Azad Pattan Hydropower Project
From Infogalactic: the planetary knowledge core
Azad Pattan Hydropower Project | |
---|---|
Project Layout
|
|
Location of Azad Pattan Hydropower Project in Pakistan
|
|
Country | Pakistan |
Location | Sudhanoti_District, Azad Kashmir |
Coordinates | Lua error in package.lua at line 80: module 'strict' not found. |
Status | Proposed |
Opening date | 2022 |
Owner(s) | Laraib Group |
Dam and spillways | |
Type of dam | Gravity dam, Run of the river |
Impounds | Jhelum River |
Height | 90 m (295 ft) |
Length | 80 m (262 ft) |
Power station | |
Turbines | 4 x 160 MW |
Installed capacity | 640 MW (10% continuous overload) |
Annual generation | 3064 GWh |
The Azad Pattan Hydropower Project is a proposed 640 MW hydroelectric power station on the Jhelum River roughly 7 km upstream of Azad Pattan Bridge in the Sudhanoti District of Azad Kashmir and 90 km from Islamabad, the capital city of Pakistan.[1][2]
See also
- List of power stations in Pakistan
- New Bong Escape Hydropower Project
- Patrind Hydropower Project
- Gulpur Hydropower Project
- Mangla Dam
References
External links
Lua error in package.lua at line 80: module 'strict' not found.
- http://www.laraibgroup.com/
- https://cdm.unfccc.int/Projects/Validation/DB/DZFS0QLBPVPUHF7J6RTTHVA1NYBYJD/view.html
- http://www.ppib.gov.pk/N_hydel_with_loi.htm
<templatestyles src="Asbox/styles.css"></templatestyles>