TenneT

From Infogalactic: the planetary knowledge core
Jump to: navigation, search
TenneT Holding B.V.
Government-owned limited liability company (BV)
Industry Electricity
Founded 1998 (1998)
Headquarters Arnhem, Netherlands
Number of locations
435 (Substations)
Area served
Netherlands
Germany
Key people
J.M. Kroon CEO
Services Electric power transmission
Revenue € 1,525 million (2011)
Total assets € 8,569.8 million (2011)
Owner Dutch Ministry of Finance
Number of employees
1,985 (2011)
Subsidiaries
  • TenneT Offshore GmbH
  • TenneT TSO B.V.
  • TenneT TSO GmbH
Website www.tennet.org

TenneT B.V. is the national electricity transmission system operator of the Netherlands, headquartered in Arnhem. Controlled and owned by the Dutch government, it is responsible for overseeing the operation of the 380 and 220 kV high-voltage grid throughout the Netherlands and its interconnections with neighbouring countries. It is additionally responsible for the 150 kV grid in South Holland. In Germany, it is one of the four transmission system operators operating through its subsidiary TenneT TSO GmbH.

As of 2006, it operates 3,286 km of lines and cables at 150 kV and above, connecting at 51 high-voltage substations.[1] Peak demand for 2006 was 14,846 MW.[1] The sole shareholder is the Dutch Ministry of Finance.

History

External images
image icon TenneT grid map, small
image icon TenneT grid map, large (PDF) Archive

TenneT was formed in 1998 when the Dutch electricity industry was liberalised, and was incorporated as a business in 2001 with the passing of the Electricity Production Sector Transition Act.[2] Its statutory tasks included management of the national transmission grid and maintaining the balance between electrical supply and demand. In 2003, it acquired the regional system operator Transportnet Zuid-Holland.[2]

TenneT moved beyond these regulated businesses in 2004 when it entered the gas market by acquiring EnergieKeuze, an online gas and power contract exchange market.[2] In 2005 TenneT further expanded its operations when, together with the Belgian and French TSOs Elia and RTE and the APX and Powernext power exchanges, it formed the Belgian Power Exchange Belpex. This granted it a right to participate in the Belgian electricity market.[2]

German Transmission System Operator: Tennet, 50Hertz Transmission, Amprion and TransnetBW

Since 1 January 2010, Tennet owns the German high‑voltage grid operator Transpower Stromübertragungs GmbH, formerly a part of E.ON, now renamed to Tennet TSO GmbH.[3] The agreed value of transaction was €885 million. The company quoted several reasons for the merger, including price equalization, improved grid balancing, greater insight into grid situations, and better possibilities for sustainable development in both countries.

TenneT is a partner in European Market Coupling Company.

DC links

In 2006, TenneT entered into construction of the 700 MW NorNed undersea HVDC submarine power cable with the Norwegian transmission operator Statnett. Commercial operation of the link was delayed by poor weather and a break in the cable, but it eventually entered operation on the night of 6 May 2008.[4] Connecting the Norwegian and Dutch grids at Feda and Eemshaven, the ±450 kV bipolar cable is, at 580 kilometres (360 mi), the longest undersea power line in the world.[5] During the first two months of test operations, it generated approximately 50 million in revenue, greatly exceeding estimates, and recovering 12% of its cost of construction.[6]

TenneT has formed a joint venture with the British transmission operator National Grid for a 260-kilometre (160 mi) 1,000 MW BritNed DC link between the Isle of Grain, Kent and Maasvlakte, near Rotterdam.[7] Operation is projected to begin in late 2010.[7] The BritNed interconnection would serve as vital link for the foreseeable European super grid project.

A 700MW submarine power cable called COBRA (like NorNed, also from Eemshaven) to Denmark is planned with Energinet.dk[8] for 2019, signing contracts with Siemens and Prysmian in 2016.[9]

Its subsidiary Transpower Stromübertragungs together with Statnett plans the 1400MW NORD.LINK cable between Norway and Germany for 2020.[10]

TenneT plans SuedLink, an onshore DC link between Hamburg and south Germany (near Frankfurt), but local opposition means that a timeline is unclear.[11]

TenneT plans onshore AC upgrades in North Germany, connecting new wind power to some of the above DC links.[12]

See also

References

  1. 1.0 1.1 Lua error in package.lua at line 80: module 'strict' not found.
  2. 2.0 2.1 2.2 2.3 Lua error in package.lua at line 80: module 'strict' not found.
  3. Lua error in package.lua at line 80: module 'strict' not found.
  4. Lua error in package.lua at line 80: module 'strict' not found.
  5. Lua error in package.lua at line 80: module 'strict' not found.
  6. Lua error in package.lua at line 80: module 'strict' not found.
  7. 7.0 7.1 Lua error in package.lua at line 80: module 'strict' not found.
  8. Lua error in package.lua at line 80: module 'strict' not found.
  9. Siemens and Prysmian will build the COBRA interconnection between Denmark and the Netherlands Energinet.dk, 1 February 2016.
  10. Lua error in package.lua at line 80: module 'strict' not found.
  11. http://suedlink.tennet.eu/suedlink/bedarf/suedlink-entscheidender-faktor-der-energiewende.html
  12. Leitungsbauprojekte in Schleswig-Holstein (Stand: Oktober 2015)

External links