Wind power has become a significant energy source within South Australia over the past decade. As of August 2014, there was an installed capacity of 1,473 MW, which accounts for 27 per cent of electricity production in the state.[1] This represents around half of Australia's installed wind power capacity.

The development of wind power capacity in South Australia has been encouraged by a number of factors. These include the Australian Government's Renewable Energy Target, which require electricity retailers to source a proportion of energy from renewable sources, incentives from the South Australian Government including a supportive regulatory regime and a payroll tax rebate scheme for large scale renewable energy developments. Also the state's proximity to the Roaring forties means there are high quality wind resources for wind farms to exploit. In mid-2009, RenewablesSA was established by the South Australian Government to encourage further investment in renewable energy in the state.[2]

The load factor (or capacity factor) for South Australian wind farms is usually in the range 32-38%. This means that a wind farm could typically produce between 32 and 38% of its nameplate capacity averaged over a year.[3]

Wind farm overview

Early morning at Lake Bonney Wind Farm

In 2003 the only large wind turbine in South Australia was a 0.15 MW unit at Coober Pedy and by early 2004 there was 34 MW of installed wind power capacity.[3]

As of December 2010, South Australia had thirteen operational wind farms, with an installed capacity of 1,018 MW. By August 2014 this has increased to 1,473 MW, accounting for 27 per cent of electricity production.[1] As of late 2015 there are a large range of new wind farms in various stages of planning but only one under construction, the Hornsdale Wind Farm.

South Australia has provided regulatory certainty for wind farms, and the government has implemented land use planning policies which represent national best practice for accommodating wind farms.[4] On 2 June 2009, Premier Mike Rann announced plans to increase South Australia's renewable energy production target to 33% by 2020, well above the national target of 20% by 2020.[4]

Operational wind farms in South Australia: December 2015[5][6]
Installed capacity
(MW)
Wind farm Developer Stage Installed capacity
(MW)
Generating since...
369 Snowtown wind farm Trustpower 1 99 2008
2 270 November 2014
350 Hallett Wind Farm AGL Energy 1 95 March 2007
2 71 2009
4 132 June 2008
5 52 2012
278.5 Lake Bonney Wind Farm Infigen Energy 1 80 March 2005
2 159 September 2008
3 39 2010
111 Waterloo Wind Farm EnergyAustralia - 111 2010
91 Wattle Point Wind Farm AGL Hydro - 91 June 2005
70 Mount Millar Wind Farm Meridian Energy - 70 February 2006
66 Cathedral Rocks Wind Farm EnergyAustralia/
Acciona
- 66 2005
56 Clements Gap Wind Farm Pacific Hydro - 56 February 2010
46 Canunda Wind Farm GDF Suez/Mitsui - 46 March 2005
34 Starfish Hill Wind Farm RATCH Australia - 34 July 2003

Operational wind farms

<templatestyles src="Module:Hatnote/styles.css"></templatestyles>

Snowtown Wind Farm (369 MW)

It is located on the Barunga Range of hills west of Snowtown in the mid-North of South Australia and around 150 km north of the state capital, Adelaide. The first stage of the Snowtown wind farm with a capacity of 98.7 MW was completed in 2008.[7] The 270 MW second stage was completed in November 2014.[8]

Hallett Wind Farm (350 MW)

Hallett Wind Farm

Hallett Wind Farm was developed in four stages: Hallett 1 (also known as Brown Hill Wind Farm), Hallett 2 (Hallett Hill), Hallett 4 (North Brown Hill) and Hallett 5 (Bluff Range). The proposed Hallett 3 (Mt Bryan) wind farm was put on hold by AGL in 2012.[9]

Hallett 1 consists of 45 Suzlon 2.1 MW S88 turbines (95 MW in total) and was completed in June 2008. Hallett 2 consists of 34 2.1 MW Suzlon turbines (71.4 MW in total) and was completed in late 2009. Hallett 4 has 63 turbines with a total installed capacity of 132 MW, and was in full operation in early 2011. Hallett 5 consists of 25 Suzlon turbines each of 2.1 MW and was completed in early 2012.

Lake Bonney Wind Farm (278.5 MW)

Lake Bonney Wind Farm was built in three stages. Stage 1 consists of 46 turbines each having a rated capacity of 1.75 MW (total 80.5 MW) and was finished in March 2005. Construction of Stage 2 began in November 2006 and was finished around April 2008. Stage 2 consists of 53 turbines of 3 MW (total 159 MW). Stage 3 consists of 13 turbines of 3 MW (total 39 MW). The combined capacity of the three stages are 278.5 MW making it the biggest wind farm in Australia at the time of completion. [10]

Waterloo Wind Farm (111 MW, pending 19 MW expansion)

The Waterloo Wind Farm is a 111 MW wind farm which was completed in 2010 at an estimated cost of $300 million.[6] Thirty-seven Vestas V90 3 MW turbines stretch over the 18 km wind farm site and are connected through a 33 kilovolt (kV) internal reticulation network to the wind farm substation. The wind farm is approximately 30 kilometres south-east of the township of Clare and 100 km north of Adelaide.[11] A Stage 2 expansion was approved to add up to an additional 6 turbines to the existing farm and increase its total generating capacity to over 130 MW. Expansion is expected to commence in 2016.[12]

File:Wattle Point wind farm.jpg
Wattle Point wind farm near Edithburgh, South Australia.

Wattle Point Wind Farm (91 MW)

Wattle Point Wind Farm is near Edithburgh on the Yorke Peninsula. When it was officially opened in June 2005 it was Australia's largest wind farm at 91 MW. The installation consists of 55 wind turbines and was built at a cost of 165 million Australian dollars.

Mount Millar Wind Farm (70 MW)

Mount Millar Wind Farm is situated on an escarpment between the towns of Cowell and Cleve located 100 kilometres southwest of Whyalla. The 35 wind turbines are positioned on the elongated Mount Millar site (about 7 kilometres in length) to maximise wind exposure and can generate up to 70 megawatts of electricity. Construction of this wind farm started in late 2004 and was completed in December 2005. Power production started in February 2006.[3]

Cathedral Rocks Wind Farm (66 MW)

Cathedral Rocks Wind Farm is in a remote coastal area located near the southern tip of the Eyre Peninsula in South Australia, about 30 km south west of Port Lincoln. It has 33 wind turbines capable of generating 66 MW in total. Construction started in 2004, and the first turbines were commissions in late 2005. The wind farm was fully operational by 2007.[13]

Clements Gap Wind Farm (56 MW)

Canunda wind farm at sunrise

In February 2010, Pacific Hydro opened the 56.7 MW Clements Gap Wind Farm. The wind farm is located in South Australia’s mid-north. The project has 27 x 2.1 MW Suzlon wind turbines, which generate enough electricity for 30,000 homes.[14]

Canunda Wind Farm (46 MW)

Canunda Wind Farm is a $92.5 million, 46 MW wind power project located on grazing land approximately 16 kilometres south of Millicent.[15] The wind farm is made up of 23 Vestas 2.0 MW wind turbines. The project was opened in March 2005.

File:StarfishHill.jpg
Some of the turbines at Starfish Hill wind farm; Gulf St Vincent in background

Starfish Hill Wind Farm (34.5 MW)

Starfish Hill Wind Farm is near Cape Jervis on the Fleurieu Peninsula. It comprises 23 turbines of 1.5 MW each, with 8 turbines on Starfish Hill and 15 on the nearby Salt Creek Hill, giving a combined generating capacity of 34.5 MW. Starfish Hill Wind Farm was commissioned in September 2003, making it the first major wind farm in South Australia.[16]

Wind farm proposals

In addition to its operating wind farms, South Australia has several proposals for new farms at various stages of development. These include:

Designed capacity
(MW)
Wind farm Location Developer Development Status Expected operational date
600 CERES Project Yorke Peninsula Senvion Australia (formerly REpower Australia) 2014 approved 2016[17]
206.5 Port Augusta Renewable Energy Park south of Port Augusta DP Energy Pending approval, construction expected to commence in 2017 [18]
270 Hornsdale Jamestown Hornsdale Asset Co (formerly Investec Bank) 2013 approved, Under construction in 2016[19] 2016-2017[20][21]
105 Keyneton Keyneton Pacific Hydro 2013 approved[22] [23]
100-110 Stony Gap near Burra[24] EnergyAustralia 2014 approved[25] [26][21]
144-250 Exmoor Naracoorte Acciona 2017[27][21]
350 Woakwine near Beachport Infigen Energy 2012 approved[28] [29][21]
96-122 Willogoleche near Hallett GDF Suez 2018[21]
375 Palmer Palmer TrustPower 2018[21]
120 Kongorong west of Mount Gambier Ratch Australia [21]
110 Kulpara northwest of Port Wakefield Ratch Australia [21]
195 Lincoln Gap Between Port Augusta and Whyalla OneWind Australia 2018[21]
320 Tungketta Hill Between Elliston and Sheringa[30] Ausker Energies 2017-2019[21]
180 Barn Hill near Redhill AGL Energy 2009 approved, 2013 revised[31] [21]

Impacts

The increasing proportion of renewable energy in the state has caused a significant decrease in the emissions intensity of electricity generation in South Australia.

The rapid development of wind power in South Australia has led to direct economic effects from the construction and operation of wind farms. There has been a total of $2.8 billion in wind power investment up to October 2011 which is estimated to have created 3,000 direct and indirect jobs.[32] Studies into the economic effects of wind farms have reported that a 50 MW installation pays host landholders some $250,000 per year, is constructed by workers who spend up to $1.2 million locally and contributes up to $80,000 annually to community projects.[33]

Policies to streamline the approval process for wind farm developments have met with some community opposition. Specific concerns have been raised by rural residents who claim that wind farms have an unacceptable impact on property values, health and the environment.[34]

There has been some controversy with respect to the impact of the rising share of wind power and other renewables such as solar on retail electricity prices in South Australia. A 2012 report by The Energy Users Association of Australia claimed that retail electricity prices in South Australia were then the third highest in the developed world behind Germany and Denmark, with prices likely to rise to become the most expensive in the near future.[35] The then South Australian Opposition Leader, Isobel Redmond, linked the state's high retail prices for electricity to the Government's policy of promoting development of renewable energy, noting that Germany and Denmark had followed similar policies.[36] On the other hand, it has been noted that the impact of wind power on the merit order effect, where relatively low cost wind power is purchased by retailers before higher cost sources of power, has been credited for a decline in the wholesale electricity price in South Australia.[37] Data compiled by the Australian Energy Market Operator (AEMO) shows South Australian wholesale electricity prices are the third highest out of Australia's five mainland states,[38] with the 2013 South Australian Electricity Report noting that increases in prices were "largely driven by transmission and distribution network price increases".[39]

The South Australian Government has stated that the price increase due to the Australian Government's carbon price (in place from July 2012 to June 2014) was approximately half of that experienced by other states due to the high installed capacity of wind and gas-fired generation.[40]

2011 Renewable Energy Plan

In October 2011 the South Australian state Government released a renewable energy plan proposing a range of measures including:[32][41]

  • a revised renewable energy target of 33% of the state's electricity production coming from renewable sources by 2020
  • a ban on new coal-fired power stations
  • greater involvement of local government in the development approval process to promote more effective community engagement
  • investigations into increasing the capacity of transmission lines to support renewable energy developments including wind energy
  • no wind farms allowed within one kilometre of any home unless agreement is reached between the developer and the home owner.

See also

References

  1. 1.0 1.1 Government of South Australia: "Wind energy in South Australia", updated 4 August 2014, retrieved 4 November 2014
  2. Lua error in package.lua at line 80: module 'strict' not found.
  3. 3.0 3.1 3.2 Wind power and wind farms in South Australia
  4. 4.0 4.1 Government of South Australia (8 December 2010). Renewable Energy in South Australia
  5. Wind in the Bush
  6. 6.0 6.1 New, Robert (November 2010). Electricity generation Major development projects - October 2010 listing Australian Bureau of Agricultural and Resource Economics, p. 8.
  7. Lua error in package.lua at line 80: module 'strict' not found.
  8. Vorrath, Sophie: "South Australia’s 270MW Snowtown takes wind energy to new highs", in RenewEconomy, 3 November 2014
  9. Lua error in package.lua at line 80: module 'strict' not found.
  10. Wind power and wind farms in South Australia: Wind in the Bush
  11. Lua error in package.lua at line 80: module 'strict' not found.
  12. Lua error in package.lua at line 80: module 'strict' not found.
  13. Lua error in package.lua at line 80: module 'strict' not found.
  14. Clements Gap Wind Farm opened EcoGeneration, 25 February 2010.
  15. Wind Prospect (undated). Wind: Clean, Safe, Australia's Future
  16. Lua error in package.lua at line 80: module 'strict' not found.
  17. Lua error in package.lua at line 80: module 'strict' not found.
  18. http://dpenergy.info/parep/wp-content/uploads/2015/04/Port-Augusta_DA-Process_final_22Apr15.pdf
  19. Lua error in package.lua at line 80: module 'strict' not found.
  20. Lua error in package.lua at line 80: module 'strict' not found.
  21. 21.00 21.01 21.02 21.03 21.04 21.05 21.06 21.07 21.08 21.09 21.10 http://www.industry.gov.au/Office-of-the-Chief-Economist/Publications/Documents/megp/2015-Project-list.xlsx
  22. Lua error in package.lua at line 80: module 'strict' not found.
  23. http://www.pacifichydro.com.au/files/2012/06/Exec-summary-.pdf
  24. Lua error in package.lua at line 80: module 'strict' not found.
  25. Lua error in package.lua at line 80: module 'strict' not found.
  26. Lua error in package.lua at line 80: module 'strict' not found.
  27. Lua error in package.lua at line 80: module 'strict' not found.
  28. Lua error in package.lua at line 80: module 'strict' not found.
  29. Lua error in package.lua at line 80: module 'strict' not found.
  30. Lua error in package.lua at line 80: module 'strict' not found.
  31. Lua error in package.lua at line 80: module 'strict' not found.
  32. 32.0 32.1 South Australia's renewable energy plan wins praise
  33. Benefits of wind energy in Australia
  34. South East residents join wind power protest
  35. SA power prices to be highest in the world
  36. Heat blamed for high SA electricity prices
  37. South Australia's big win with wind
  38. http://www.pc.gov.au/__data/assets/pdf_file/0004/109921/13-carbon-prices-appendixd.pdf
  39. http://www.aemo.com.au/Electricity/Planning/South-Australian-Advisory-Functions/South-Australian-Electricity-Report
  40. Electricity and gas prices to jump 18% in SA