Walkway over the Hudson

From Infogalactic: the planetary knowledge core
(Redirected from Walkway Over the Hudson)
Jump to: navigation, search

Lua error in package.lua at line 80: module 'strict' not found.

Walkway over the Hudson
Poughkeepsie Bridge 115997.jpg
Poughkeepsie-Highland Railroad Bridge in 1978, viewed from the northwest, in Highland
Carries railroad (1889–1974)
walkway (2009–present)
Crosses Hudson River
Locale Poughkeepsie, New York to Highland, New York
Characteristics
Design Cantilever
deck truss bridge
Total length 6,768 feet (2,063 m)
Width 35 feet (11 m)[1]
Height 212 feet (65 m)
Longest span 2 × 548 feet (167 m)
Number of spans 7
Clearance above unlimited
Clearance below 160 feet (49 m)
History
Constructed by Manhattan Bridge Building Company
Construction begin 1886
Construction end 1889
Opened January 1, 1889 (railroad)
October 3, 2009 (walkway)
Poughkeepsie-Highland Railroad Bridge
Walkway over the Hudson is located in New York
Walkway over the Hudson
Location Poughkeepsie, New York
Coordinates Lua error in package.lua at line 80: module 'strict' not found.
Built 1886–1888
Architect O'Rourke,John F.; Union Bridge Co.
NRHP Reference # 79001577
Added to NRHP February 23, 1979 (original)
May 20, 2008 (additional documentation)[2][3]
The University of Wisconsin varsity sport rowing team competing in the Intercollegiate Rowing Association regatta on June 11, 1914 at the Poughkeepsie Bridge

The Walkway over the Hudson (a.k.a. Poughkeepsie Bridge, Poughkeepsie Railroad Bridge, Poughkeepsie-Highland Railroad Bridge, High Bridge) is a steel cantilever bridge spanning the Hudson River between Poughkeepsie, New York on the east bank and Highland, New York on the west bank. Built as a double track railroad bridge, it was completed on January 1, 1889 and formed part of the Maybrook Railroad Line. It was taken out of service on May 8, 1974 after it was damaged by fire. It was listed on the National Register of Historic Places in 1979, updated in 2008.[2][3] It was opened as Walkway Over the Hudson State Historic Park on October 3, 2009, as a pedestrian walkway, making it the longest footbridge in the world.[4]

History

Construction

The South Mountain and Boston Railroad plans for a Hudson-crossing bridge began before the Civil War. On October 27, 1855, an engineer proposed that a railroad bridge be built across the Hudson River at Poughkeepsie, via a letter published in the Poughkeepsie Eagle newspaper. The proposal seemed so absurd that the Eagle ridiculed it, and it was effectively forgotten until 1868.[5] Over the years, many plans had been made for a fixed span across the Hudson River south of Albany to replace numerous car float and ferry operations. One of the most persistent was originally chartered in 1868 as the Hudson Highland Suspension Bridge Company, and would have crossed from Anthony's Nose to Fort Clinton, now roughly the site of the Bear Mountain Bridge. This proposed bridge was never built.

The Poughkeepsie Bridge Company was chartered in June 1871 to build the bridge, and J. Edgar Thomson of the Pennsylvania Railroad was persuaded to support the effort. Contracts were let to a firm called the American Bridge Company (not the company of the same name founded later), but the Panic of 1873 intervened and the scheme collapsed.

In 1886, the Manhattan Bridge Building Company was organized to finance the construction. Among the prominent backers was Henry Clay Frick, the coal tycoon and associate of Andrew Carnegie. The Union Bridge Company of Athens, Pennsylvania, which had completed the Michigan Central cantilever bridge at Niagara (see Niagara Cantilever Bridge), was subcontracted to build the Poughkeepsie Bridge. Dawson, Symmes and Usher were the foundation engineers, while John F. O'Rourke, P. P. Dickinson and Arthur B. Paine were the structural engineers. The bridge was designed by Charles Macdonald and Arthur B. Paine. As is typical for cantilever bridges, construction was carried out by constructing cribwork, masonry piers, towers, fixed truss sections on falsework, and finally cantilever sections, with the final cantilever interconnection (suspended) spans floated out or raised with falsework. The first train crossed the bridge on December 29, 1888, and it was formally opened for scheduled passenger service on January 1, 1889.

The bridge was considered an engineering marvel of the day and has seven main spans. The total length is 6,768 feet (2,063 m), including approaches, and the top of the deck is 212 feet (65 m) above water. It is a multispan cantilever truss bridge, having two river-crossing cantilever spans of 548 feet (167 m) each, one center span of 546 feet (166 m), two anchor (connecting) spans of 525 feet (160 m), two shore spans of 201 feet (61 m)each, a 2,641 feet (805 m) approach viaduct on the eastern bank and a 1,033 feet (315 m) approach viaduct on the western bank. All seven spans were built of newly available Bessemer Process "mild" (between 0.16% and 0.29% carbon) steel, while the two approach viaducts were built of iron. It formed part of the most direct rail route between the industrial northeastern states and the midwestern and western states.[6]

Operation

Poughkeepsie Bridge ca. 1900

The bridge remained as the only fixed Hudson River crossing between Albany and New York City until the construction of the Bear Mountain (road) Bridge in 1924, and was advertised as a way to avoid New York City car floats and railroad passenger ferries. Ownership of the bridge passed through several different railroads including the Central New England Railway (CNE), New York, New Haven & Hartford Railroad (NH), Penn Central (PC) and Conrail.[7]

The bridge was strengthened in 1912 by engineer Ralph Modjeski, of the famed bridge civil engineering firm Modjeski and Masters, by adding a third line of trusses down the middle and by adding a central girder and additional interleaved columns, to safely handle the increased weight of freight trains that traversed the span.[8][9] In 1917–1918, the double tracks on the bridge were converted to gantlet track operation to center the weight of heavier NH 2-10-2 steam locomotives. Even so, speed across the bridge was severely restricted to 12 miles per hour,[10] as video indicates.[11] The gantlet tracks were replaced by a centered single track in 1959.[7]

During World War II, the bridge was a vital link for war freight traffic, and was guarded by United States Army soldiers 24 hours a day.[7]

Decline

From Poughkeepsie's Waryas Park (riverfront)
From Highland's Johnson-Iorio Park

Traffic across the bridge began a slow decline in the 1950s as industry shrank in New England and with it the need for the raw materials railroads excelled at transporting. Traffic from the connecting New York, Ontario & Western ceased when that railroad shut down in 1957. Another connection, the coal slate and cement-hauling Lehigh & New England shut down in 1961. At the same time, some new traffic began crossing the bridge like the New Haven's "Super Jet": one of the first trains to carry truck trailers. The Penn Central's acquisition of the New Haven in 1969 resulted in connecting traffic with the Erie Lackawanna being discouraged, as it competed with other Penn Central routes. After 1971, only one through train in each direction, for Erie Lackawanna, crossed the bridge.[12]

While the Penn Central did not connect with the old New Haven on the west side of the bridge, it came close. For a short time in 1969 and 1970, Penn Central ran a daily train between Cedar Hill Yard in New Haven, Connecticut and Potomac Yard in Alexandria, Virginia by way of the Lehigh and Hudson River Railway, which connected with the Penn Central Belvidere Division in Belvidere, New Jersey, 72 miles south of the old interchange with the New Haven at Maybrook Yard in Maybrook, New York. The service ended in a dispute over haulage charges and the traffic was diverted to the longer all-Penn Central route through Selkirk, New York. Ironically, the only reason the Lehigh and Hudson River was not part of the Penn Central was because a Penn Central predecessor, the Pennsylvania Railroad, had prevented the New Haven from acquiring it in 1905.[12] The Lehigh and Hudson River and Erie Lackawanna were finally joined with the Penn Central when all were taken over by Conrail in 1976.

On May 8, 1974, the eastern portion of the bridge suffered a tie fire that damaged about 700 feet (210 m) of the bridge decking and underlying girders.[13] It was likely started by a spark from an eastbound freight train that had just crossed the span.[14] The Penn Central had neglected the bridge's fire-protection system, which had no water on the day of the fire, and had laid-off employees who had previously kept watch for such fires.[5] A photograph of the last train, a run-through from the Erie Lackawanna, was included in a 40th anniversary web feature by the Poughkeepsie Journal.[15]

In August, 1974 the Penn Central applied for $1.75 million for repair and improvement of the bridge from the federal government through the Regional Rail Reorganization Act of 1973.[16] By 1975, efforts had shifted to acquiring a combination of state and railroad funding. In November 1975, a formal agreement between the New York State Department of Transportation and the trustees of the Penn Central was approved allowing the $359,000 insurance payout for the bridge to be spent on repairs, with the state paying the rest. In December, U.S. Representative Benjamin A. Gilman announced that $486,000 appropriated by the state legislature for repairs was undergoing final review by the state.[17] Authorization for the state to spend its share on bridge repairs had still not been given when, on April 1, 1976, ownership of the bridge changed.[18] Having been forced to include the route over the bridge (the Maybrook Line) in its new system at the behest of Connecticut Senator Abraham Ribicoff, Conrail announced that it would not promise to repair and use the bridge despite a Connecticut foundation's offer to pay half the repair cost if the bridge were used again. The railroad further said that other work required to make the route usable would raise the reactivation cost to $45.8 million.[19][20]

Seven years passed; pieces of the bridge's eastern approach viaduct over Poughkeepsie began falling onto U.S. Route 9 below, damaging passing vehicles. In response, the city successfully sued Conrail and forced it to spend $300,000 in 1983 to remove the decking over the superstructure. Subsequent to this event, Conrail sought to dispose of the unused bridge and eventually abandoned and tore-up its Maybrook Line between Hopewell Junction and Maybrook, New York in 1983–1984.[20]

Conrail made initial plans to sell the bridge to bridge enthusiast and lawyer Donald L. Pevsner, by an option granted to him on February 1, 1984.[21][21][22] Later in 1984, Conrail advised Pevsner to take title of the bridge in a shell corporation, with no assets but the bridge and no funds to pay for necessary insurance and maintenance; the railroad just wanted to be rid of the bridge, whatever the dubious ethics of such disposal. This decision was made personally by then-Conrail Chairman L. Stanley Crane, at a time when Conrail was owned by the U.S. Government. Pevsner refused, and let his option expire on November 1, 1984.[5] One day later, on November 2, 1984, Conrail sold the bridge for $1 to Gordon Schreiber Miller, of St. Davids, Pennsylvania, to "get it off the books.".[23] For the next fourteen years, Miller and his successor, Vito Moreno, spent little or nothing on maintenance or insurance, while attempting to drastically increase the $25,000 annual rent paid by Central Hudson Gas & Electric Corporation for its three 115,000-volt and three 69,000-volt power lines across the Hudson, attached to the south side of the bridge since 1949.[24] In response, Central Hudson de-energized those power lines and relocated them under the river in 1985, thereby ending Miller's only source of bridge income.[20] During this long period, critical bridge navigation lights were mostly inoperative, resulting in large U.S. Coast Guard fines against the Miller corporation that all went unpaid. Further, all of the 2,200-pound brackets that connected Central Hudson's de-energized high-tension power lines to the south side of the bridge continued to deteriorate by rusting. Though Central Hudson admitted that it normally had a legal duty to remove its abandoned power lines, it refused to remove its abandoned bridge-affixed lines, instead relying on a claim that it no longer owned the lines at issue pursuant to prior litigation with Conrail that was decided on September 26, 1984,[25] and won a similar legal opinion before the New York State Public Service Commission in 1995, which was left to stand on April 1, 1999 when The Poughkeepsie-Highland Railroad Bridge Company, Inc., as the successor owner to Gordon Schreiber Miller and Vito Moreno, withdrew its 1998 complaint against Central Hudson on January 27, 1999.[26]

Restoration

Detail of concrete decking and original steel structure
Opening Day crowds, October 3, 2009
The elevator as seen from Upper Landing Park

On June 4, 1998, following the long nonpayment of Dutchess and Ulster County taxes on the bridge by prior owners Gordon Schreiber Miller and his successor, Vito Moreno, Moreno deeded the bridge to a nonprofit volunteer organization called Walkway Over the Hudson, which took title through its nonprofit New York corporation, The Poughkeepsie-Highland Railroad Bridge Company, Inc., hoping to turn it into a pedestrian and cyclist walkway. The deed was recorded in both Counties on June 5, 1998. The former Central Hudson power lines were finally removed in 2009, as part of Walkway construction. On December 21, 2010, the Walkway corporation conveyed the entire structure to the New York State Bridge Authority, which restored high-limit liability insurance and "deep-pocket" maintenance assurance for the first time since November 2, 1984.[27] On September 5, 2009, conversion work and repairs to the structural steel and the laying of concrete slabs for the walkway were completed. The volunteer head of "Walkway", as it is known locally, said in 2008, "We think people will come from all over. It's the equivalent of the Eiffel Tower, or the Golden Gate Bridge."[28] The project initially received support from local residents, city and state officials totaling about $1,000,000, plus forgiveness of $550,000 in taxes inherited from the previous owners.[29][30] Then, Walkway solicited funding from both the State and Federal governments, for historic preservation, and from private philanthropic organizations.[31] Funding sources as of October 23, 2009, include:[32]

  • The Dyson Foundation, which has donated over $12 million, including assuming responsibility for over $10 million in lines of credit and loans that were made by Ulster Savings Bank and M&T Bank to complete the project in 2009.
  • New York State funding, from various entities, totals about $22.5 million.
  • Federal government funding, from various entities, totals about $3.5 million.
  • Scenic Hudson, Inc., which has donated $1 million.
  • The Jane W. Nuhn Charitable Trust has donated $500,000.
  • The M&T Charitable Foundation has donated between $50,000 and $100,000.
  • Amy P. Goldman and Sarah Arno have donated between $100,000 and $250,000.

The total budget as of October, 2009 totaled about $38.8 million. The Walkway Group raised a total of $30.7 million as of October 23, 2009. The $8.1 million deficit was financed by lines of credit from Ulster Savings Bank ($4 million) and M&T Bank ($4.1 million) that were drawn-upon to complete the project.[33] These lines of credit have been converted to loans, with a total present balance of over $10 million, which remain outstanding as of October 16, 2012. The Dyson Foundation, of Millbrook, New York, has assumed responsibility for the repayment of a large part of the loans (approximately $10 million). A smaller and remaining amount is still being used as a line of credit and is also guaranteed by the Dyson Foundation. At some point in the future, this remaining loan amount will be assumed and converted into another grant.[34]

The project was separated into four phases, with the first two completed as of October, 2009:[35]

  • Phase 1 – attain ownership of the bridge.
  • Phase 2 – structural analysis of the bridge and creation of a comprehensive plan, including budget and timeline for completion. The group also had to find funding for the project and secure funding for the start of construction.
  • Phase 3 – construct and open the first 1,800 feet (550 m) of the walkway on the Ulster side. The Dutchess side will get an elevator and 900 feet (270 m) of walkway. This phase was complete on October 3, 2009 (the grand-opening date), excepting a $2.3 million elevator installation in Poughkeepsie that was completed during the summer of 2014.
  • Phase 4 – construct and open the remaining 4,068 feet (1,240 m) of the walkway and its resultant connections to the Hudson Valley Rail Trail in Highland and the Dutchess Rail Trail in Poughkeepsie. The walkway was completed on September 5, 2009, and opened to the public on October 3, 2009. The Hudson Valley Rail Trail connection was finished in the autumn of 2010. The Dutchess Rail Trail connection has also been completed.

The piers were inspected in 2008 and given a clean bill of health.[citation needed] Similarly, Bergmann Associates, P.C. (of Rochester and Albany, New York), project engineers and managers, has stated in writing that the wind loads were carefully examined for the replacement, solid-concrete Walkway decking, and that this item is not a safety problem.[36] The decking work was completed on September 5, 2009. Walkway opened the bridge to the public on October 3, 2009, in time for the quadricentennial celebration of Henry Hudson sailing up the Hudson River, and that day handed it over to the New York State Office of Parks, Recreation and Historic Preservation for management. Despite this, inevitable comparisons have been drawn to the similar Kinzua Bridge, in northwestern Pennsylvania, which blew over in a microburst tornado when the bolts connecting the steel framework to the piers failed. Ironically, renovation work was going on to strengthen the corroded areas when the tornado destroyed most of this former Erie Railroad viaduct. During Hurricane Irene, residents living within 500 feet of the Poughkeepsie Bridge were evacuated as a precaution, and emergency repairs to reduce bridge sway (by the addition of new steel X-braces, supplanting the original turnbuckle-adjusted tension rods) were hurriedly installed.[citation needed]

The bridge became a National Recreation Trail in 2009.[37]

Walkway Over the Hudson State Historic Park

The walkway shortly after its opening

The opening ceremony of the Walkway Over the Hudson State Historic Park, on October 3, 2009, featured music by Pete Seeger, and was attended by Governor David Paterson, Senator Chuck Schumer, Congressman Maurice Hinchey, President of nearby Vassar College Catharine Bond Hill,[38] John May, engineer of the last train across the bridge,[39] and other officials. Paterson said, "This bridge is now the longest footbridge in the world."[40]

Reports by the end of 2009 were that the number of visitors to the walkway were much greater than expected, reaching approximately 415,000 as of December 29. Projections prior to the opening were of 267,000 visits per year, and are now 750,000 visits per year.[41]

The Bridge Walkway is operated as part of the New York State Historic Park System, open from 7:00 a.m. to dusk. Limited, wheelchair-friendly parking is available on either end of the bridge:

  • East End: 61 Parker Avenue, City of Poughkeepsie; charges $5 fee[42]
  • West End: 87 Haviland Road, Highland[42]

Restrooms are located at the ends of the Walkway, although at the time of a 2008 engineering survey of the bridge, there was "not a johnny on the spot".[43] Pets are permitted, but owners should bring equipment to clean up. Bicycles and roller blades (but not skateboards) are permitted, and the Walkway is flat and relatively wheelchair-friendly.[42]

New additions

On May 22, 2013, the Walkway Over the Hudson organization opened a new East Pavilion, built entirely through donations of money and services. The pavilion will be occupied by the volunteers who serve as Walkway Ambassadors who greet and offer assistance to visitors.[44]

In October 2013, a "mobile Web tour" was introduced, consisting of QR codes at locations throughout the Walkway which link to Web content related to the spot.[45]

In the summer of 2014, an elevator connecting Upper Landing Park to the Walkway was opened. This allows visitors to reach the center of the span via a more direct route. It also connects the Walkway to the Poughkeepsie waterfront area, which is near the railroad station, Mid-Hudson Children's Museum, and Waryas Park.

Events and incidents

The first footrace on the walkway occurred the day after the official opening on October 4, 2009. The 5k race started on the Highland side, crossed to the Poughkeepsie side and turned around at the parking lot and finished back in Highland. The race was won by James Boeding in a time of 16:26. The female winner was Kira DeCaprio in 20:12. There were 660 recorded finishers of the race.[46] The 5K race, called "Treetops to Rooftops", has become an annual event, organized by the Mid-Hudson Road Runners Club.[47]

On May 15, 2010, there was a lighting ceremony as LED-based lights were turned on for the first time, designed to allow nighttime use of the bridge, though due to funding limitations this is expected to only be used on special occasions. 3000 people paid $5 apiece to attend the sold-out ceremony.[48] Crowd management presented a problem, prompting criticism and an apology from the Walkway organization, but ultimately no incident or injury.[49]

On February 20, 2011, Don Kampfer, a Korean War veteran, died of a heart attack he suffered while participating in a monthly ceremony to retire and replace the American flag on the Walkway. Kampfer is the second person to die on the Walkway, the other also being from a heart attack while walking over the bridge.[50]

On July 27, 2011, an Ulster County man in his late 20s jumped off the bridge in the evening after it closed. His entry to the bridge set off an alarm, bringing the police, who found only his belongings; a suicide note was found later at his home. The man's body was recovered two days later.[51][52]

Though typically closed at sunset each day, the Walkway often has events after sundown. Some of these openings (such as for Independence Day and in December) include fireworks displays.[53] In July 2012, in a photograph taken from the Walkway, an amateur photographer captured what the New York Daily News described as a "breathtaking juxtaposition", capturing fireworks and a bolt of lightning in the same image.[54] Some of the night time events have featured members of the Mid Hudson Astronomical Association, who have provided telescopes for public viewing of the moon, stars, and planets from the Walkway,[55] along with lectures by local astronomer Bob Berman.[56]

The inaugural Walkway Marathon was held on June 13, 2015, with full and half marathons and a 5K run. The races sold out at 2500 athlete registrations and became verified as the first "Green" race in NY State by Athletes for a Fit Planet. The Walkway Marathon has become an annual event with the 2016 races set for June 12, 2016. The event's Health and Wellness Expo and Race Packet Pickup are set for Saturday, June 11th. A new addition to the 2016 event is the Think Differently Dash a one-mile race for people with physical and developmental disabilities.

See also

References

  1. http://atfiles.org/files/pdf/WalkwayOverHudson.pdf
  2. 2.0 2.1 Lua error in package.lua at line 80: module 'strict' not found.
  3. 3.0 3.1 Lua error in package.lua at line 80: module 'strict' not found.
  4. Longest Footbridge"
  5. 5.0 5.1 5.2 Lua error in package.lua at line 80: module 'strict' not found.
  6. POUGHKEEPSIE EAGLE Souvenir Edition dated January 1, 1889; plus independent engineering articles from the period.
  7. 7.0 7.1 7.2 Lua error in package.lua at line 80: module 'strict' not found.
  8. catskillarchive.com
  9. [1]
  10. Lua error in package.lua at line 80: module 'strict' not found.
  11. https://www.youtube.com/watch?v=SfZJzdNdm00&feature=youtu.be&t=1m50s Youtube video of train crossing Poughkeepsie Bridge in Greenfrog Video's New York Central Odyssey Vol-2
  12. 12.0 12.1 Lua error in package.lua at line 80: module 'strict' not found.
  13. Lua error in package.lua at line 80: module 'strict' not found.
  14. Lua error in package.lua at line 80: module 'strict' not found.
  15. Lua error in package.lua at line 80: module 'strict' not found.
  16. Lua error in package.lua at line 80: module 'strict' not found.
  17. Lua error in package.lua at line 80: module 'strict' not found.
  18. Lua error in package.lua at line 80: module 'strict' not found.
  19. Lua error in package.lua at line 80: module 'strict' not found.
  20. 20.0 20.1 20.2 Poughkeepsie Journal news stories.
  21. 21.0 21.1 Poughkeepsie Journal news stories (1984).
  22. Earlier demolition bids received by Conrail in 1983 were reported in Carleton Mabee's book, "Bridging The Hudson: The Poughkeepsie Railroad Bridge and Its Connecting Rail Lines", also cited in Footnote 3.
  23. For the entire saga of Donald Pevsner's involvement with Conrail, which saved the bridge from Conrail demolition in 1984, see his Oral History Project interview by the Hudson Valley Institute at Marist College, updated to March 17, 2004, at: www.hudsonrivervalley.org/themes/pdfs/pevsnerdonald
  24. Documentation of the annual rent amount paid by Central Hudson to Conrail prior to the Miller bridge purchase is located in New York State Public Service Commission records; in Court documents for the case of Consolidated Rail Corporation v. Central Hudson Gas & Electric Corporation (cited in Footnote 9); and in Poughkeepsie Journal news stories in 1984-5.
  25. Consolidated Rail Corporation v. Central Hudson Gas & Electric Corporation, Supreme Court, County of Westchester, State of New York.
  26. Dispute between Central Hudson Gas & Electric Corporation and The Poughkeepsie-Highland Railroad Bridge Company, Inc., New York State Public Service Commission CASE 98-E-0439.
  27. Walkway organization press release, December 22, 2010.
  28. Lua error in package.lua at line 80: module 'strict' not found.
  29. Lua error in package.lua at line 80: module 'strict' not found.
  30. Lua error in package.lua at line 80: module 'strict' not found.
  31. Lua error in package.lua at line 80: module 'strict' not found.
  32. Walkway Over The Hudson October, 2009 online newsletter.
  33. Walkway Over The Hudson online newsletter, Fall, 2009.
  34. Email from Steve Densmore, Press Liaison, The Dyson Foundation, to Donald L. Pevsner, dated October 16, 2012.
  35. Lua error in package.lua at line 80: module 'strict' not found.
  36. Email from Peter Melewski, Bergmann Associates, P.C. Project Manager (Albany, New York office), to Donald L. Pevsner, dated December 4, 2009: in possession of the Walkway Group.
  37. Lua error in package.lua at line 80: module 'strict' not found.
  38. Lua error in package.lua at line 80: module 'strict' not found.
  39. [2]
  40. Lua error in package.lua at line 80: module 'strict' not found.[dead link]
  41. Lua error in package.lua at line 80: module 'strict' not found.
  42. 42.0 42.1 42.2 http://www.walkway.org/directions
  43. Lua error in package.lua at line 80: module 'strict' not found.
  44. Lua error in package.lua at line 80: module 'strict' not found.
  45. Lua error in package.lua at line 80: module 'strict' not found.
  46. Lua error in package.lua at line 80: module 'strict' not found.
  47. Lua error in package.lua at line 80: module 'strict' not found.
  48. Lua error in package.lua at line 80: module 'strict' not found.
  49. Lua error in package.lua at line 80: module 'strict' not found.
  50. Lua error in package.lua at line 80: module 'strict' not found.
  51. Lua error in package.lua at line 80: module 'strict' not found.
  52. Lua error in package.lua at line 80: module 'strict' not found.[dead link]
  53. Lua error in package.lua at line 80: module 'strict' not found.
  54. Lua error in package.lua at line 80: module 'strict' not found.
  55. Lua error in package.lua at line 80: module 'strict' not found.
  56. Lua error in package.lua at line 80: module 'strict' not found.

External links