January 2009, a notice issued to pedestrians walking to the customs complex caused confusion among pedestrians and the Singapore custom authorities. Government officials have noted the danger of walking into the customs complex, and proposed a ban on pedestrians. This led to a critical response from pedestrians, who complained of the massive jams that they often faced, as well as noting that the structure of the road leading up to the complex was extremely dangerous and unsuitable for pedestrians.[5]

Occupants of the Sultan Iskandar CIQ Complex and JB Sentral

<templatestyles src="Div col/styles.css"/>

See also

References

External links