Tōkai Transport Service Jōhoku Line

From Infogalactic: the planetary knowledge core
Jump to: navigation, search
Jōhoku Line
300px
A TKJ KiHa 11-300 series diesel car on the Johoku Line in May 2016
Overview
Native name 城北線
System JR Central
Status Operational
Locale Aichi Prefecture, Japan
Termini Kachigawa
Biwajima
Stations 6
Daily ridership 1,384 (FY2009)
Website www.tkj-i.co.jp
Operation
Opened 1 December 1991 (1991-12-01)
Owner JR Central
Operator(s) Tokai Transport Service Company (TKJ)
Rolling stock KiHa 11 DMUs
Technical
Line length Lua error in Module:Convert at line 1851: attempt to index local 'en_value' (a nil value).
Track gauge 1,067 mm (3 ft 6 in)
Minimum radius 400 m
Electrification Not electrified
Operating speed 95 km/h (60 mph)

The Jōhoku Line (城北線 Jōhoku-sen?) is a Japanese commuter rail line between Kachigawa Station in Kasugai and Biwajima Station in Kiyosu in Aichi Prefecture. Trains are operated by Tokai Transport Service Company, or TKJ in short, while its rail facilities belong to Central Japan Railway Company (JR Central). TKJ, a wholly owned subsidiary of JR Central, operates this line.

Services

All trains stop at all stations, and there are no limited stop rapid services. Services operate once per an hour in daytime, and 2 or 3 times per an hour in morning and evening.[citation needed]

Stations

All stations are in Aichi Prefecture.

Station Japanese Distance (km) Transfers Location
Kachigawa 勝川 0.0 Chuo Main Line Kasugai
Ajiyoshi 味美 1.8
Hira 比良 4.5 Nishi-ku, Nagoya
Otai 小田井 6.7 <templatestyles src="Plainlist/styles.css"/>
Owari-Hoshinomiya 尾張星の宮 9.3 Kiyosu
Biwajima 枇杷島 11.2 Tokaido Main Line

Rolling stock

The line is operated using a fleet of four KiHa 11 single-car diesel multiple unit DMUs.[1]

When the line first opened, services were operated using KiHa 40 series single-car DMUs leased from JR Central. These were painted in the TJK livery of cream with orange window band.[2]

Up until April 2015, the fleet consisted of four KiHa 11-200 series cars (KiHa 11-201–204), based at Kachigawa Depot.[3] Two of these (KiHa 11-203 and 204) were sold to the Hitachinaka Kaihin Railway in Ibaraki Prefecture in April 2015.[3] KiHa 11-201 was withdrawn from Johoku Line services on 23 September 2015, and sold to the Hitachinaka Kaihin Railway. It was replaced from 24 September 2015 by KiHa 11-300 series car KiHa 11-301, purchased from JR Central.[4] The remaining KiHa 11-200 series car (KiHa 11-202) is scheduled to be replaced by a KiHa 11-300 series car in 2016.[5]

History

The line was originally planned by Japanese National Railways (JNR) in the 1960s as a freight-only line linking the Chuo Main Line at Kachigawa with the Tokaido Main Line at Biwajima.[1] Construction began in March 1976, but was subsequently halted due to the huge deficit of JNR.[1] The line consisted of two separate sections, one between Setoshi and Kōzōji, and another between Kachigawa and Biwajima. Construction of the both sections resumed later, as passenger lines, but by different operators. The former section, the current Aichi Loop Line, was succeeded by Aichi Loop Railway, while the latter, the current Jōhoku Line, was succeeded by JR Central and TKJ. The first section of the Jōhoku Line, between Kachigawa and Owari-Hoshinomiya, opened on 1 December 1991.[1] The section between Owari-Hoshinomiya and Biwajima opened on 18 March 1993.[1]

Passenger statistics

In fiscal 2009, the line was used by an average of 1,384 passengers daily.[1]

See also

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 Lua error in package.lua at line 80: module 'strict' not found.
  2. Lua error in package.lua at line 80: module 'strict' not found.
  3. 3.0 3.1 Lua error in package.lua at line 80: module 'strict' not found.
  4. Lua error in package.lua at line 80: module 'strict' not found.
  5. Lua error in package.lua at line 80: module 'strict' not found.

External links